Impact of longwall mining on slope stability – A case study

Data publikacji: 27 Nov 2022
Tom & Zeszyt: Tom 44 (2022) - Zeszyt 4 (December 2022)
Zakres stron: 282 - 295
Otrzymano: 28 Oct 2020
Przyjęty: 30 Aug 2022
Informacje o czasopiśmie
License
Format
Czasopismo
eISSN
2083-831X
Pierwsze wydanie
09 Nov 2012
Częstotliwość wydawania
4 razy w roku
Języki
Angielski
Introduction

In global mining, for a number of reasons, the number of mining operations considering an open pit (OP)–underground (UG) transition is significantly increasing and most of them (85%) are ore mines [1,2]. The application of such a mining technique in coal mines is uncommon due to difficult natural conditions, mainly the much lower mechanical parameters of rock mass compared to ore mines [3]. In the decision-making process, various factors should be taken under consideration. One of them is an assessment of the impact of UG mining on the stability of pit slopes. UG operations cause surface subsidence, deformations, and changes in hydrogeological conditions [4]. In OP–UG operation, the UG-induced subsidence can lead to slope deformation. Historical slope failure incidents, including the Palabora mine in South Africa [5], Ernest Henry mine in Australia [6], and Los Bronces mine in Chile [7], provide a clear warning regarding the impact of caving operations on an OP slope.

Limited studies were also conducted to prove the impact of longwall coal mining on an OP slope. Peng et al. [8] established a mined slope calculation model with the influence analysis of UG mining on slope, distortion, and stress distribution. Based on this model, the stability calculating method was analyzed and the judgment formulae were elicited, with the determination principle and judgment of minimum protecting coal pillar width of the slope drawn. Nguyen and Niedbalski [1] reported an attempt at evaluating the influence of longwall operations on the slope stability of a still-functioning OP coal mine. In this study, the slope face displacements were calculated, taking into account some considerations regarding UG operation, such as exploitation depth, direction, and the distance from the slope plane (face). Based on the outcomes, a protecting coal pillar was determined to avoid impact on the OP slope. Payne et al. [9] introduced a case study that has experienced a significant effect of longwall subsidence on the open cut highwall movement when the longwall operation approached their final position (stop line), close to the open cut highwall. Results from the monitoring (radar and laser scanners) found the highwall is displaced to magnitudes unlike those typically measured in open-cut mining and is in direct contrast to typical longwall subsidence behavior. Recommendations are made for mine and pit designs for future punch longwall layouts.

Generally, surface subsidence prediction methods can be divided into two categories: empirical methods and theoretical numerical methods. The accuracy and efficiency of surface subsidence prediction methods depend on location, knowledge of geologic and to pographic conditions, and the level of mining experience [10,11,12,13]. Empirical methods including graphical, profile function, and influence function methods are developed based on the mathematical assumptions between the surface movements and the mining geometry. The influence functions, such as Keinhorst's method [14], Bals’ method [15], and Knothe's method [16,17], are widely used due to their applicability to complex mine geometry and various types of mining situations and possibility of validation mathematically. Theoretical numerical methods are based on modeling the UG-induced surface subsidence mechanisms. Numerical methods enable the presentation of more complex relationships between strain and deformation based on the modeled properties of the rock mass. They can also incorporate the influence of varying surface topography, lithology, and large-scale structure [18]. The first numerical applications are presented in [19,20,21,22]. In recent years, with the development of computer science, numerical methods have become increasingly popular for solving the problems of geoengineering. They prove particularly useful when their results are used for comparison with the results of observations under natural conditions. Issues related to displacement and surface deformation predictions are also solved by applying numerical methods. The implementation of numerical methods for surface deformation prediction in coal mining using the longwall UG method was performed by many other researchers [23,24,25,26,27,28,29,30,31,32].

