[
American Agricultural Economics Association. (2000). Commodity cost and returns estimation handbook. A.A.E.A. Publishing.
]Search in Google Scholar
[
American National Standards Institute / Electronic Industries Alliance. (1998). EIA standard-earned value management systems/EIA-748. E.I.A. Publishing.
]Search in Google Scholar
[
Bank of England/Prudential Regulation Authority & Financial Conduct Authority. (2014). Strengthening the alignment of risk and reward: New remuneration rules. Consultation paper 15/14, PRA Publishing.
]Search in Google Scholar
[
Blank, L. & Tarquin, A. (2005). Engineering economy (6th ed.). McGraw-Hill.
]Search in Google Scholar
[
Bembers, I. et al. (2003). Over target baseline and over target schedule handbook, OUSD AT&L (PARCA). https://www.humphreys-assoc.com/evms/evms-documents/dod/OTB-OTS-Guide-121205.pdf
]Search in Google Scholar
[
Carr, R. I. (1993). Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), 245–265. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(245)10.1061/(ASCE)0733-9364(1993)119:2(245)
]Search in Google Scholar
[
Chong, Y. Y. & Brown, E. M. (2000). Managing project risk. Pearson Professional Education.
]Search in Google Scholar
[
Christensen, D. S. & Templin, C. (2000). An analysis of management reserve budget on defense acquisition contracts. Acquisition Review Quarterly, 7, 191–208. https://www.dau.edu/library/arj/ARJ/arq2000/christ.pdf
]Search in Google Scholar
[
Committee of Sponsoring Organizations of the Treadway Commission (COSO) & World Business Council for Sustainable Development. (2018). Enterprise risk management, COSO & WBCSD Publishing.
]Search in Google Scholar
[
Crundwell, F. K. (2008). Finance for engineers. Evaluation and funding of capital projects. Springer Verlag London Limited.
]Search in Google Scholar
[
Delle Chiaie, S., Ferrara, L, & Giannone D. (2017). Common factors of commodity prices., ECB Working Paper, 2112. https://doi.org/10.2139/ssrn.307288210.2139/ssrn.3072882
]Search in Google Scholar
[
De Marco, A. D., Rosso, M., & Narbaev, T. (2016). Nonlinear cost estimates at completion adjusted with risk contingency. The Journal of Modern Project Management, 4, 24–33. https://doi.org/10.19255/JMPM01103
]Search in Google Scholar
[
Dobb, M. (1937). Political economy and capitalism– Some essays in economic tradition (1st ed.). George Routledge & Sons Ltd.
]Search in Google Scholar
[
Dűa, R. M. (2019). Earned value for IT projects. Victoria University and Raphael M. Düa publishing.
]Search in Google Scholar
[
Dumenil, G. & Lévy, D. (1993). The economics of the profit rate: Competition, crises and historical tendencies in capitalism. Edward Elgar Publishing.
]Search in Google Scholar
[
European Commission-Directorate General for Regional Policy and Cohesion (DG XVI). (1998). Understanding and Monitoring the Cost-Determining Factors of Infrastructure Projects. European Commission publishing.
]Search in Google Scholar
[
European Commission-Directorate General for Regional and Urban Policy (DG XVI). (2015). Public Procurement-Guidance for Practitioners. European Commission publishing.
]Search in Google Scholar
[
Fadel, S. M. & Al-Ajmi, J. (2017). Risk management of Islamic banks: A search for empirical evidences. Corporate Ownership & Control Journal, 14(2), 8–16. https://doi.org/10.22495/cocv14i2art110.22495/cocv14i2art1
]Search in Google Scholar
[
Georgiou, A. K. et al. (2015). Simulationtechniques in management science (Teknikes Prosomiosis sti Diikitiki Epistimi). Kallipos.
]Search in Google Scholar
[
Government Accountability Office. (2009). Cost estimating and assessment guide. GAO 09-3SP.
