Otwarty dostęp

The structural equation model of risk factors influencing government irrigation project

,  oraz   
12 sie 2025

Zacytuj
Pobierz okładkę

Abdaljader, A., & Günal, M. (2024). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 48, pp. 611-633. doi: 10.1007/s40996-023-01207-6 Abdaljader A. Günal M. ( 2024 ). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method . Iranian Journal of Science and Technology, Transactions of Civil Engineering , 48 , pp. 611 - 633 . 10.1007/s40996-023-01207-6 Open DOISearch in Google Scholar

Abowitz, D. A., & Toole, T. M. (2010). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. Journal of Construction Engineering and Management, 136, pp. 108-116. doi: 10.1061/(ASCE)CO.1943-7862.0000026 Abowitz D. A. Toole T. M. ( 2010 ). Mixed method research: Fundamental issues of design, validity, and reliability in construction research . Journal of Construction Engineering and Management , 136 , pp. 108 - 116 . 10.1061/(ASCE)CO.1943-7862.0000026 Open DOISearch in Google Scholar

Adedokun, O., & Egbelakin, T. (2024). Structural equation modelling of risk factors influencing the success of building projects. Journal of Facilities Management, 22, pp. 64-90. doi: 10.1108/JFM-01-2022-0002 Adedokun O. Egbelakin T. ( 2024 ). Structural equation modelling of risk factors influencing the success of building projects . Journal of Facilities Management , 22 , pp. 64 - 90 . 10.1108/JFM-01-2022-0002 Open DOISearch in Google Scholar

Ajayi, O., Thwala, W., Okanlawon, S., & Odunjo, O. (2015). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers. Industrial Management & Data Systems, 3, pp. 69-84. Ajayi O. Thwala W. Okanlawon S. Odunjo O. ( 2015 ). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers . Industrial Management &; Data Systems , 3 , pp. 69 - 84 . Search in Google Scholar

Al Shami, K. (2018). Investigating the use of building information modeling (BIM) in managing construction claims. PM World Journal, 7, pp. 1-17. Al Shami K. ( 2018 ). Investigating the use of building information modeling (BIM) in managing construction claims . PM World Journal , 7 , pp. 1 - 17 . Search in Google Scholar

Amarasekara, W., Perera, B., & Rodrigo, M. (2018). Impact of differing site conditions on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10, p. 04518006. doi: 10.1061/(ASCE)LA.1943-4170.0000257 Amarasekara W. Perera B. Rodrigo M. ( 2018 ). Impact of differing site conditions on construction projects . Journal of Legal Affairs and Dispute Resolution in Engineering and Construction , 10 , p. 04518006 . 10.1061/(ASCE)LA.1943-4170.0000257 Open DOISearch in Google Scholar

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24, pp. 349-357. doi: 10.1016/j. ijproman.2005.11.010 Assaf S. A. Al-Hejji S. ( 2006 ). Causes of delay in large construction projects . International Journal of Project Management , 24 , pp. 349 - 357 . 10.1016/j.ijproman.2005.11.010 Open DOISearch in Google Scholar

Bahamid, R., Doh, S., Al-Sharafi, M., & Rahimi, A. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In: IOP Conference Series: Materials Science and Engineering, 2020. IOP Publishing, 012007. Bahamid R. Doh S. Al-Sharafi M. Rahimi A. ( 2020 ). Risk factors influencing the construction projects in Yemen from expert’s perspective . In: IOP Conference Series: Materials Science and Engineering , 2020 . IOP Publishing , 012007 . Search in Google Scholar

Briscoe, J. (1999). The financing of hydropower, irrigation and water supply infrastructure in developing countries. International Journal of Water Resources Development, 15, pp. 459-491. doi: 10.1080/07900629948718 Briscoe J. ( 1999 ). The financing of hydropower, irrigation and water supply infrastructure in developing countries . International Journal of Water Resources Development , 15 , pp. 459 - 491 . 10.1080/07900629948718 Open DOISearch in Google Scholar