Currently, Vietnamese coal mining is a very important part of the national economy and hard coal is mined using both the OP method and the UG method. The decision to switch from OP mining to UG mining was taken for several reasons, including technological possibilities, economic and environmental conditions, and social aspects [33]. Coal production from the UG mines in Quang Ninh province is steadily increasing and is predicted to be approximately 75% of the total coal production in 2030 [34, 35]. Cao Son is an OP mine located in the Cam Pha coal basin, Quang Ninh. The Cao Son OP mine decided to change its operation system from OP to UG (Khe Cham II–IV). According to the latest operation plan, simultaneous operation started in 2022 and will be conducted until 2038 [33]. In order to evaluate the stability of the Cao Son slope, the surface and subsurface strain fields generated by UG operation at Khe Cham II–IV were investigated by using numerical modeling with an FDM (Finite Difference Method) code, FLAC2D [36]. In addition, the factor of safety as a slope stability measurement was performed for certain stages of OP slope with UG advance. Based on the obtained results, slope stability evaluations and practical recommendations for Cao Son and Khe Cham II–IV operation are presented.

Case study
Site study location

The Cao Son mine is located in the Cam Pha coal basin in the Quang Ninh province, Vietnam. The OP is about 150 km east of the Vietnamese capital city, Hanoi (Figure 1).

Figure 1

Location of the Cao Son open pit coal mine [37].

The Cao Son OP mine decided to make the transition from OP to UG in 2015. The Khe Cham II–IV UG operation is planned to extract coal seams No. 9 (2022–2036) and No. 8 (2025–2040) using the longwall mining method. Simultaneous operation (Cao Son and Khe Cham II–IV) will be conducted until 2038, when the Cao Son OP mine ends its mining activities in coal seam No. 10 (Figure 2).

Figure 2

Exploitation plan in the region of Cao Son and Khe Cham II–IV in the North–South cross section (A–A′).

Brief geotechnical characteristics of rock mass at the study site

The Quaternary period rock mass of an average thickness of 20 m mainly consists of gravel, sand, and rolled fill. The mechanical properties of the Quaternary period rock mass are density 1800–2200 (kg/m3), cohesion 25–130 (kPa), and friction angle 9°–31°. Below, the Triassic rock mass consists of hard rocks: sandstone (48%), mudstone (25%), conglomerate (16%), coal (anthracite) (8%), and claystone (3%) [33]. Thickness of the Triassic period rock mass ranges from 500 to 700 m. Average inclination angle of the rock layers is 10°–15°. The lithology and distribution of rock mass in the Cao Son and Khe Cham II–IV region is shown in Figure 3.

Figure 3

Fragmental lithology and distribution of rock mass at the site study.

Tables 1 and 2 show the mechanical properties of rocks and faults in the studied region.

Mechanical properties of rock mass in the studied region [33].

Type of rock mass Bulk modulus K (GPa) Shear modulus G (GPa) Cohesion c (MPa) Fiction angle φ (°) Tensile strength σt (MPa) Density ρ (kg/m3)
Mudstone 2.31 1.54 1.87 30 1.34 2620
Claystone 2.23 1.34 2.05 26 1.14 2600
Anthracite 2.17 1.36 2.14 27 1.22 1500
Conglomerate 4.76 3.57 3.23 28 2.27 2510
Sandstone 3.91 2.46 3.56 28 1.96 2600

Strength parameters of the fault in the studied region [33].

Strength parameters Friction angle (°) Cohesion (kPa) Tensile strength (kPa)
Value 12–20 3.4–4.4 0
The impact of longwall mining on slope stability – numerical analysis
Brief description of FLAC2D

The FLAC2D program is based on the finite difference method, uses an explicit, time-marching method to solve the algebraic equations, but implicit, matrix-oriented solution schemes are more common in finite elements [36].

For the purposes of this piece of work, numerical calculations were carried out using the Coulomb–Mohr elastic–plastic model. The failure envelope for this model corresponds to a Mohr–Coulomb criterion (shear yield function) with tension cut-off (tensile yield function). The shear flow rule is nonassociated and the tensile flow rule is associated. The Mohr–Coulomb model takes into consideration the plasticity of the rock mass, which is the nonlinearity of its stress–strain characteristics. The plastic flow formulation in FLAC2D rests on basic assumptions from plasticity theory that the total strain increment may be decomposed into elastic and plastic parts, with only the elastic part contributing to the stress increment by means of an elastic law. In addition, both plastic and elastic strain increments are taken to be coaxial with the current principal axes of the stresses [36].

