Open Access

Failure Case of Earned Value Method (EVM): The “Absurd” of the Use of Management & Contingency Reserves Budgeting


Cite

American Agricultural Economics Association. (2000). Commodity cost and returns estimation handbook. A.A.E.A. Publishing. Search in Google Scholar

American National Standards Institute / Electronic Industries Alliance. (1998). EIA standard-earned value management systems/EIA-748. E.I.A. Publishing. Search in Google Scholar

Bank of England/Prudential Regulation Authority & Financial Conduct Authority. (2014). Strengthening the alignment of risk and reward: New remuneration rules. Consultation paper 15/14, PRA Publishing. Search in Google Scholar

Blank, L. & Tarquin, A. (2005). Engineering economy (6th ed.). McGraw-Hill. Search in Google Scholar

Bembers, I. et al. (2003). Over target baseline and over target schedule handbook, OUSD AT&L (PARCA). https://www.humphreys-assoc.com/evms/evms-documents/dod/OTB-OTS-Guide-121205.pdf Search in Google Scholar

Carr, R. I. (1993). Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), 245–265. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(245)10.1061/(ASCE)0733-9364(1993)119:2(245) Search in Google Scholar

Chong, Y. Y. & Brown, E. M. (2000). Managing project risk. Pearson Professional Education. Search in Google Scholar

Christensen, D. S. & Templin, C. (2000). An analysis of management reserve budget on defense acquisition contracts. Acquisition Review Quarterly, 7, 191–208. https://www.dau.edu/library/arj/ARJ/arq2000/christ.pdf Search in Google Scholar

Committee of Sponsoring Organizations of the Treadway Commission (COSO) & World Business Council for Sustainable Development. (2018). Enterprise risk management, COSO & WBCSD Publishing. Search in Google Scholar

Crundwell, F. K. (2008). Finance for engineers. Evaluation and funding of capital projects. Springer Verlag London Limited. Search in Google Scholar

Delle Chiaie, S., Ferrara, L, & Giannone D. (2017). Common factors of commodity prices., ECB Working Paper, 2112. https://doi.org/10.2139/ssrn.307288210.2139/ssrn.3072882 Search in Google Scholar

De Marco, A. D., Rosso, M., & Narbaev, T. (2016). Nonlinear cost estimates at completion adjusted with risk contingency. The Journal of Modern Project Management, 4, 24–33. https://doi.org/10.19255/JMPM01103 Search in Google Scholar

Dobb, M. (1937). Political economy and capitalism– Some essays in economic tradition (1st ed.). George Routledge & Sons Ltd. Search in Google Scholar

Dűa, R. M. (2019). Earned value for IT projects. Victoria University and Raphael M. Düa publishing. Search in Google Scholar

Dumenil, G. & Lévy, D. (1993). The economics of the profit rate: Competition, crises and historical tendencies in capitalism. Edward Elgar Publishing. Search in Google Scholar

European Commission-Directorate General for Regional Policy and Cohesion (DG XVI). (1998). Understanding and Monitoring the Cost-Determining Factors of Infrastructure Projects. European Commission publishing. Search in Google Scholar

European Commission-Directorate General for Regional and Urban Policy (DG XVI). (2015). Public Procurement-Guidance for Practitioners. European Commission publishing. Search in Google Scholar

Fadel, S. M. & Al-Ajmi, J. (2017). Risk management of Islamic banks: A search for empirical evidences. Corporate Ownership & Control Journal, 14(2), 8–16. https://doi.org/10.22495/cocv14i2art110.22495/cocv14i2art1 Search in Google Scholar

Georgiou, A. K. et al. (2015). Simulationtechniques in management science (Teknikes Prosomiosis sti Diikitiki Epistimi). Kallipos. Search in Google Scholar

Government Accountability Office. (2009). Cost estimating and assessment guide. GAO 09-3SP. Search in Google Scholar

Government Accountability Office. (2015). Schedule assessment guide– Best practices for project schedules. GAO 16-89G. Search in Google Scholar

Gruneberg, S. L. & Ive, G. J. (2000). The economics of the modern construction firm. Mackmillan Press.10.1057/9780230510432 Search in Google Scholar

Guidance Note 1.3. (2009). Budget development, v. 1.0, Department of Finance publishing. Search in Google Scholar

Guidance Note 1.5.1. (2016). Public works contracts: Managing the pre-contract phase.v. 1.0, Department of Public Expenditure and Reform publishing. Search in Google Scholar

Hillebrandt, P. M. (2000). Economic theory and the construction industry (3rd ed.). Mackmillan Press. Search in Google Scholar

Humphreys, K. K. (2005). Project and cost engineers’ handbook (4th ed.). Marcel Dekker publishing. Search in Google Scholar

Infanti, M. (2011). How to estimate and use management reserve in an earned value management system (EVMS). 2011 ISPA/SCEA Joint Annual Conference and Training Workshop. http://www.iceaaonline.com/ready/wp-content/uploads/2017/09/MT08A_Paper_ManagementReserveinEVMSystem_Infanti.pdf Search in Google Scholar

International Atomic Energy Agency. (2005). Financial aspects of decommissioning (IAEATECDOC-1476). https://www-pub.iaea.org/MTCD/publications/PDF/te_1476_web.pdf Search in Google Scholar

Ive, G. J., & Gruneberg, S. L. (2000). The economics of the modern construction sector. Mackmillan Press publishing.10.1057/9780230510913 Search in Google Scholar

Kwak, Y. H. & Anbari, F. T. (2012). History, practices, and future of earned value management in government: Perspectives from NASA. Project Management Journal, 43(1), 77–90. https://doi.org/10.1002/pmj.2027210.1002/pmj.20272 Search in Google Scholar

