[
Arain, F. M., Assaf, S., & Pheng, L. S. (2004). Causes of discrepancies between design and construction. Architectural Science Review, 47(3), 237–249. http://doi.org/10.1080/00038628.2000.9697530
]Search in Google Scholar
[
Berihu, L. G., Grum, B., Tariku, Z., & Abebe, B. A. (2023). Causes, effects, and mitigation measures of time and cost overruns in water supply projects: Case of Tigrai Region, Northern Ethiopia. Advances in Civil Engineering, 12(3), 123–133. https://doi.org/10.1155/2023/7113730
]Search in Google Scholar
[
Bromilow, F. J. (1969). Contract time performance expectations and the reality. Building Forum, 1(3), 70–80.
]Search in Google Scholar
[
Chan, A. P. (2001). Time–cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19(4), 223–229. https://doi.org/10.1016/S0263-7863(99)00072-1
]Search in Google Scholar
[
Chaudhary, D. (2019). The decentralization, devolution and local governance practices in Nepal: The emerging challenges and concerns. Journal of Political Science, 19, 43–64. http://doi.org/10.3126/jps.v19i0.26698
]Search in Google Scholar
[
Guo, J. X., Hu, C. M., & Bao, R. (2019). Predicting the duration of a general contracting industrial project based on the residual modified model. KSCE Journal of Civil Engineering, 23(8), 3275–3284. https://doi.org/10.1007/s12205-019-1543-7
]Search in Google Scholar
[
Koirala, N. (2021). Variations order of building construction project: A case from Nepal. Journal of Advanced Research in Construction and Urban Architecture, 6(2), 25–33. http://doi.org/10.24321/2456.9925.202105
]Search in Google Scholar
[
Mak, M. Y., Ng, S. T., Chen, S. E., & Varnam, M. (2000). The relationship between economic indicators and Bromilow’s time-cost model: A pilot study. In A. Akintoye (Ed.), Proceedings of the 16th Annual ARCOM Conference (pp. 587–595).
]Search in Google Scholar
[
Pandeya, G. P. (2015). Does citizen participation in local government decision-making contribute to strengthening local planning and accountability systems? An empirical assessment of stakeholders’ perceptions in Nepal. International Public Management Review, 16(1), 67–98.
]Search in Google Scholar
[
Pokhrel, P., Misra, J., Nepal, D. B., & Adhikari, P. (2021). Estimation of construction duration for roads and bridges in Nepal. Nepal Journal of Civil Engineering, 1(1), 41–49. https://doi.org/10.3126/njce.v1i1.43372
]Search in Google Scholar
[
Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012). Time and cost performance of construction projects in southern and central regions of Peninsular Malaysia. Colloquium on Humanities, Science and Engineering (CHUSER), 52–57.
]Search in Google Scholar
[
Rauzana, A. (2016). Analysis of causes of delay and time performance in construction projects. IOSR Journal of Mechanical and Civil Engineering, 13(5), 116–121. https://doi.org/10.9790/1684-130503116121
]Search in Google Scholar
[
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
]Search in Google Scholar
[
Sigdel, S. (2023). Causes of delays in residential building construction at Gaindakot Municipality, Nepal. Zenodo. https://doi.org/10.5281/zenodo.15201198
]Search in Google Scholar
[
Sigdel, S., Awasthi, K. D., & Bohora, N. (2022). Perceptions of stakeholders about technical capacity and performance of local builders in residential building construction sites at Gaindakot Municipality, Nepal. Zenodo (CERN European Organization for Nuclear Research). https://doi.org/10.5281/zenodo.7313392
]Search in Google Scholar
[
Suwal, A., & Shrestha, S. K. (2016). Causes of delays of motorable bridge construction under postal highway projects, Department of Roads. Journal of Advanced College of Engineering and Management, 2, 85–92. https://doi.org/10.3126/jacem.v2i0.16101
]Search in Google Scholar
[
Taye, M. (2016). Assessment of time and cost overruns in construction projects: A case study at Defense Construction Enterprise. Doctoral dissertation, St. Mary’s University.
]Search in Google Scholar
[
Yadav, S. K., & Mishra, A. K. (2019). Status of time and cost overrun of health building construction projects in Nepal. Scholars Journal of Engineering and Technology, 7(9), 262–270.
]Search in Google Scholar