Burke, R. (2013). Project Management: Planning and Control Techniques. John Wiley & Sons, Chichester, United Kingdom. Burke R. ( 2013 ). Project Management: Planning and Control Techniques . John Wiley &; Sons , Chichester, United Kingdom . Search in Google Scholar

Burrows, G. L. (1953). Cochran. Sampling Techniques (Book Review). Social Forces, 32, p. 304. doi: 10.2307/2573260 Burrows G. L. ( 1953 ). Cochran. Sampling Techniques (Book Review) . Social Forces , 32 , p. 304 . 10.2307/2573260 Open DOISearch in Google Scholar

Cevikbas, M., Okudan, O., & IŞıK, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering. Construction and Architectural Management, 31, pp. 1-27. doi: 10.1108/ECAM-05-2022-0470 Cevikbas M. Okudan O. IŞıK Z. ( 2024 ). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach . Engineering. Construction and Architectural Management , 31 , pp. 1 - 27 . 10.1108/ECAM-05-2022-0470 Open DOISearch in Google Scholar

Chaitongrat, T., Liwthaisong, S., Aksorn, P., Kusonkhum, W., & Leungbootnak, N. (2021). Causal relationship model of problems in public sector procurement. Geomate Journal, 20, pp. 52-58. doi: 10.21660/2021.80.6266 Chaitongrat T. Liwthaisong S. Aksorn P. Kusonkhum W. Leungbootnak N. ( 2021 ). Causal relationship model of problems in public sector procurement . Geomate Journal , 20 , pp. 52 - 58 . 10.21660/2021.80.6266 Open DOISearch in Google Scholar

Ehrlinger, L., & Wöß, W. (2022). A survey of data quality measurement and monitoring tools. Frontiers in Big Data, 5, p. 850611. doi: 10.3389/fdata.2022.850611 Ehrlinger L. Wöß W. ( 2022 ). A survey of data quality measurement and monitoring tools . Frontiers in Big Data , 5 , p. 850611 . 10.3389/fdata.2022.850611 Open DOISearch in Google Scholar

Ekung, S., Lashinde, A., & Adu, E. (2021). Critical risks to construction cost estimation. Journal of Engineering, Project & Production Management, 11, pp. 19-29. doi: 10.2478/jeppm-2021-0003 Ekung S. Lashinde A. Adu E. ( 2021 ). Critical risks to construction cost estimation . Journal of Engineering, Project &; Production Management , 11 , pp. 19 - 29 . 10.2478/jeppm-2021-0003 Open DOISearch in Google Scholar

Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21, pp. 321-326. doi: 10.1016/S0263-7863(02)00055-8 Frimpong Y. Oluwoye J. Crawford L. ( 2003 ). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study . International Journal of Project Management , 21 , pp. 321 - 326 . 10.1016/S0263-7863(02)00055-8 Open DOISearch in Google Scholar

Gajera, R. (2024). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards. Bulletin of Pure and Applied Sciences-Zoology, 43B(2S), pp. 1407-1418. Gajera R. ( 2024 ). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards . Bulletin of Pure and Applied Sciences-Zoology , 43B ( 2S ), pp. 1407 - 1418 . Search in Google Scholar

Ghorbani, A. (2023). A review of successful construction project managers’ competencies and leadership profile. Journal of Rehabilitation in Civil Engineering, 11, pp. 76-95. doi: 10.22075/JRCE.2022.24638.1560 Ghorbani A. ( 2023 ). A review of successful construction project managers’ competencies and leadership profile . Journal of Rehabilitation in Civil Engineering , 11 , pp. 76 - 95 . 10.22075/JRCE.2022.24638.1560 Open DOISearch in Google Scholar

Haupt, T. C., & Padayachee, K. (2016). Financial Management capacity and business failure of contractors. In: 10th Building ASOCSA Environment Conference, Porth Elizabeth, South Africa, July, 2016, pp. 213-226. Haupt T. C. Padayachee K. ( 2016 ). Financial Management capacity and business failure of contractors . In: 10th Building ASOCSA Environment Conference , Porth Elizabeth , South Africa , July , 2016 , pp. 213 - 226 . Search in Google Scholar