The factor-of-safety calculation can be performed for stability analyses in FLAC2D. This calculationis basedupon the “strength reduction method” to determine a factor of safety. The strength reduction method is an increasingly popular numerical method for evaluating the factor of safety in geomechanics. This method is typically applied in factor-of-safety calculations by progressively reducing the shear strength of the material to bring the slope to a state of limiting equilibrium. The method is commonly applied with the Mohr–Coulomb failure criterion. A series of simulations are made using trial values of the factor Ftrial to reduce the cohesion, c, and the friction angle, φ, until slope failure occurs. Tensile strength, σt, can also be included if necessary. In this case, the safety factor F is defined according to the following equations: ctrial=1Ftrialc {c_{{\rm{trial}}}} = {1 \over {{F_{{\rm{trial}}}}}} \cdot c φtrial=arctan(1Ftrialtanφ) {\varphi _{{\rm{trial}}}} = \arctan \left({{1 \over {{F_{{\rm{trial}}}}}} \cdot \tan \varphi} \right) σttrial=1Ftrialσt {\sigma ^t}_{{\rm{trial}}} = {1 \over {{F_{{\rm{trial}}}}}} \cdot {\sigma ^t}

The strength reduction method can be applied to essentially any material failure model to evaluate a factor of safety based upon the reduction of a specified strength property or property group. The method has been used extensively in the context of Mohr–Coulomb material and, principally, the simultaneous reduction of cohesion and frictional strength. In FLAC2D, in addition to Mohr–Coulomb strength properties, the method is also applied automatically to ubiquitous-joint strength properties and to Hoek–Brown strength properties. The strength reduction method can also be applied for interface strength properties, friction, and cohesion (e.g., faults) and to grout shear strength of the structural elements (e.g., cable, pile, and rockbolt elements) [36].

In FLAC2D, one of the many indicators that can be used to assess the state of the numerical model is the plasticity indicator. It determines the possibility of the failure of individual rock mass points as a result of tensile or shear stresses. Moreover, displacements, velocity vectors, stresses, strains, and so on can be plotted if necessary. These parameters were used to analyze the impact of the Khe Cham II–IV UG operation on the Cao Son OP.

Model description and input data for numerical modeling

Model includes a 3200 m long (x-axis) and 700–1100 m high (y-axis), presenting a 400 m open pit highwall, the coal seam No. 9 with an average thickness of 3 m located under the OP and two major faults crossed the pit slope. All models were conducted following typical boundary conditions for slope stability analysis: the bottom was fixed, a roller was applied to the sides of the model, and the top surface was set free (Figure 4). The modeled site study consisted of approx. 40,000 elements of four-node quadrilateral. The model was originally developed as an elastic model to achieve the initial stress state. Then, the displacement and velocity vectors were reset. In the next step, the “null” model was assigned to the zones corresponding to the extracted coal seam No. 9, and the Cao Son overburden and the model were recalculated.

Figure 4

Simplified 2D model geometry.

The rock mass was modelled as a Mohr–Coulomb material using built-in constitutive model available in FLAC2D. A summary of the mechanical parameters for numerical modeling is presented in Tables 1 and 2.

Modeling of longwall mining
Geometry of the caved zone induced by longwall mining

Determining the geometry of the caved zone was the subject of a number of studies that were later used to develop various empirical formulas (Table 3).

Hypotheses for calculating thickness of the caved zone.

