Cite

Ahmed, M. O., El-Adaway, I. H., Coatney, K. T., & Eid, M. S. (2016). Construction bidding and the winner’s curse: Game theory approach. Journal of Construction Engineering and Management, 142(2), pp. 04015076. AhmedM. O. El-AdawayI. H. CoatneyK. T. EidM. S. 2016 Construction bidding and the winner’s curse: Game theory approach Journal of Construction Engineering and Management 142 2 04015076 10.1061/(ASCE)CO.1943-7862.0001058 Search in Google Scholar

Cantarelli, C. C., Flyvbjerg, B., & Buhl, S. L. (2012). Geographical variation in project cost performance: The Netherlands versus worldwide. Journal of Transport Geography, 24, pp. 324–331. CantarelliC. C. FlyvbjergB. BuhlS. L. 2012 Geographical variation in project cost performance: The Netherlands versus worldwide Journal of Transport Geography 24 324 331 10.1016/j.jtrangeo.2012.03.014 Search in Google Scholar

Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & Wee, B. (2010). Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. European Journal of Transport and Infrastructure, 10(1), pp. 30–41. CantarelliC. C. FlyvbjergB. MolinE. J. E. WeeB. 2010 Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness European Journal of Transport and Infrastructure 10 1 30 41 Search in Google Scholar

Cantarelli, C., van Wee, B., Molina, E. J. E., & Flyvbjerg, B. (2012). Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, 22, pp. 88–95. CantarelliC. van WeeB. MolinaE. J. E. FlyvbjergB. 2012 Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects Transport Policy 22 88 95 10.1016/j.tranpol.2012.04.002 Search in Google Scholar

Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), pp. 279–295. FlyvbjergB. HolmM. S. BuhlS. 2002 Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association 68 3 279 295 10.1080/01944360208976273 Search in Google Scholar

Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), pp. 71–88. FlyvbjergB. Skamris HolmM. K. BuhlS. L. 2003 How common and how large are cost overruns in transport infrastructure projects? Transport Reviews 23 1 71 88 10.1080/01441640309904 Search in Google Scholar

Ghoddousi, P., Hosseini, M. R. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and Economic Development of Economy, 18(1), pp. 99–116. GhoddousiP. HosseiniM. R. 2012 A survey of the factors affecting the productivity of construction projects in Iran Technological and Economic Development of Economy 18 1 99 116 10.3846/20294913.2012.661203 Search in Google Scholar

Gustafsson, A. (2016, 14 November). Notan för Nya Karolinska skulle räcka till två Slussen. Dagens Nyheter. Available at https://www.dn.se/sthlm/notan-for-nya-karolinska-skulle-racka-till-tva-slussen/ GustafssonA. 2016 14 November Notan för Nya Karolinska skulle räcka till två Slussen Dagens Nyheter Available at https://www.dn.se/sthlm/notan-for-nya-karolinska-skulle-racka-till-tva-slussen/ Search in Google Scholar

Heravi, G., & Charkhakan, M. H. (2014). Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique. Journal of Management in Engineering, 30(6), pp. 04014028. HeraviG. CharkhakanM. H. 2014 Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique Journal of Management in Engineering 30 6 04014028 10.1061/(ASCE)ME.1943-5479.0000229 Search in Google Scholar

Idrottens Affärer. (2013, 25 December). Arenakostnaderna uppe i 8 miljarder. Available at www.idrottensaffarer.se Idrottens Affärer 2013 25 December Arenakostnaderna uppe i 8 miljarder Available at www.idrottensaffarer.se Search in Google Scholar

Johnson, R. M., & Babu, R. I. I. (2020). Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402–411. JohnsonR. M. BabuR. I. I. 2020 Time and cost overruns in the UAE construction industry: A critical analysis International Journal of Construction Management 20 5 402 411 10.1080/15623599.2018.1484864 Search in Google Scholar

Kamminga, P. (2015). Rethinking contract design: Why incorporating non-legal drivers of contractual behavior in contracts may lead to better results in complex defense systems procurement. Journal of Public Procurement, 15(2), pp. 208–235. KammingaP. 2015 Rethinking contract design: Why incorporating non-legal drivers of contractual behavior in contracts may lead to better results in complex defense systems procurement Journal of Public Procurement 15 2 208 235 10.1108/JOPP-15-02-2015-B004 Search in Google Scholar

Keane, P., Sertyesilisik, B., & Ross, A. D. (2010). Variations and change orders on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2(2), pp. 89–96. KeaneP. SertyesilisikB. RossA. D. 2010 Variations and change orders on construction projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 2 2 89 96 10.1061/(ASCE)LA.1943-4170.0000016 Search in Google Scholar

