Ahmed, M. O., El-Adaway, I. H., Coatney, K. T., & Eid, M. S. (2016). Construction bidding and the winner’s curse: Game theory approach. Journal of Construction Engineering and Management, 142(2), pp. 04015076.AhmedM. O.El-AdawayI. H.CoatneyK. T.EidM. S.2016Construction bidding and the winner’s curse: Game theory approachJournal of Construction Engineering and Management14220401507610.1061/(ASCE)CO.1943-7862.0001058Search in Google Scholar
Cantarelli, C. C., Flyvbjerg, B., & Buhl, S. L. (2012). Geographical variation in project cost performance: The Netherlands versus worldwide. Journal of Transport Geography, 24, pp. 324–331.CantarelliC. C.FlyvbjergB.BuhlS. L.2012Geographical variation in project cost performance: The Netherlands versus worldwideJournal of Transport Geography2432433110.1016/j.jtrangeo.2012.03.014Search in Google Scholar
Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & Wee, B. (2010). Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. European Journal of Transport and Infrastructure, 10(1), pp. 30–41.CantarelliC. C.FlyvbjergB.MolinE. J. E.WeeB.2010Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddednessEuropean Journal of Transport and Infrastructure1013041Search in Google Scholar
Cantarelli, C., van Wee, B., Molina, E. J. E., & Flyvbjerg, B. (2012). Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, 22, pp. 88–95.CantarelliC.van WeeB.MolinaE. J. E.FlyvbjergB.2012Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projectsTransport Policy22889510.1016/j.tranpol.2012.04.002Search in Google Scholar
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), pp. 279–295.FlyvbjergB.HolmM. S.BuhlS.2002Underestimating costs in public works projects: Error or lie?Journal of the American Planning Association68327929510.1080/01944360208976273Search in Google Scholar
Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), pp. 71–88.FlyvbjergB.Skamris HolmM. K.BuhlS. L.2003How common and how large are cost overruns in transport infrastructure projects?Transport Reviews231718810.1080/01441640309904Search in Google Scholar
Ghoddousi, P., Hosseini, M. R. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and Economic Development of Economy, 18(1), pp. 99–116.GhoddousiP.HosseiniM. R.2012A survey of the factors affecting the productivity of construction projects in IranTechnological and Economic Development of Economy1819911610.3846/20294913.2012.661203Search in Google Scholar
Gustafsson, A. (2016, 14 November). Notan för Nya Karolinska skulle räcka till två Slussen. Dagens Nyheter. Available at https://www.dn.se/sthlm/notan-for-nya-karolinska-skulle-racka-till-tva-slussen/GustafssonA.201614NovemberNotan för Nya Karolinska skulle räcka till två SlussenDagens NyheterAvailable at https://www.dn.se/sthlm/notan-for-nya-karolinska-skulle-racka-till-tva-slussen/Search in Google Scholar
Heravi, G., & Charkhakan, M. H. (2014). Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique. Journal of Management in Engineering, 30(6), pp. 04014028.HeraviG.CharkhakanM. H.2014Predicting and tracing change-formation scenarios in construction projects using the DEMATEL techniqueJournal of Management in Engineering3060401402810.1061/(ASCE)ME.1943-5479.0000229Search in Google Scholar
Idrottens Affärer. (2013, 25 December). Arenakostnaderna uppe i 8 miljarder. Available at www.idrottensaffarer.seIdrottens Affärer201325DecemberArenakostnaderna uppe i 8 miljarderAvailable at www.idrottensaffarer.seSearch in Google Scholar
Johnson, R. M., & Babu, R. I. I. (2020). Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402–411.JohnsonR. M.BabuR. I. I.2020Time and cost overruns in the UAE construction industry: A critical analysisInternational Journal of Construction Management20540241110.1080/15623599.2018.1484864Search in Google Scholar
Kamminga, P. (2015). Rethinking contract design: Why incorporating non-legal drivers of contractual behavior in contracts may lead to better results in complex defense systems procurement. Journal of Public Procurement, 15(2), pp. 208–235.KammingaP.2015Rethinking contract design: Why incorporating non-legal drivers of contractual behavior in contracts may lead to better results in complex defense systems procurementJournal of Public Procurement15220823510.1108/JOPP-15-02-2015-B004Search in Google Scholar
