Sustainable Infrastructure Research and Development Center (SIRDC), Department of Civil Engineering, Faculty of Engineering, Khon Kaen UniversityKhon Kaen, Thailand
This work is licensed under the Creative Commons Attribution 4.0 International License.
Abdaljader, A., & Günal, M. (2024). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 48, pp. 611-633. doi: 10.1007/s40996-023-01207-6AbdaljaderA.GünalM. (2024). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 48, pp. 611-633. 10.1007/s40996-023-01207-6Open DOISearch in Google Scholar
Abowitz, D. A., & Toole, T. M. (2010). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. Journal of Construction Engineering and Management, 136, pp. 108-116. doi: 10.1061/(ASCE)CO.1943-7862.0000026AbowitzD. A.TooleT. M. (2010). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. Journal of Construction Engineering and Management, 136, pp. 108-116. 10.1061/(ASCE)CO.1943-7862.0000026Open DOISearch in Google Scholar
Adedokun, O., & Egbelakin, T. (2024). Structural equation modelling of risk factors influencing the success of building projects. Journal of Facilities Management, 22, pp. 64-90. doi: 10.1108/JFM-01-2022-0002AdedokunO.EgbelakinT. (2024). Structural equation modelling of risk factors influencing the success of building projects. Journal of Facilities Management, 22, pp. 64-90. 10.1108/JFM-01-2022-0002Open DOISearch in Google Scholar
Ajayi, O., Thwala, W., Okanlawon, S., & Odunjo, O. (2015). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers. Industrial Management & Data Systems, 3, pp. 69-84.AjayiO.ThwalaW.OkanlawonS.OdunjoO. (2015). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers. Industrial Management &; Data Systems, 3, pp. 69-84.Search in Google Scholar
Al Shami, K. (2018). Investigating the use of building information modeling (BIM) in managing construction claims. PM World Journal, 7, pp. 1-17.Al ShamiK. (2018). Investigating the use of building information modeling (BIM) in managing construction claims. PM World Journal, 7, pp. 1-17.Search in Google Scholar
Amarasekara, W., Perera, B., & Rodrigo, M. (2018). Impact of differing site conditions on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10, p. 04518006. doi: 10.1061/(ASCE)LA.1943-4170.0000257AmarasekaraW.PereraB.RodrigoM. (2018). Impact of differing site conditions on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10, p. 04518006. 10.1061/(ASCE)LA.1943-4170.0000257Open DOISearch in Google Scholar
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24, pp. 349-357. doi: 10.1016/j. ijproman.2005.11.010AssafS. A.Al-HejjiS. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24, pp. 349-357. 10.1016/j.ijproman.2005.11.010Open DOISearch in Google Scholar
Bahamid, R., Doh, S., Al-Sharafi, M., & Rahimi, A. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In: IOP Conference Series: Materials Science and Engineering, 2020. IOP Publishing, 012007.BahamidR.DohS.Al-SharafiM.RahimiA. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In: IOP Conference Series: Materials Science and Engineering, 2020. IOP Publishing, 012007.Search in Google Scholar
Briscoe, J. (1999). The financing of hydropower, irrigation and water supply infrastructure in developing countries. International Journal of Water Resources Development, 15, pp. 459-491. doi: 10.1080/07900629948718BriscoeJ. (1999). The financing of hydropower, irrigation and water supply infrastructure in developing countries. International Journal of Water Resources Development, 15, pp. 459-491. 10.1080/07900629948718Open DOISearch in Google Scholar
Burke, R. (2013). Project Management: Planning and Control Techniques. John Wiley & Sons, Chichester, United Kingdom.BurkeR. (2013). Project Management: Planning and Control Techniques. John Wiley &; Sons, Chichester, United Kingdom.Search in Google Scholar
Burrows, G. L. (1953). Cochran. Sampling Techniques (Book Review). Social Forces, 32, p. 304. doi: 10.2307/2573260BurrowsG. L. (1953). Cochran. Sampling Techniques (Book Review). Social Forces, 32, p. 304. 10.2307/2573260Open DOISearch in Google Scholar
Cevikbas, M., Okudan, O., & IŞıK, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering. Construction and Architectural Management, 31, pp. 1-27. doi: 10.1108/ECAM-05-2022-0470CevikbasM.OkudanO.IŞıKZ. (2024). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering. Construction and Architectural Management, 31, pp. 1-27. 10.1108/ECAM-05-2022-0470Open DOISearch in Google Scholar