]Search in Google Scholar
[
Government Accountability Office. (2015). Schedule assessment guide– Best practices for project schedules. GAO 16-89G.
]Search in Google Scholar
[
Gruneberg, S. L. & Ive, G. J. (2000). The economics of the modern construction firm. Mackmillan Press.10.1057/9780230510432
]Search in Google Scholar
[
Guidance Note 1.3. (2009). Budget development, v. 1.0, Department of Finance publishing.
]Search in Google Scholar
[
Guidance Note 1.5.1. (2016). Public works contracts: Managing the pre-contract phase.v. 1.0, Department of Public Expenditure and Reform publishing.
]Search in Google Scholar
[
Hillebrandt, P. M. (2000). Economic theory and the construction industry (3rd ed.). Mackmillan Press.
]Search in Google Scholar
[
Humphreys, K. K. (2005). Project and cost engineers’ handbook (4th ed.). Marcel Dekker publishing.
]Search in Google Scholar
[
Infanti, M. (2011). How to estimate and use management reserve in an earned value management system (EVMS). 2011 ISPA/SCEA Joint Annual Conference and Training Workshop. http://www.iceaaonline.com/ready/wp-content/uploads/2017/09/MT08A_Paper_ManagementReserveinEVMSystem_Infanti.pdf
]Search in Google Scholar
[
International Atomic Energy Agency. (2005). Financial aspects of decommissioning (IAEATECDOC-1476). https://www-pub.iaea.org/MTCD/publications/PDF/te_1476_web.pdf
]Search in Google Scholar
[
Ive, G. J., & Gruneberg, S. L. (2000). The economics of the modern construction sector. Mackmillan Press publishing.10.1057/9780230510913
]Search in Google Scholar
[
Kwak, Y. H. & Anbari, F. T. (2012). History, practices, and future of earned value management in government: Perspectives from NASA. Project Management Journal, 43(1), 77–90. https://doi.org/10.1002/pmj.2027210.1002/pmj.20272
]Search in Google Scholar
[
Logistics Management Institute. (2000). Better development cost estimating through modeling and simulation (report No. LMI-PA903T1). https://apps.dtic.mil/sti/pdfs/ADA378782.pdf
]Search in Google Scholar
[
Melamed, D. & Loop, R. (2014). Cost schedule reserves in a project baseline, an owners and contractor’s perspective. AACE International Technical Paper.
]Search in Google Scholar
[
Menger, C. (2007). Principles of economics. Ludwig von Mises Institute. http://www.hacer.org/pdf/Menger04.pdf
]Search in Google Scholar
[
Metallinos, P. (2011). Public works management – costing policies and legislative study (DiahirisiDimosion Ergon – politikescostologisis kai meletinomotesias), Tziola editions.
]Search in Google Scholar
[
Metallinos, P. (2013). Expanded oligopolization of the Greek public works market through the framework of law. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 5(2), 86–89. https://doi.org/10.1061/(ASCE)LA.1943-4170.000010510.1061/(ASCE)LA.1943-4170.0000105
]Search in Google Scholar
[
Metallinos, P. (2014). Measurement of the cost of a public works project: The case of Greece. European Journal of Law and Economics, 37(3), 517–527. https://doi.org/10.1007/s10657-012-9353-010.1007/s10657-012-9353-0
]Search in Google Scholar
[
Metallinos, P. (2018). Interpretation of mathematic model of measurement of a public work’s cost after contractor’s election and before the start of contractual activities. Baltic Journal of Real Estate Economics and Construction Management, 6(1), 131–143. https://doi.org/10.2478/bjreecm-2018-001010.2478/bjreecm-2018-0010
]Search in Google Scholar
[
Metallinos, P. (2019). Interpretation of the concept of “discount” in technical works tenders. HOLISTICA– Journal of Business and Public Administration, 10(1), 16–23. https://doi.org/10.2478/hjbpa-2019-000210.2478/hjbpa-2019-0002
]Search in Google Scholar
[
National Aeronautics and Space Administration. (2010). NASA Schedule Management Handbook. NASA publishing.