Author, year Thickness of caved zone
Peng and Chiang, 1984 [38] (2–10)t
Bai et al., 1995 [39] 100t/(c1g+c2)
Mazurkiewicz et al., 1997 [40] t/(kr−1)
Heasley, 2004 [41] (10–18)t
Biliński, 2005 (simplified) [42] (nkst)/(0.05Rc0.5+0.02)
Wang et al., 2017 [43] (3–4)t

t – thickness of coal seam,

c1, c2 – constants dependent on the compressive strength of roof rocks,

kr – bulking factor for geological and mining conditions in Polish mines (1.15–1.5),

n – coefficient of intensity of movements in the area of destressed rock mass, n = 2 in the case of full caved longwall mining,

ks – compressibility factor of gob, ks = 0.8 for the caved zone,

Rc – weighted average compressive strength of roof rocks

The height of the caved zone tends to be proportional to the thickness of the exploited seam. The variety of hypotheses is large due to the different mining conditions in which the tests were conducted. However, only Bai et al. [39] and Biliński [42] considered the compressive strength of roof rocks in order to estimate the height of the caved zone. Therefore, these hypotheses are considered to be the most reliable for determining the geometry of caved zone induced by longwall mining.

Mechanical parameters of the caved zone

Access to the caved zone is limited. Therefore, it is very difficult to find equivalent mechanical properties that are reliable to express the heterogeneity of these materials.

Various studies were carried out to determine the equivalent mechanical properties of the caved zone. The elastic modulus of this zone can be calculated as a function of the compressive strength of undisturbed roof rocks and the bulking factor [44]. Tajduś [45] used the back analysis method to determine the value of parameters of a disturbed rock mass caused by mining. He found that the elastic modulus in the horizontal and vertical directions is very low and ranges from 50 to 150 MPa. Cheng et al. [46] and Jiang et al. [47] assumed that the elastic modulus and Poisson's ratio in the caved zone are 190 MPa and 0.25, respectively. Ahmed et al. [48] suggested that the elastic modulus of the caved zone is about 2.1% of the elastic modulus of roof rocks.

Calculation variations

In order to assess slope stability for the 2025 stage and 2030 stage of the Cao Son pit slope, the factor of safety was implemented with the Shear Strength Reduction technique. Next, numerical calculations were carried out to show the impact of UG Khe Cham II–IV operation in coal seam No. 9 on the pit slope in 2025 and 2030. According to the UG operation plan [33], about 20% of coal seam no. 9 under the Cao Son pit slope will be mined by 2025 (two longwall panels which are each 160 m long) and approximately 50% of the coal seam will be mined by 2030 (five longwall panels, each 160 m long). Three different scenarios were considered for the investigation of the UG impact on the 2025 slope stability: I – UG operation starts from the left-hand side; II – UG operation starts from the center; and III – UG operation starts from the right-hand side (Figure 5). Then, the best option of the extraction location was selected. From the selected option, two other scenarios were considered in order to examine the impact of further UG extraction on the 2030 slope stability: IV – extracting the further longwall panels near the mined panels, V – extracting the further longwall panels in another side of the mined panels.

Figure 5

Calculation variants due to pit slope stages and monitoring points on the slope surface.

Results analysis and discussion

The results of the numerical calculations are presented in the form of maps of the plasticity indicator and maps of the FoS (Factor of Safety) contour, which enable assessment of the impact of UG on slope stability. Due to the large number of results obtained, only selected results for certain calculation variations are shown in this manuscript.

Pit slope in 2025: The geometry of the slope with a simplified structure is shown in Figure 6a. The slope consists of three main slope walls (two on the left side and one on the right side). The angle of the lower left wall is 19° and the angle of the upper left wall is 30°. The right wall angle is the most inclined by 33°. The obtained results are presented in Figure 6b. The global lowest FoS value was 2.09 on the upper left wall (>1.5 – occurrence of landslides is very unlikely [49]), while the FoS value of the right wall was estimated at over 2.5. The slope in 2025 will be stable.

Figure 6

Pit slope in 2025: (a) scheduled geometry, (b) FoS contours and slope failure surfaces.

Pit slope in 2030: The geometry of the slope with a simplified structure is shown in Figure 7a. The slope consists of three main walls (two on the left and one on the right). The lower left wall has a slope angle of 37° and is the greatest slope angle in the slope. The angle of the upper left wall is 27°. The angle of the right wall is 33°. The obtained results are presented in Figure 7b. The global lowest FoS value was in a range from 1.75 to 2.0 on the entire left wall (1.98) (>1.5), while the FoS value of the right wall was estimated in a range from 2.0 to 2.25. This indicates that the slope in 2030 will be stable.