Keane, P., Sertyesilisik, B., & Ross, A. D. (2010). Variations and change orders on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2(2), pp. 89–96.KeaneP.SertyesilisikB.RossA. D.2010Variations and change orders on construction projectsJournal of Legal Affairs and Dispute Resolution in Engineering and Construction22899610.1061/(ASCE)LA.1943-4170.0000016Search in Google Scholar
Khanzadi, M., Nasirzadeh, F., & Dashti, M. S. (2018). Fuzzy cognitive map approach to analyze causes of change orders in construction projects. Journal of Construction Engineering and Management, 144(2), pp. 04017111.KhanzadiM.NasirzadehF.DashtiM. S.2018Fuzzy cognitive map approach to analyze causes of change orders in construction projectsJournal of Construction Engineering and Management14420401711110.1061/(ASCE)CO.1943-7862.0001430Search in Google Scholar
Lehtinen, J., Peltokorpi, A., & Artto, K. (2019). Megaprojects as organizational platforms and technology platforms for value creation. International Journal of Project Management, 37(1), pp. 43–58.LehtinenJ.PeltokorpiA.ArttoK.2019Megaprojects as organizational platforms and technology platforms for value creationInternational Journal of Project Management371435810.1016/j.ijproman.2018.10.001Search in Google Scholar
Littorin, J. (2015). Hallandsåstunneln öppnar – 18 år försenat. Dagens Nyheter. 8 December. Available at http://dn.seLittorinJ.2015Hallandsåstunneln öppnar – 18 år försenatDagens Nyheter8DecemberAvailable at http://dn.seSearch in Google Scholar
Liu, J., Zuo, J., Sun, Z., Zillante, G., & Chen, X. (2013). Sustainability in hydropower development—A case study. Renewable and Sustainable Energy Reviews, 19, pp. 230–237.LiuJ.ZuoJ.SunZ.ZillanteG.ChenX.2013Sustainability in hydropower development—A case studyRenewable and Sustainable Energy Reviews1923023710.1016/j.rser.2012.11.036Search in Google Scholar
Makovšek, D., Tominc, P., & Logožar, K. (2012). A cost performance analysis of transport infrastructure construction in Slovenia. Transportation, 39(1), pp. 197–214.MakovšekD.TomincP.LogožarK.2012A cost performance analysis of transport infrastructure construction in SloveniaTransportation39119721410.1007/s11116-011-9319-zSearch in Google Scholar
Odeck, J. (2004). Cost overruns in road construction—What are their sizes and determinants? Transport Policy, 11(1), pp. 43–53.OdeckJ.2004Cost overruns in road construction—What are their sizes and determinants?Transport Policy111435310.1016/S0967-070X(03)00017-9Search in Google Scholar
Park, Y., & Papadopoulou, T. (2012). Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195–216.ParkY.PapadopoulouT.2012Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project sizeBuilt Environment Project and Asset Management2219521610.1108/20441241211280873Search in Google Scholar
Pesämaa, O., Dahlin, P., & Öberg, C. (2018). Reduction of tension effects on partner evaluation. Marketing Intelligence & Planning, 36(4), pp. 425–439.PesämaaO.DahlinP.ÖbergC.2018Reduction of tension effects on partner evaluationMarketing Intelligence & Planning36442543910.1108/MIP-11-2017-0271Search in Google Scholar
Pesämaa, O., Larsson, J., & Eriksson, P. E. (2018). Role of performance feedback on process performance in construction projects: Client and contractor perspectives. Journal of Management in Engineering, 34(4), pp. 04018023.PesämaaO.LarssonJ.ErikssonP. E.2018Role of performance feedback on process performance in construction projects: Client and contractor perspectivesJournal of Management in Engineering3440401802310.1061/(ASCE)ME.1943-5479.0000619Search in Google Scholar
Qiu, Y., Chen, H., Sheng, Z., & Cheng, S. (2019). Governance of institutional complexity in megaproject organizations. International Journal of Project Management, 37(3), pp. 425–443.QiuY.ChenH.ShengZ.ChengS.2019Governance of institutional complexity in megaproject organizationsInternational Journal of Project Management37342544310.1016/j.ijproman.2019.02.001Search in Google Scholar