]Search in Google Scholar
[
National Aeronautics and Space Administration. (2015). NASA Cost Estimating Handbook (version 4.0). NASA publishing.
]Search in Google Scholar
[
National Aeronautics and Space Administration. (2018). NASA Work Breakdown Structure (WBS) Handbook. NASA publishing.
]Search in Google Scholar
[
National Aeronautics and Space Administration. (2018a). Earned Value Management (EVM) Implementation Handbook (SP-2018-599). NASA publishing.
]Search in Google Scholar
[
NDIA IPMD. (2015). Earned Value Management Systems Application Guide. NDIA IPMD publishing.
]Search in Google Scholar
[
NDIA IPMD. (2016). Earned Value Management Systems Guideline Scalability Guide. NDIA IPMD publishing.
]Search in Google Scholar
[
NDIA IPMD. (2018). Earned Value Management Systems EIA-748-D Intent Guide. NDIA IPMD publishing.
]Search in Google Scholar
[
Nicholson, W. & Snyder, C. (2008). Basic principles and extensions (10th ed.). Thomson South-Western publishing.
]Search in Google Scholar
[
O.E.C.D.-N.E.A. (2013). Cost Control Guide for Decommissioning of Nuclear Installations. O.E.C.D. publishing.
]Search in Google Scholar
[
O.E.C.D. (2014). Regulatory Compliance Cost Assessment Guidance. O.E.C.D. publishing.
]Search in Google Scholar
[
O.E.C.D.-N.E.A. (2015). The Practice of Cost Estimation for Decommissioning of Nuclear Facilities. O.E.C.D. publishing.
]Search in Google Scholar
[
O.E.C.D.-N.E.A. & I.A.E.A. (2017). Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities. O.E.C.D. publishing.
]Search in Google Scholar
[
Project Management Institute. (2011). Practice Standard for Earned Value Management (2nd ed.). PMI publishing.
]Search in Google Scholar
[
Samuelson, W. F. & Marks, S. G. (2012). Managerialeconomics (7th ed.). Wiley & Sons. http://www.mim.ac.mw/books/Samuelson%20Managerial%20Economics%207e.pdf
]Search in Google Scholar
[
Thomas, R. (2001). Construction contract claims (2nd ed.). Palgrave publishing.
]Search in Google Scholar
[
U.S. Department of Defense. (2005). Construction Cost Estimates (UFC 3-700-02A/01-03-2005).
]Search in Google Scholar
[
U.S. Department of Defense. (2015). Earned Value Management System Interpretation Guide (OUSD AT&L (PARCA)/02-18-2015).
]Search in Google Scholar
[
U.S. Department of Energy. (1997). Cost Estimating Guide (DOE G 430.1-1/03-28-97).
]Search in Google Scholar
[
U.S. Department of Energy. (2015a). Cost Estimating Guide (DOE G 413.3-21/10-22-2015).
]Search in Google Scholar
[
U.S. Department of Energy. (2015b). Change Control Management Guide-DOE G 413.3-20/10-22-2015, U.S.A.
]Search in Google Scholar
[
U.S. Department of Energy. (2016). Earned Value Management Systems Interpretation Handbook (EVMSIH (2.0)).
]Search in Google Scholar
[
U.S. Department of Justice – Office of the Chief Information Officer. (2010). Information Technology (IT) Investment Baseline Management Guide.
]Search in Google Scholar
[
Venkataraman, R. R. & Pinto, J. K. (2008). Cost and value management in projects. Wiley & Sons. http://160592857366.free.fr/joe/ebooks/tech/Wiley%20Cost%20and%20Value%20Management.pdf10.1002/9780470261033
]Search in Google Scholar
[
Wouters, M. et al. (2012). Cost management. Strategies for business decisions. McGraw-Hill.
]Search in Google Scholar