Otwarty dostęp

Two Meta–Heuristic Algorithms for Scheduling on Unrelated Machines with the Late Work Criterion

International Journal of Applied Mathematics and Computer Science's Cover Image
International Journal of Applied Mathematics and Computer Science
Big Data and Signal Processing (Special section, pp. 399-473), Joanna Kołodziej, Sabri Pllana, Salvatore Vitabile (Eds.)

Zacytuj

Abasian, F., Ranjbar, M., Salari, M., Davari, M. and Khatami, S.M. (2014). Minimizing the total weighted late work in scheduling of identical parallel processors with communication delays, Applied Mathematical Modelling38(15): 3975–3986.10.1016/j.apm.2014.01.006Search in Google Scholar

Błażewicz, J. (1984). Scheduling preemptible tasks on parallel processors with information loss, Technique et Science Informatiques3(6): 415–420.Search in Google Scholar

Błażewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Sterna, M. and Weglarz, J. (2019). Handbook on Scheduling: From Theory to Practice, Springer, Cham.10.1007/978-3-319-99849-7Search in Google Scholar

Błażewicz, J. and Finke, G. (1987). Minimizing mean weighted execution time loss on identical and uniform processors, Information Processing Letters24(4): 259–263.10.1016/0020-0190(87)90145-1Search in Google Scholar

Błażewicz, J., Kovalyov, M.Y., Musiał, J., Urbański, A.P. and Wojciechowski, A. (2010). Internet shopping optimization problem, International Journal of Applied Mathematics and Computer Science20(2): 385–390, DOI: 10.2478/v10006-010-0028-0.10.2478/v10006-010-0028-0Search in Google Scholar

Blazewicz, J., Pesch, E. and Sterna, M. (2000). The disjunctive graph machine representation of the job shop scheduling problem, European Journal of Operational Research127(2): 317–331.10.1016/S0377-2217(99)00486-5Search in Google Scholar

Błażewicz, J., Pesch, E., Sterna, M. and Werner, F. (2004). Open shop scheduling problems with late work criteria, Discrete Applied Mathematics134(1): 1–24.10.1016/S0166-218X(03)00339-1Search in Google Scholar

Błażewicz, J., Pesch, E., Sterna, M. and Werner, F. (2005). The two-machine flow-shop problem with weighted late work criterion and common due date, European Journal of Operational Research165(2): 408–415.10.1016/j.ejor.2004.04.011Search in Google Scholar

Błażewicz, J., Pesch, E., Sterna, M. and Werner, F. (2007). A note on the two machine job shop with the weighted late work criterion, Journal of Scheduling10(2): 87–95.10.1007/s10951-006-0005-5Search in Google Scholar

Blazewicz, J., Pesch, E., Sterna, M. and Werner, F. (2008). Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date, Computers & Operations Research35(2): 574–599.10.1016/j.cor.2006.03.021Search in Google Scholar

Chen, R., Yuan, J., Ng, C. and Cheng, T. (2019). Single-machine scheduling with deadlines to minimize the total weighted late work, Naval Research Logistics (NRL)66(7): 582–595.10.1002/nav.21869Search in Google Scholar

Chen, X., Chau, V., Xie, P., Sterna, M. and Błażewicz, J. (2017). Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effect, Computers & Industrial Engineering111: 176–182.10.1016/j.cie.2017.07.016Search in Google Scholar

Chen, X., Kovalev, S., Sterna, M. and Błażewicz, J. (2020a). Mirror scheduling problems with early work and late work criteria, Journal of Scheduling, DOI:10.1007/s10951-020-00636-9.10.1007/s10951-020-00636-9Search in Google Scholar

Chen, X., Liang, Y., Sterna, M., Wang, W. and Błażewicz, J. (2020b). Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date, European Journal of Operational Research284(1): 67–74.10.1016/j.ejor.2019.12.003Search in Google Scholar

Chen, X., Sterna, M., Han, X. and Błażewicz, J. (2016). Scheduling on parallel identical machines with late work criterion: Offline and online cases, Journal of Scheduling19(6): 729–736.10.1007/s10951-015-0464-7Search in Google Scholar

Gerstl, E., Mor, B. and Mosheiov, G. (2019). Scheduling on a proportionate flowshop to minimise total late work, International Journal of Production Research57(2): 531–543.10.1080/00207543.2018.1456693Search in Google Scholar

Glover, F. (1989). Tabu search. Part I, ORSA Journal on Computing1(3): 190–206.Search in Google Scholar

Glover, F. (1990). Tabu search. Part II, ORSA Journal on Computing2(1): 4–32.Search in Google Scholar

Graham, R., Lawler, E., Lenstra, J. and Kan, A.R. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey, Annals of Discrete Mathematics5: 287–326.10.1016/S0167-5060(08)70356-XSearch in Google Scholar

Hariri, A.M., Potts, C.N. and Van Wassenhove, L.N. (1995). Single machine scheduling to minimize total weighted late work, ORSA Journal on Computing7(2): 232–242.10.1287/ijoc.7.2.232Search in Google Scholar