Chaitongrat, T., Liwthaisong, S., Aksorn, P., Kusonkhum, W., & Leungbootnak, N. (2021). Causal relationship model of problems in public sector procurement. Geomate Journal, 20, pp. 52-58. doi: 10.21660/2021.80.6266ChaitongratT.LiwthaisongS.AksornP.KusonkhumW.LeungbootnakN. (2021). Causal relationship model of problems in public sector procurement. Geomate Journal, 20, pp. 52-58. 10.21660/2021.80.6266Open DOISearch in Google Scholar
Ehrlinger, L., & Wöß, W. (2022). A survey of data quality measurement and monitoring tools. Frontiers in Big Data, 5, p. 850611. doi: 10.3389/fdata.2022.850611EhrlingerL.WößW. (2022). A survey of data quality measurement and monitoring tools. Frontiers in Big Data, 5, p. 850611. 10.3389/fdata.2022.850611Open DOISearch in Google Scholar
Ekung, S., Lashinde, A., & Adu, E. (2021). Critical risks to construction cost estimation. Journal of Engineering, Project & Production Management, 11, pp. 19-29. doi: 10.2478/jeppm-2021-0003EkungS.LashindeA.AduE. (2021). Critical risks to construction cost estimation. Journal of Engineering, Project &; Production Management, 11, pp. 19-29. 10.2478/jeppm-2021-0003Open DOISearch in Google Scholar
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21, pp. 321-326. doi: 10.1016/S0263-7863(02)00055-8FrimpongY.OluwoyeJ.CrawfordL. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21, pp. 321-326. 10.1016/S0263-7863(02)00055-8Open DOISearch in Google Scholar
Gajera, R. (2024). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards. Bulletin of Pure and Applied Sciences-Zoology, 43B(2S), pp. 1407-1418.GajeraR. (2024). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards. Bulletin of Pure and Applied Sciences-Zoology, 43B(2S), pp. 1407-1418.Search in Google Scholar
Ghorbani, A. (2023). A review of successful construction project managers’ competencies and leadership profile. Journal of Rehabilitation in Civil Engineering, 11, pp. 76-95. doi: 10.22075/JRCE.2022.24638.1560GhorbaniA. (2023). A review of successful construction project managers’ competencies and leadership profile. Journal of Rehabilitation in Civil Engineering, 11, pp. 76-95. 10.22075/JRCE.2022.24638.1560Open DOISearch in Google Scholar
Haupt, T. C., & Padayachee, K. (2016). Financial Management capacity and business failure of contractors. In: 10th Building ASOCSA Environment Conference, Porth Elizabeth, South Africa, July, 2016, pp. 213-226.HauptT. C.PadayacheeK. (2016). Financial Management capacity and business failure of contractors. In: 10th Building ASOCSA Environment Conference, Porth Elizabeth, South Africa, July, 2016, pp. 213-226.Search in Google Scholar
Hollmann, J. K. (2006). Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management. AACE International, Morgantown, West Virginia, USA.HollmannJ. K. (2006). Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management. AACE International, Morgantown, West Virginia, USA.Search in Google Scholar
Jaffar, N., Tharim, A. A., & Shuib, M. (2011). Factors of conflict in construction industry: A literature review. Procedia Engineering, 20, pp. 193-202. doi: 10.1016/j.proeng.2011.11.156JaffarN.TharimA. A.ShuibM. (2011). Factors of conflict in construction industry: A literature review. Procedia Engineering, 20, pp. 193-202. 10.1016/j.proeng.2011.11.156Open DOISearch in Google Scholar
Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27, pp. 522-531. doi: 10.1016/j.ijproman.2008.07.003KalibaC.MuyaM.MumbaK. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27, pp. 522-531. 10.1016/j.ijproman.2008.07.003Open DOISearch in Google Scholar
Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22, pp. 1141-1157. doi: 10.1080/15623599.2019.1683693KamalA.AbasM.KhanD.AzfarR. W. (2022). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22, pp. 1141-1157. 10.1080/15623599.2019.1683693Open DOISearch in Google Scholar
Kangpheng, S., Gunlong, S., & Kaewin, D. (2016). Mixed Methods: Paradigms of Research for the 21st Century. Apichat, Khon Kaen.KangphengS.GunlongS.KaewinD. (2016). Mixed Methods: Paradigms of Research for the 21st Century. Apichat, Khon Kaen.Search in Google Scholar
Kilag, O. K. T., Largo, J. M., Rabillas, A. R., Kilag, F. E., Angtud, M. K. A., Book, J. F. P., et al. (2024). Administrators’ conflict management and strategies. Journal of Higher Education and Academic Advancement, 1, pp. 22-31. doi: 10.61796/ejheaa.v1i2.98KilagO. K. T.LargoJ. M.RabillasA. R.KilagF. E.AngtudM. K. A.BookJ. F. P. (2024). Administrators’ conflict management and strategies. Journal of Higher Education and Academic Advancement, 1, pp. 22-31. 10.61796/ejheaa.v1i2.98Open DOISearch in Google Scholar