Khanzadi, M., Nasirzadeh, F., & Dashti, M. S. (2018). Fuzzy cognitive map approach to analyze causes of change orders in construction projects. Journal of Construction Engineering and Management, 144(2), pp. 04017111. KhanzadiM. NasirzadehF. DashtiM. S. 2018 Fuzzy cognitive map approach to analyze causes of change orders in construction projects Journal of Construction Engineering and Management 144 2 04017111 10.1061/(ASCE)CO.1943-7862.0001430 Search in Google Scholar

Lehtinen, J., Peltokorpi, A., & Artto, K. (2019). Megaprojects as organizational platforms and technology platforms for value creation. International Journal of Project Management, 37(1), pp. 43–58. LehtinenJ. PeltokorpiA. ArttoK. 2019 Megaprojects as organizational platforms and technology platforms for value creation International Journal of Project Management 37 1 43 58 10.1016/j.ijproman.2018.10.001 Search in Google Scholar

Littorin, J. (2015). Hallandsåstunneln öppnar – 18 år försenat. Dagens Nyheter. 8 December. Available at http://dn.se LittorinJ. 2015 Hallandsåstunneln öppnar – 18 år försenat Dagens Nyheter 8 December Available at http://dn.se Search in Google Scholar

Liu, J., Zuo, J., Sun, Z., Zillante, G., & Chen, X. (2013). Sustainability in hydropower development—A case study. Renewable and Sustainable Energy Reviews, 19, pp. 230–237. LiuJ. ZuoJ. SunZ. ZillanteG. ChenX. 2013 Sustainability in hydropower development—A case study Renewable and Sustainable Energy Reviews 19 230 237 10.1016/j.rser.2012.11.036 Search in Google Scholar

Makovšek, D., Tominc, P., & Logožar, K. (2012). A cost performance analysis of transport infrastructure construction in Slovenia. Transportation, 39(1), pp. 197–214. MakovšekD. TomincP. LogožarK. 2012 A cost performance analysis of transport infrastructure construction in Slovenia Transportation 39 1 197 214 10.1007/s11116-011-9319-z Search in Google Scholar

Odeck, J. (2004). Cost overruns in road construction—What are their sizes and determinants? Transport Policy, 11(1), pp. 43–53. OdeckJ. 2004 Cost overruns in road construction—What are their sizes and determinants? Transport Policy 11 1 43 53 10.1016/S0967-070X(03)00017-9 Search in Google Scholar

Park, Y., & Papadopoulou, T. (2012). Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195–216. ParkY. PapadopoulouT. 2012 Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size Built Environment Project and Asset Management 2 2 195 216 10.1108/20441241211280873 Search in Google Scholar

Pesämaa, O., Dahlin, P., & Öberg, C. (2018). Reduction of tension effects on partner evaluation. Marketing Intelligence & Planning, 36(4), pp. 425–439. PesämaaO. DahlinP. ÖbergC. 2018 Reduction of tension effects on partner evaluation Marketing Intelligence & Planning 36 4 425 439 10.1108/MIP-11-2017-0271 Search in Google Scholar

Pesämaa, O., Larsson, J., & Eriksson, P. E. (2018). Role of performance feedback on process performance in construction projects: Client and contractor perspectives. Journal of Management in Engineering, 34(4), pp. 04018023. PesämaaO. LarssonJ. ErikssonP. E. 2018 Role of performance feedback on process performance in construction projects: Client and contractor perspectives Journal of Management in Engineering 34 4 04018023 10.1061/(ASCE)ME.1943-5479.0000619 Search in Google Scholar

Qiu, Y., Chen, H., Sheng, Z., & Cheng, S. (2019). Governance of institutional complexity in megaproject organizations. International Journal of Project Management, 37(3), pp. 425–443. QiuY. ChenH. ShengZ. ChengS. 2019 Governance of institutional complexity in megaproject organizations International Journal of Project Management 37 3 425 443 10.1016/j.ijproman.2019.02.001 Search in Google Scholar

Rokkan, A. I., Heide, J. B., & Wathne, K. H. (2003). Specific investments in marketing relationships: Expropriation and bonding effects. Journal of Marketing Research, 40(2), pp. 210–224. RokkanA. I. HeideJ. B. WathneK. H. 2003 Specific investments in marketing relationships: Expropriation and bonding effects Journal of Marketing Research 40 2 210 224 10.1509/jmkr.40.2.210.19223 Search in Google Scholar