Logistics Management Institute. (2000). Better development cost estimating through modeling and simulation (report No. LMI-PA903T1). https://apps.dtic.mil/sti/pdfs/ADA378782.pdf Search in Google Scholar

Melamed, D. & Loop, R. (2014). Cost schedule reserves in a project baseline, an owners and contractor’s perspective. AACE International Technical Paper. Search in Google Scholar

Menger, C. (2007). Principles of economics. Ludwig von Mises Institute. http://www.hacer.org/pdf/Menger04.pdf Search in Google Scholar

Metallinos, P. (2011). Public works management – costing policies and legislative study (DiahirisiDimosion Ergon – politikescostologisis kai meletinomotesias), Tziola editions. Search in Google Scholar

Metallinos, P. (2013). Expanded oligopolization of the Greek public works market through the framework of law. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 5(2), 86–89. https://doi.org/10.1061/(ASCE)LA.1943-4170.000010510.1061/(ASCE)LA.1943-4170.0000105 Search in Google Scholar

Metallinos, P. (2014). Measurement of the cost of a public works project: The case of Greece. European Journal of Law and Economics, 37(3), 517–527. https://doi.org/10.1007/s10657-012-9353-010.1007/s10657-012-9353-0 Search in Google Scholar

Metallinos, P. (2018). Interpretation of mathematic model of measurement of a public work’s cost after contractor’s election and before the start of contractual activities. Baltic Journal of Real Estate Economics and Construction Management, 6(1), 131–143. https://doi.org/10.2478/bjreecm-2018-001010.2478/bjreecm-2018-0010 Search in Google Scholar

Metallinos, P. (2019). Interpretation of the concept of “discount” in technical works tenders. HOLISTICA– Journal of Business and Public Administration, 10(1), 16–23. https://doi.org/10.2478/hjbpa-2019-000210.2478/hjbpa-2019-0002 Search in Google Scholar

National Aeronautics and Space Administration. (2010). NASA Schedule Management Handbook. NASA publishing. Search in Google Scholar

National Aeronautics and Space Administration. (2015). NASA Cost Estimating Handbook (version 4.0). NASA publishing. Search in Google Scholar

National Aeronautics and Space Administration. (2018). NASA Work Breakdown Structure (WBS) Handbook. NASA publishing. Search in Google Scholar

National Aeronautics and Space Administration. (2018a). Earned Value Management (EVM) Implementation Handbook (SP-2018-599). NASA publishing. Search in Google Scholar

NDIA IPMD. (2015). Earned Value Management Systems Application Guide. NDIA IPMD publishing. Search in Google Scholar

NDIA IPMD. (2016). Earned Value Management Systems Guideline Scalability Guide. NDIA IPMD publishing. Search in Google Scholar

NDIA IPMD. (2018). Earned Value Management Systems EIA-748-D Intent Guide. NDIA IPMD publishing. Search in Google Scholar

Nicholson, W. & Snyder, C. (2008). Basic principles and extensions (10th ed.). Thomson South-Western publishing. Search in Google Scholar

O.E.C.D.-N.E.A. (2013). Cost Control Guide for Decommissioning of Nuclear Installations. O.E.C.D. publishing. Search in Google Scholar

O.E.C.D. (2014). Regulatory Compliance Cost Assessment Guidance. O.E.C.D. publishing. Search in Google Scholar

O.E.C.D.-N.E.A. (2015). The Practice of Cost Estimation for Decommissioning of Nuclear Facilities. O.E.C.D. publishing. Search in Google Scholar

O.E.C.D.-N.E.A. & I.A.E.A. (2017). Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities. O.E.C.D. publishing. Search in Google Scholar

Project Management Institute. (2011). Practice Standard for Earned Value Management (2nd ed.). PMI publishing. Search in Google Scholar

Samuelson, W. F. & Marks, S. G. (2012). Managerialeconomics (7th ed.). Wiley & Sons. http://www.mim.ac.mw/books/Samuelson%20Managerial%20Economics%207e.pdf Search in Google Scholar

Thomas, R. (2001). Construction contract claims (2nd ed.). Palgrave publishing. Search in Google Scholar

U.S. Department of Defense. (2005). Construction Cost Estimates (UFC 3-700-02A/01-03-2005). Search in Google Scholar

U.S. Department of Defense. (2015). Earned Value Management System Interpretation Guide (OUSD AT&L (PARCA)/02-18-2015). Search in Google Scholar

U.S. Department of Energy. (1997). Cost Estimating Guide (DOE G 430.1-1/03-28-97). Search in Google Scholar

U.S. Department of Energy. (2015a). Cost Estimating Guide (DOE G 413.3-21/10-22-2015). Search in Google Scholar

U.S. Department of Energy. (2015b). Change Control Management Guide-DOE G 413.3-20/10-22-2015, U.S.A. Search in Google Scholar

U.S. Department of Energy. (2016). Earned Value Management Systems Interpretation Handbook (EVMSIH (2.0)). Search in Google Scholar

U.S. Department of Justice – Office of the Chief Information Officer. (2010). Information Technology (IT) Investment Baseline Management Guide. Search in Google Scholar

Venkataraman, R. R. & Pinto, J. K. (2008). Cost and value management in projects. Wiley & Sons. http://160592857366.free.fr/joe/ebooks/tech/Wiley%20Cost%20and%20Value%20Management.pdf10.1002/9780470261033 Search in Google Scholar

Wouters, M. et al. (2012). Cost management. Strategies for business decisions. McGraw-Hill. Search in Google Scholar