Rokkan, A. I., Heide, J. B., & Wathne, K. H. (2003). Specific investments in marketing relationships: Expropriation and bonding effects. Journal of Marketing Research, 40(2), pp. 210–224.RokkanA. I.HeideJ. B.WathneK. H.2003Specific investments in marketing relationships: Expropriation and bonding effectsJournal of Marketing Research40221022410.1509/jmkr.40.2.210.19223Search in Google Scholar
Ruoslahti, H. (2018). Co-creation of knowledge for innovation requires multi-stakeholder public relations. Public Relations and the Power of Creativity, Advances in Public Relations and Communication Management, 3, pp. 115–133.RuoslahtiH.2018Co-creation of knowledge for innovation requires multi-stakeholder public relationsPublic Relations and the Power of Creativity, Advances in Public Relations and Communication Management311513310.1108/S2398-391420180000003007Search in Google Scholar
Segelod, E. (2017). Project Cost Overrun: Causes, Consequences, and Investment Decisions. Cambridge University Press, Cambridge. doi: 10.1017/9781316779675.009SegelodE.2017Project Cost Overrun: Causes, Consequences, and Investment DecisionsCambridge University PressCambridge10.1017/9781316779675.009Open DOISearch in Google Scholar
Senescu, R. R., Aranda-Mena, G., & Haymaker, J. R. (2013). Relationships between project complexity and communication. Journal of Management in Engineering, 29(2), pp. 183–197.SenescuR. R.Aranda-MenaG.HaymakerJ. R.2013Relationships between project complexity and communicationJournal of Management in Engineering29218319710.1061/(ASCE)ME.1943-5479.0000121Search in Google Scholar
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), pp. 1471–1480.ShehuZ.EndutI. R.AkintoyeA.HoltG. D.2014Cost overrun in the Malaysian construction industry projects: A deeper insightInternational Journal of Project Management3281471148010.1016/j.ijproman.2014.04.004Search in Google Scholar
Swedbank. (2013). Ny Nationalarena i Solna AB: Swedbank Arena. Stockholm. Available at https://www.swedbank.se/idc/groups/public/@i/@sbg/@gs/@com/documents/article/fm_478566.pdfSwedbank2013Ny Nationalarena i Solna AB: Swedbank ArenaStockholmAvailable at https://www.swedbank.se/idc/groups/public/@i/@sbg/@gs/@com/documents/article/fm_478566.pdfSearch in Google Scholar
Themsen, T. N. (2019). The processes of public megaproject cost estimation: The inaccuracy of reference class forecasting. Financial Accountability & Management, 35(4), pp. 337–352.ThemsenT. N.2019The processes of public megaproject cost estimation: The inaccuracy of reference class forecastingFinancial Accountability & Management35433735210.1111/faam.12210Search in Google Scholar
Tsai, W. H., Lin, S. J., Liu, J. Y., Lin, W. R., & Lee, K. C. (2011). Incorporating life cycle assessments into building project decision-making: An energy consumption and CO2 emission perspective. Energy, 36(5), pp. 3022–3029.TsaiW. H.LinS. J.LiuJ. Y.LinW. R.LeeK. C.2011Incorporating life cycle assessments into building project decision-making: An energy consumption and CO2 emission perspectiveEnergy3653022302910.1016/j.energy.2011.02.046Search in Google Scholar
Wathne, K. H., & Heide, J. B. (2000). Opportunism in interfirm relationships: Forms, outcomes, and solutions. Journal of Marketing, 64(4), pp. 36–51. doi: 10.1509/jmkg.64.4.36.18070.WathneK. H.HeideJ. B.2000Opportunism in interfirm relationships: Forms, outcomes, and solutionsJournal of Marketing644365110.1509/jmkg.64.4.36.18070Open DOISearch in Google Scholar
Wu, C. H., Hsieh, T. Y., & Cheng, W. L. (2005). Statistical analysis of causes for design change in highway construction on Taiwan. International Journal of Project Management, 23(7), pp. 554–563.WuC. H.HsiehT. Y.ChengW. L.2005Statistical analysis of causes for design change in highway construction on TaiwanInternational Journal of Project Management23755456310.1016/j.ijproman.2004.07.010Search in Google Scholar
Zhang, J., Li, H., Olanipekun, A. O., & Bai, L. (2019). A successful delivery process of green buildings: The project owners’ view, motivation and commitment. Renewable Energy, 138, pp. 651–658.ZhangJ.LiH.OlanipekunA. O.BaiL.2019A successful delivery process of green buildings: The project owners’ view, motivation and commitmentRenewable Energy13865165810.1016/j.renene.2019.02.002Search in Google Scholar