Koç, C. (2011). A study on construction costs per unit area of irrigation projects. Irrigation and Drainage Systems, 25, pp. 255-263. doi: 10.1007/s10795-011-9120-3KoçC. (2011). A study on construction costs per unit area of irrigation projects. Irrigation and Drainage Systems, 25, pp. 255-263. 10.1007/s10795-011-9120-3Open DOISearch in Google Scholar
Kusonkhum, W., Srinavin, K., & Chaitongrat, T. (2023). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project. Sustainability, 15, p. 12836. doi: 10.3390/su151712836KusonkhumW.SrinavinK.ChaitongratT. (2023). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project. Sustainability, 15, p. 12836. 10.3390/su151712836Open DOISearch in Google Scholar
Lester, A. (2007). Project Management, Planning and Control. Butterworth-Heinemann, Burlington.LesterA. (2007). Project Management, Planning and Control. Butterworth-Heinemann, Burlington.Search in Google Scholar
Lytvyn, N. (2017). Evaluation of the company’s personnel on the basis of construction models of competences. Regional Aspects of Productive Forces Development of Ukraine. Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11, Ternopil, Ukraine, tel. (0352) 47 58 72, West Ukrainian National University. pp. 125-131.LytvynN. (2017). Evaluation of the company’s personnel on the basis of construction models of competences. Regional Aspects of Productive Forces Development of Ukraine. Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11, Ternopil, Ukraine, tel. (0352) 47 58 72, West Ukrainian National University. pp. 125-131.Search in Google Scholar
McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., & Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. International Journal of Construction Management, 22, pp. 2469-2483. doi: 10.1080/15623599.2020.1797985McDermotE.AgdasD.Rodríguez DíazC. R.RoseT.ForcaelE. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. International Journal of Construction Management, 22, pp. 2469-2483. 10.1080/15623599.2020.1797985Open DOISearch in Google Scholar
Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20, pp. 67-73. doi: 10.1016/S0263-7863(00)00037-5OdehA. M.BattainehH. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20, pp. 67-73. 10.1016/S0263-7863(00)00037-5Open DOISearch in Google Scholar
Osei-Asibey, D., Ayarkwa, J., Adinyira, E., Acheampong, A., & Amoah, P. (2021). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site. Journal of Building Construction and Planning Research, 9, pp. 90-114. doi: 10.4236/jbcpr.2021.91008Osei-AsibeyD.AyarkwaJ.AdinyiraE.AcheampongA.AmoahP. (2021). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site. Journal of Building Construction and Planning Research, 9, pp. 90-114. 10.4236/jbcpr.2021.91008Open DOISearch in Google Scholar
Ostle, B. (1963). Statistics in Research, 2nd edn. TheTowa State University Press, Ames.OstleB. (1963). Statistics in Research, 2nd edn. TheTowa State University Press, Ames.Search in Google Scholar
Pallant, J. (2020). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS. Routledge, London, United Kingdom.PallantJ. (2020). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS. Routledge, London, United Kingdom.Search in Google Scholar
Peterzens-Nysten, T. (1998). Protection of discovered antiquities in Finland. Art Antiquity & Law, 3, Master of Science Thesis, Master of Science in Construction Management Institution: School of Science and Engineering, Reykjavík University. p. 355.Peterzens-NystenT. (1998). Protection of discovered antiquities in Finland. Art Antiquity &; Law, 3, Master of Science Thesis, Master of Science in Construction Management Institution: School of Science and Engineering, Reykjavík University. p. 355.Search in Google Scholar
Pétursson, B. K. (2015). Disputes and conflicts within construction contracts in the Icelandic construction industry.PéturssonB. K. (2015). Disputes and conflicts within construction contracts in the Icelandic construction industry.Search in Google Scholar
PMI, A. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 5th edn. Project Management Institute, Newtown Square, Pennsylvania, USA.PMIA. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 5th edn. Project Management Institute, Newtown Square, Pennsylvania, USA.Search in Google Scholar