Holland, J.H. (1962). Outline for a logical theory of adaptive systems, Journal of the ACM9(3): 297–314.10.1145/321127.321128Search in Google Scholar

Kovalyov, M.Y., Potts, C.N. and Van Wassenhove, L.N. (1994). A fully polynomial approximation scheme for scheduling a single machine to minimize total weighted late work, Mathematics of Operations Research19(1): 86–93.10.1287/moor.19.1.86Search in Google Scholar

Kundakcı, N. and Kulak, O. (2016). Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem, Computers & Industrial Engineering96: 31–51.10.1016/j.cie.2016.03.011Search in Google Scholar

Labib, N.S., Danoy, G., Musial, J., Brust, M.R. and Bouvry, P. (2019). Internet of unmanned aerial vehicles—A multilayer low-altitude airspace model for distributed UAV traffic management, Sensors19(21): 4779.10.3390/s19214779Search in Google Scholar

Leung, J.Y. (2004). Minimizing total weighted error for imprecise computation tasks and related problems, in J.Y. Leung (Ed.), Handbook of Scheduling: Algorithms, Models, and Performance Analysis, Chapman and Hall/CRC, Boca Raton, FL.Search in Google Scholar

Lin, B.M. and Hsu, S. (2005). Minimizing total late work on a single machine with release and due dates, SIAM Conference on Computational Science and Engineering, Orlando, FL, USA.Search in Google Scholar

Lin, B.M., Lin, F. and Lee, R. (2006). Two-machine flow-shop scheduling to minimize total late work, Engineering Optimization38(04): 501–509.10.1080/03052150500420439Search in Google Scholar

Lopez-Loces, M.C., Musial, J., Pecero, J.E., Fraire-Huacuja, H.J., Blazewicz, J. and Bouvry, P. (2016). Exact and heuristic approaches to solve the Internet shopping optimization problem with delivery costs, International Journal of Applied Mathematics and Computer Science26(2): 391–406, DOI: 10.1515/amcs-2016-0028.10.1515/amcs-2016-0028Search in Google Scholar

Pesch, E. and Sterna, M. (2009). Late work minimization in flow shops by a genetic algorithm, Computers & Industrial Engineering57(4): 1202–1209.10.1016/j.cie.2009.05.011Search in Google Scholar

Piroozfard, H., Wong, K.Y. and Wong, W.P. (2018). Minimizing total carbon footprint and total late work criterion in flexible job shop scheduling by using an improved multi-objective genetic algorithm, Resources, Conservation and Recycling128: 267–283.10.1016/j.resconrec.2016.12.001Search in Google Scholar

Potts, C.N. and Van Wassenhove, L.N. (1992a). Approximation algorithms for scheduling a single machine to minimize total late work, Operations Research Letters11(5): 261–266.10.1016/0167-6377(92)90001-JSearch in Google Scholar

Potts, C.N. and Van Wassenhove, L.N. (1992b). Single machine scheduling to minimize total late work, Operations Research40(3): 586–595.10.1287/opre.40.3.586Search in Google Scholar

Rybarczyk, A., Hertz, A., Kasprzak, M. and Blazewicz, J. (2017). Tabu search for the RNA partial degradation problem, International Journal of Applied Mathematics and Computer Science27(2): 401–415, DOI: 10.1515/amcs-2017-0028.10.1515/amcs-2017-0028Search in Google Scholar

Servranckx, T. and Vanhoucke, M. (2019). A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs, European Journal of Operational Research273(3): 841–860.10.1016/j.ejor.2018.09.005Search in Google Scholar

Sterna, M. (2007). Metaheuristics for late work minimization in two-machine flow shop with common due date, Computers & Industrial Engineering52(2): 210–228.10.1016/j.cie.2006.12.004Search in Google Scholar

Sterna, M. (2011). A survey of scheduling problems with late work criteria, Omega39(2): 120–129.10.1016/j.omega.2010.06.006Search in Google Scholar

Talbi, E.-G. (2009). Metaheuristics: From Design to Implementation, Wiley & Sons, Hoboken, NJ.Search in Google Scholar

Whitley, D. (1994). A genetic algorithm tutorial, Statistics and Computing4(2): 65–85.10.1007/BF00175354Search in Google Scholar

Wu, C.-C., Yin, Y., Wu, W.-H., Chen, H.-M. and Cheng, S.-R. (2016). Using a branch-and-bound and a genetic algorithm for a single-machine total late work scheduling problem, Soft Computing20(4): 1329–1339.10.1007/s00500-015-1590-zSearch in Google Scholar

Yan, F., Dridi, M. and El Moudni, A. (2013). An autonomous vehicle sequencing problem at intersections, International Journal of Applied Mathematics and Computer Science23(1): 183–200, DOI: 10.2478/amcs-2013-0015.10.2478/amcs-2013-0015Search in Google Scholar

eISSN:
2083-8492
Język:
Angielski
Częstotliwość wydawania:
4 razy w roku
Dziedziny czasopisma:
Mathematics, Applied Mathematics