Hollmann, J. K. (2006). Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management. AACE International, Morgantown, West Virginia, USA. Hollmann J. K. ( 2006 ). Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management . AACE International , Morgantown, West Virginia, USA . Search in Google Scholar

Jaffar, N., Tharim, A. A., & Shuib, M. (2011). Factors of conflict in construction industry: A literature review. Procedia Engineering, 20, pp. 193-202. doi: 10.1016/j.proeng.2011.11.156 Jaffar N. Tharim A. A. Shuib M. ( 2011 ). Factors of conflict in construction industry: A literature review . Procedia Engineering , 20 , pp. 193 - 202 . 10.1016/j.proeng.2011.11.156 Open DOISearch in Google Scholar

Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27, pp. 522-531. doi: 10.1016/j.ijproman.2008.07.003 Kaliba C. Muya M. Mumba K. ( 2009 ). Cost escalation and schedule delays in road construction projects in Zambia . International Journal of Project Management , 27 , pp. 522 - 531 . 10.1016/j.ijproman.2008.07.003 Open DOISearch in Google Scholar

Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22, pp. 1141-1157. doi: 10.1080/15623599.2019.1683693 Kamal A. Abas M. Khan D. Azfar R. W. ( 2022 ). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants . International Journal of Construction Management , 22 , pp. 1141 - 1157 . 10.1080/15623599.2019.1683693 Open DOISearch in Google Scholar

Kangpheng, S., Gunlong, S., & Kaewin, D. (2016). Mixed Methods: Paradigms of Research for the 21st Century. Apichat, Khon Kaen. Kangpheng S. Gunlong S. Kaewin D. ( 2016 ). Mixed Methods: Paradigms of Research for the 21st Century . Apichat , Khon Kaen . Search in Google Scholar

Kilag, O. K. T., Largo, J. M., Rabillas, A. R., Kilag, F. E., Angtud, M. K. A., Book, J. F. P., et al. (2024). Administrators’ conflict management and strategies. Journal of Higher Education and Academic Advancement, 1, pp. 22-31. doi: 10.61796/ejheaa.v1i2.98 Kilag O. K. T. Largo J. M. Rabillas A. R. Kilag F. E. Angtud M. K. A. Book J. F. P. ( 2024 ). Administrators’ conflict management and strategies . Journal of Higher Education and Academic Advancement , 1 , pp. 22 - 31 . 10.61796/ejheaa.v1i2.98 Open DOISearch in Google Scholar

Koç, C. (2011). A study on construction costs per unit area of irrigation projects. Irrigation and Drainage Systems, 25, pp. 255-263. doi: 10.1007/s10795-011-9120-3 Koç C. ( 2011 ). A study on construction costs per unit area of irrigation projects . Irrigation and Drainage Systems , 25 , pp. 255 - 263 . 10.1007/s10795-011-9120-3 Open DOISearch in Google Scholar

Kusonkhum, W., Srinavin, K., & Chaitongrat, T. (2023). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project. Sustainability, 15, p. 12836. doi: 10.3390/su151712836 Kusonkhum W. Srinavin K. Chaitongrat T. ( 2023 ). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project . Sustainability , 15 , p. 12836 . 10.3390/su151712836 Open DOISearch in Google Scholar

Lester, A. (2007). Project Management, Planning and Control. Butterworth-Heinemann, Burlington. Lester A. ( 2007 ). Project Management, Planning and Control . Butterworth-Heinemann , Burlington . Search in Google Scholar

Lytvyn, N. (2017). Evaluation of the company’s personnel on the basis of construction models of competences. Regional Aspects of Productive Forces Development of Ukraine. Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11, Ternopil, Ukraine, tel. (0352) 47 58 72, West Ukrainian National University. pp. 125-131. Lytvyn N. ( 2017 ). Evaluation of the company’s personnel on the basis of construction models of competences . Regional Aspects of Productive Forces Development of Ukraine . Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11 , Ternopil, Ukraine, tel . (0352) 47 58 72, West Ukrainian National University . pp. 125 - 131 . Search in Google Scholar

McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., & Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. International Journal of Construction Management, 22, pp. 2469-2483. doi: 10.1080/15623599.2020.1797985 McDermot E. Agdas D. Rodríguez Díaz C. R. Rose T. Forcael E. ( 2022 ). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study . International Journal of Construction Management , 22 , pp. 2469 - 2483 . 10.1080/15623599.2020.1797985 Open DOISearch in Google Scholar

Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20, pp. 67-73. doi: 10.1016/S0263-7863(00)00037-5 Odeh A. M. Battaineh H. T. ( 2002 ). Causes of construction delay: Traditional contracts . International Journal of Project Management , 20 , pp. 67 - 73 . 10.1016/S0263-7863(00)00037-5 Open DOISearch in Google Scholar

Osei-Asibey, D., Ayarkwa, J., Adinyira, E., Acheampong, A., & Amoah, P. (2021). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site. Journal of Building Construction and Planning Research, 9, pp. 90-114. doi: 10.4236/jbcpr.2021.91008 Osei-Asibey D. Ayarkwa J. Adinyira E. Acheampong A. Amoah P. ( 2021 ). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site . Journal of Building Construction and Planning Research , 9 , pp. 90 - 114 . 10.4236/jbcpr.2021.91008 Open DOISearch in Google Scholar

Ostle, B. (1963). Statistics in Research, 2nd edn. TheTowa State University Press, Ames. Ostle B. ( 1963 ). Statistics in Research , 2nd edn. TheTowa State University Press , Ames . Search in Google Scholar

Pallant, J. (2020). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS. Routledge, London, United Kingdom. Pallant J. ( 2020 ). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS . Routledge , London, United Kingdom . Search in Google Scholar

Peterzens-Nysten, T. (1998). Protection of discovered antiquities in Finland. Art Antiquity & Law, 3, Master of Science Thesis, Master of Science in Construction Management Institution: School of Science and Engineering, Reykjavík University. p. 355. Peterzens-Nysten T. ( 1998 ). Protection of discovered antiquities in Finland. Art Antiquity &; Law , 3, Master of Science Thesis, Master of Science in Construction Management Institution : School of Science and Engineering, Reykjavík University . p. 355 . Search in Google Scholar

Pétursson, B. K. (2015). Disputes and conflicts within construction contracts in the Icelandic construction industry. Pétursson B. K. ( 2015 ). Disputes and conflicts within construction contracts in the Icelandic construction industry . Search in Google Scholar

PMI, A. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 5th edn. Project Management Institute, Newtown Square, Pennsylvania, USA. PMI A. ( 2013 ). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) , 5th edn. Project Management Institute, Newtown Square , Pennsylvania, USA . Search in Google Scholar

Ramaswamy, B. (2013). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities. In: 2013 NGWA Summit – The National and International Conference on Groundwater, NGWA. Ramaswamy B. ( 2013 ). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities . In: 2013 NGWA Summit – The National and International Conference on Groundwater , NGWA . Search in Google Scholar

San, L. Y. (2013). A study of causes and effects of conflict in construction industry. Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology, University Malaysia Pahang, Malaysia. San L. Y. ( 2013 ). A study of causes and effects of conflict in construction industry . Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology , University Malaysia Pahang , Malaysia . Search in Google Scholar

Saram, D. D. D., & Ahmed, S. M. (2001). Construction coordination activities: What is important and what consumes time. Journal of Management in Engineering, 17, pp. 202-213. doi: 10.1061/(ASCE)0742-597X(2001)17:4(202) Saram D. D. D. Ahmed S. M. ( 2001 ). Construction coordination activities: What is important and what consumes time . Journal of Management in Engineering , 17 , pp. 202 - 213 . 10.1061/(ASCE)0742-597X(2001)17:4(202) Open DOISearch in Google Scholar

