Excavations in the vicinity of the antiflood embankments – calculating issues
26 kwi 2022
O artykule
Kategoria artykułu: Research Article
Data publikacji: 26 kwi 2022
Zakres stron: 138 - 147
Otrzymano: 23 kwi 2020
Przyjęty: 17 lut 2022
DOI: https://doi.org/10.2478/sgem-2022-0006
Słowa kluczowe
© 2022 Michał Grodecki, published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
According to Polish law, it is prohibited to perform excavations or locate buildings closer than 50 m from the embankment. In order to obtain exemption from this ban, filtration and stability analysis of the embankment and excavation in the flood conditions have to be performed. This paper presents results of the numerical investigations on interactions between excavations and embankment. Complex nature of the problem is presented. Methodology of numerical simulations and real case examples are described.