Enhancing Project Delivery in Gaindakot Municipality, Nepal, Through the Bromilow Time-Cost Model: A Strategic Mitigation Approach

 e   
17 mag 2025
INFORMAZIONI SU QUESTO ARTICOLO

Cita
Scarica la copertina

Arain, F. M., Assaf, S., & Pheng, L. S. (2004). Causes of discrepancies between design and construction. Architectural Science Review, 47(3), 237–249. http://doi.org/10.1080/00038628.2000.9697530 Search in Google Scholar

Berihu, L. G., Grum, B., Tariku, Z., & Abebe, B. A. (2023). Causes, effects, and mitigation measures of time and cost overruns in water supply projects: Case of Tigrai Region, Northern Ethiopia. Advances in Civil Engineering, 12(3), 123–133. https://doi.org/10.1155/2023/7113730 Search in Google Scholar

Bromilow, F. J. (1969). Contract time performance expectations and the reality. Building Forum, 1(3), 70–80. Search in Google Scholar

Chan, A. P. (2001). Time–cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19(4), 223–229. https://doi.org/10.1016/S0263-7863(99)00072-1 Search in Google Scholar

Chaudhary, D. (2019). The decentralization, devolution and local governance practices in Nepal: The emerging challenges and concerns. Journal of Political Science, 19, 43–64. http://doi.org/10.3126/jps.v19i0.26698 Search in Google Scholar

Guo, J. X., Hu, C. M., & Bao, R. (2019). Predicting the duration of a general contracting industrial project based on the residual modified model. KSCE Journal of Civil Engineering, 23(8), 3275–3284. https://doi.org/10.1007/s12205-019-1543-7 Search in Google Scholar

Koirala, N. (2021). Variations order of building construction project: A case from Nepal. Journal of Advanced Research in Construction and Urban Architecture, 6(2), 25–33. http://doi.org/10.24321/2456.9925.202105 Search in Google Scholar

Mak, M. Y., Ng, S. T., Chen, S. E., & Varnam, M. (2000). The relationship between economic indicators and Bromilow’s time-cost model: A pilot study. In A. Akintoye (Ed.), Proceedings of the 16th Annual ARCOM Conference (pp. 587–595). Search in Google Scholar

Pandeya, G. P. (2015). Does citizen participation in local government decision-making contribute to strengthening local planning and accountability systems? An empirical assessment of stakeholders’ perceptions in Nepal. International Public Management Review, 16(1), 67–98. Search in Google Scholar

Pokhrel, P., Misra, J., Nepal, D. B., & Adhikari, P. (2021). Estimation of construction duration for roads and bridges in Nepal. Nepal Journal of Civil Engineering, 1(1), 41–49. https://doi.org/10.3126/njce.v1i1.43372 Search in Google Scholar

Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012). Time and cost performance of construction projects in southern and central regions of Peninsular Malaysia. Colloquium on Humanities, Science and Engineering (CHUSER), 52–57. Search in Google Scholar

Rauzana, A. (2016). Analysis of causes of delay and time performance in construction projects. IOSR Journal of Mechanical and Civil Engineering, 13(5), 116–121. https://doi.org/10.9790/1684-130503116121 Search in Google Scholar

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007 Search in Google Scholar

Sigdel, S. (2023). Causes of delays in residential building construction at Gaindakot Municipality, Nepal. Zenodo. https://doi.org/10.5281/zenodo.15201198 Search in Google Scholar

Sigdel, S., Awasthi, K. D., & Bohora, N. (2022). Perceptions of stakeholders about technical capacity and performance of local builders in residential building construction sites at Gaindakot Municipality, Nepal. Zenodo (CERN European Organization for Nuclear Research). https://doi.org/10.5281/zenodo.7313392 Search in Google Scholar

Suwal, A., & Shrestha, S. K. (2016). Causes of delays of motorable bridge construction under postal highway projects, Department of Roads. Journal of Advanced College of Engineering and Management, 2, 85–92. https://doi.org/10.3126/jacem.v2i0.16101 Search in Google Scholar

Taye, M. (2016). Assessment of time and cost overruns in construction projects: A case study at Defense Construction Enterprise. Doctoral dissertation, St. Mary’s University. Search in Google Scholar

Yadav, S. K., & Mishra, A. K. (2019). Status of time and cost overrun of health building construction projects in Nepal. Scholars Journal of Engineering and Technology, 7(9), 262–270. Search in Google Scholar