Shibani, A., Hasan, D., Saaifan, J., Sabboubeh, H., Eltaip, M., Saidani, M., et al. (2024). Financial risk management in the construction projects. Journal of King Saud University-Engineering Sciences, 36, pp. 552-561. doi: 10.1016/j.jksues.2022.05.001 Shibani A. Hasan D. Saaifan J. Sabboubeh H. Eltaip M. Saidani M. ( 2024 ). Financial risk management in the construction projects . Journal of King Saud University-Engineering Sciences , 36 , pp. 552 - 561 . 10.1016/j.jksues.2022.05.001 Open DOISearch in Google Scholar

Shubham, V. (2013). Causes of delay in project construction in developing countries. Indian Journal of Commerce & Management Studies ISSN, 2240, p. 310. Shubham V. ( 2013 ). Causes of delay in project construction in developing countries . Indian Journal of Commerce &; Management Studies ISSN , 2240 , p. 310 . Search in Google Scholar

Srinavin, K., Kusonkhum, W., Chonpitakwong, B., Chaitongrat, T., Leungbootnak, N., & Charnwasununth, P. (2021). Readiness applying big data technology for construction management in Thai public sector. Journal of Advances in Information, 12, pp. 1-5. doi: 10.12720/jait.12.1.1-5. Srinavin K. Kusonkhum W. Chonpitakwong B. Chaitongrat T. Leungbootnak N. Charnwasununth P. ( 2021 ). Readiness applying big data technology for construction management in Thai public sector . Journal of Advances in Information , 12 , pp. 1 - 5 . 10.12720/jait.12.1.1-5 . Open DOISearch in Google Scholar

Suárez, D., Díaz-Puente, J. M., & Bettoni, M. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. Land, 10, p. 613. doi: 10.3390/land10060613 Suárez D. Díaz-Puente J. M. Bettoni M. ( 2021 ). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain . Land , 10 , p. 613 . 10.3390/land10060613 Open DOISearch in Google Scholar

Tam, C. M., Zeng, S., & Deng, Z. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42, pp. 569-586. doi: 10.1016/j.ssci.2003.09.001 Tam C. M. Zeng S. Deng Z. ( 2004 ). Identifying elements of poor construction safety management in China . Safety Science , 42 , pp. 569 - 586 . 10.1016/j.ssci.2003.09.001 Open DOISearch in Google Scholar

Taylor, S., & Littleton, K. (2008). Art work or money: Conflicts in the construction of a creative identity. The Sociological Review, 56, pp. 275-292. doi: 10.1111/j.1467-954X.2008.00788.x Taylor S. Littleton K. ( 2008 ). Art work or money: Conflicts in the construction of a creative identity . The Sociological Review , 56 , pp. 275 - 292 . 10.1111/j.1467-954X.2008.00788.x Open DOISearch in Google Scholar

The Government Procurement and Supplies Management Act (2017). The Comptroller General’s Department, Bangkok. The Government Procurement and Supplies Management Act ( 2017 ). The Comptroller General’s Department , Bangkok . Search in Google Scholar

Thorndike, R. L. (1936). Factor analysis of social and abstract intelligence. Journal of Educational Psychology, 27, p. 231. doi: 10.1037/h0059840 Thorndike R. L. ( 1936 ). Factor analysis of social and abstract intelligence . Journal of Educational Psychology , 27 , p. 231 . 10.1037/h0059840 Open DOISearch in Google Scholar

Vorakitkasemsakul, S. (2011). Applied Statistics for Behavioral and Social Science Research. Aksonsin, Udon Thani. Vorakitkasemsakul S. ( 2011 ). Applied Statistics for Behavioral and Social Science Research . Aksonsin, Udon Thani . Search in Google Scholar

Język:
Angielski
Częstotliwość wydawania:
1 razy w roku
Dziedziny czasopisma:
Inżynieria, Wstępy i przeglądy, Inżynieria, inne