Ramaswamy, B. (2013). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities. In: 2013 NGWA Summit – The National and International Conference on Groundwater, NGWA.RamaswamyB. (2013). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities. In: 2013 NGWA Summit – The National and International Conference on Groundwater, NGWA.Search in Google Scholar
San, L. Y. (2013). A study of causes and effects of conflict in construction industry. Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology, University Malaysia Pahang, Malaysia.SanL. Y. (2013). A study of causes and effects of conflict in construction industry. Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology, University Malaysia Pahang, Malaysia.Search in Google Scholar
Saram, D. D. D., & Ahmed, S. M. (2001). Construction coordination activities: What is important and what consumes time. Journal of Management in Engineering, 17, pp. 202-213. doi: 10.1061/(ASCE)0742-597X(2001)17:4(202)SaramD. D. D.AhmedS. M. (2001). Construction coordination activities: What is important and what consumes time. Journal of Management in Engineering, 17, pp. 202-213. 10.1061/(ASCE)0742-597X(2001)17:4(202)Open DOISearch in Google Scholar
Shibani, A., Hasan, D., Saaifan, J., Sabboubeh, H., Eltaip, M., Saidani, M., et al. (2024). Financial risk management in the construction projects. Journal of King Saud University-Engineering Sciences, 36, pp. 552-561. doi: 10.1016/j.jksues.2022.05.001ShibaniA.HasanD.SaaifanJ.SabboubehH.EltaipM.SaidaniM. (2024). Financial risk management in the construction projects. Journal of King Saud University-Engineering Sciences, 36, pp. 552-561. 10.1016/j.jksues.2022.05.001Open DOISearch in Google Scholar
Shubham, V. (2013). Causes of delay in project construction in developing countries. Indian Journal of Commerce & Management Studies ISSN, 2240, p. 310.ShubhamV. (2013). Causes of delay in project construction in developing countries. Indian Journal of Commerce &; Management Studies ISSN, 2240, p. 310.Search in Google Scholar
Srinavin, K., Kusonkhum, W., Chonpitakwong, B., Chaitongrat, T., Leungbootnak, N., & Charnwasununth, P. (2021). Readiness applying big data technology for construction management in Thai public sector. Journal of Advances in Information, 12, pp. 1-5. doi: 10.12720/jait.12.1.1-5.SrinavinK.KusonkhumW.ChonpitakwongB.ChaitongratT.LeungbootnakN.CharnwasununthP. (2021). Readiness applying big data technology for construction management in Thai public sector. Journal of Advances in Information, 12, pp. 1-5. 10.12720/jait.12.1.1-5.Open DOISearch in Google Scholar
Suárez, D., Díaz-Puente, J. M., & Bettoni, M. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. Land, 10, p. 613. doi: 10.3390/land10060613SuárezD.Díaz-PuenteJ. M.BettoniM. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. Land, 10, p. 613. 10.3390/land10060613Open DOISearch in Google Scholar
Tam, C. M., Zeng, S., & Deng, Z. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42, pp. 569-586. doi: 10.1016/j.ssci.2003.09.001TamC. M.ZengS.DengZ. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42, pp. 569-586. 10.1016/j.ssci.2003.09.001Open DOISearch in Google Scholar
Taylor, S., & Littleton, K. (2008). Art work or money: Conflicts in the construction of a creative identity. The Sociological Review, 56, pp. 275-292. doi: 10.1111/j.1467-954X.2008.00788.xTaylorS.LittletonK. (2008). Art work or money: Conflicts in the construction of a creative identity. The Sociological Review, 56, pp. 275-292. 10.1111/j.1467-954X.2008.00788.xOpen DOISearch in Google Scholar
The Government Procurement and Supplies Management Act (2017). The Comptroller General’s Department, Bangkok.The Government Procurement and Supplies Management Act (2017). The Comptroller General’s Department, Bangkok.Search in Google Scholar
Thorndike, R. L. (1936). Factor analysis of social and abstract intelligence. Journal of Educational Psychology, 27, p. 231. doi: 10.1037/h0059840ThorndikeR. L. (1936). Factor analysis of social and abstract intelligence. Journal of Educational Psychology, 27, p. 231. 10.1037/h0059840Open DOISearch in Google Scholar
Vorakitkasemsakul, S. (2011). Applied Statistics for Behavioral and Social Science Research. Aksonsin, Udon Thani.VorakitkasemsakulS. (2011). Applied Statistics for Behavioral and Social Science Research. Aksonsin, Udon Thani.Search in Google Scholar