Ruoslahti, H. (2018). Co-creation of knowledge for innovation requires multi-stakeholder public relations. Public Relations and the Power of Creativity, Advances in Public Relations and Communication Management, 3, pp. 115–133. RuoslahtiH. 2018 Co-creation of knowledge for innovation requires multi-stakeholder public relations Public Relations and the Power of Creativity, Advances in Public Relations and Communication Management 3 115 133 10.1108/S2398-391420180000003007 Search in Google Scholar

Segelod, E. (2017). Project Cost Overrun: Causes, Consequences, and Investment Decisions. Cambridge University Press, Cambridge. doi: 10.1017/9781316779675.009 SegelodE. 2017 Project Cost Overrun: Causes, Consequences, and Investment Decisions Cambridge University Press Cambridge 10.1017/9781316779675.009 Open DOISearch in Google Scholar

Senescu, R. R., Aranda-Mena, G., & Haymaker, J. R. (2013). Relationships between project complexity and communication. Journal of Management in Engineering, 29(2), pp. 183–197. SenescuR. R. Aranda-MenaG. HaymakerJ. R. 2013 Relationships between project complexity and communication Journal of Management in Engineering 29 2 183 197 10.1061/(ASCE)ME.1943-5479.0000121 Search in Google Scholar

Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), pp. 1471–1480. ShehuZ. EndutI. R. AkintoyeA. HoltG. D. 2014 Cost overrun in the Malaysian construction industry projects: A deeper insight International Journal of Project Management 32 8 1471 1480 10.1016/j.ijproman.2014.04.004 Search in Google Scholar

Swedbank. (2013). Ny Nationalarena i Solna AB: Swedbank Arena. Stockholm. Available at https://www.swedbank.se/idc/groups/public/@i/@sbg/@gs/@com/documents/article/fm_478566.pdf Swedbank 2013 Ny Nationalarena i Solna AB: Swedbank Arena Stockholm Available at https://www.swedbank.se/idc/groups/public/@i/@sbg/@gs/@com/documents/article/fm_478566.pdf Search in Google Scholar

Themsen, T. N. (2019). The processes of public megaproject cost estimation: The inaccuracy of reference class forecasting. Financial Accountability & Management, 35(4), pp. 337–352. ThemsenT. N. 2019 The processes of public megaproject cost estimation: The inaccuracy of reference class forecasting Financial Accountability & Management 35 4 337 352 10.1111/faam.12210 Search in Google Scholar

Tsai, W. H., Lin, S. J., Liu, J. Y., Lin, W. R., & Lee, K. C. (2011). Incorporating life cycle assessments into building project decision-making: An energy consumption and CO2 emission perspective. Energy, 36(5), pp. 3022–3029. TsaiW. H. LinS. J. LiuJ. Y. LinW. R. LeeK. C. 2011 Incorporating life cycle assessments into building project decision-making: An energy consumption and CO2 emission perspective Energy 36 5 3022 3029 10.1016/j.energy.2011.02.046 Search in Google Scholar

Wathne, K. H., & Heide, J. B. (2000). Opportunism in interfirm relationships: Forms, outcomes, and solutions. Journal of Marketing, 64(4), pp. 36–51. doi: 10.1509/jmkg.64.4.36.18070. WathneK. H. HeideJ. B. 2000 Opportunism in interfirm relationships: Forms, outcomes, and solutions Journal of Marketing 64 4 36 51 10.1509/jmkg.64.4.36.18070 Open DOISearch in Google Scholar

Wu, C. H., Hsieh, T. Y., & Cheng, W. L. (2005). Statistical analysis of causes for design change in highway construction on Taiwan. International Journal of Project Management, 23(7), pp. 554–563. WuC. H. HsiehT. Y. ChengW. L. 2005 Statistical analysis of causes for design change in highway construction on Taiwan International Journal of Project Management 23 7 554 563 10.1016/j.ijproman.2004.07.010 Search in Google Scholar

Zhang, J., Li, H., Olanipekun, A. O., & Bai, L. (2019). A successful delivery process of green buildings: The project owners’ view, motivation and commitment. Renewable Energy, 138, pp. 651–658. ZhangJ. LiH. OlanipekunA. O. BaiL. 2019 A successful delivery process of green buildings: The project owners’ view, motivation and commitment Renewable Energy 138 651 658 10.1016/j.renene.2019.02.002 Search in Google Scholar

eISSN:
1847-6228
Idioma:
Inglés
Calendario de la edición:
Volume Open
Temas de la revista:
Engineering, Introductions and Overviews, other