Figure 7

Pit slope in 2030: (a) scheduled geometry, (b) FoS contours and slope failure surfaces.

Impact of UG longwall mining on the 2025 pit slope: About 320-m-long coal seam No. 9 (cross section) will be extracted by 2025.

Plasticity indicators were also calculated for scenarios I, II, and III, as shown in Figure 8. The failure zone will reach the slope surface in scenario II and scenario III by 2025 (Figure 8b and c). These failures could negatively affect OP operations such as transportation machinery and equipments. Additionally, they could form the path-inrush water from the pit floor to further UG exploitation in the coal seam No. 9. The failure zone in scenario I did not reach the slope surface (Figure 8a). Hence, scenario I is considered to be better than scenarios II and III in terms of UG impact on slope stability.

Figure 8

Failure zone induced by UG operation by 2025: (a) scenario I, (b) scenario II, (c) scenario III

The calculated FoS values for the three scenarios (I, II, III) with the impact of UG operation are shown in Figure 9. In general, the size of the slope failure surface was larger and deeper inside the slope body in all scenarios. The global lowest FoS value descreased in scenario II (from a value of over 2.0 to less than 1.75 on the left wall) (Figures 6b and 9b) and scenario III (from a value of over 2.5 to less than 2.25 on the right wall) (Figures 6b and 9c). In scenario I, the global lowest FoS value was the same (over 2.0) (Figures 6b and 9a). A summary of the FoS value and the size of the slope failure surface by 2025 is shown in Table 4. FoS values also confirm that scenario I is a better option than scenarios II and III in terms of the impact of UG on slope stability.

Figure 9

FoS values for defferent scenarios of UG operation by 2025: (a) scenario I, (b) scenario II, (c) scenario III.

Change of FoS value and size of the slope failure surface with different scenarios of UG operation by 2025.

Slope in 2025 FoS valueSize of the slope failure surface

Before UG After UG

Scenario I Scenario II Scenario III
Left slope wall 1.75–2.0 1.75–2.0Increased 1.5–1.75Increased 1.75–2.0-
Right slope wall >2.5 >2.5- >2.5- 2.0–2.25Increased

The impact of UG longwall mining on the 2030 pit slope: By 2030, the OP will be deeper and approximately another 500 m length of coal seam No. 9 will be extracted (the total length of the longwall panel will be about 800 m). The failure zone will be extended and will reach the slope surface in scenarios IV and V (Figure 10). The extended UG-induced failure zone by 2030 tends to enlarge the size of the slope failure surface and decrease the FoS value as shown in the case of the pit slope in 2025.

Figure 10

Failure zone induced by UG operation by 2030: (a) scenario IV, (b) scenario V.

In scenario IV, the impact of UG operation could be eliminated with time by the overburden extraction of the left side of the slope in the next stage (2038), and the right side part could be independently extracted while the pit slope above ends its operation. In this case, scenario IV is considered to be the better extraction option, rather than scenario V.

In general, longwall subsidence increases the size of slope failure surface inside the slope body in all calculation scenarios. For an OP–UG transition case study at the Cao Son mine, the calculated values of FoS were reduced by approximately 10%, depending on the location of the longwall panel. Despite reduction in the FoS values, the 2025 pit slopes are considered stable due to high FoS values of the planned slopes (much greater than 1.5). In case of slopes with low FoS values (e.g., less than 1.3), such a reduction of FoS values (10%) could have a significant impact on slope stability or even lead to loss of stability. Increase in the length of longwall panel enlarges the longwall subsidence. As a consequence, the size of slope failure surface increases and the FoS values tendentiously reduce. In a simultaneous operation, the impact of longwall subsidence on the previous slope phase can be reduced in the next slope phase by modifying the slope geometry. Geomechnical assessments should be carried out on an ongoing basis for each phase advance of both OP and UG operations. Such an action aims to indetify the possible slope failures and minimize the impact of longwall mining on slope stability.

Conclusions

The obtained results confirm the impact of UG operation on slope stability. UG extraction decreases the slope FoS and increases the size of slope failure surface inside slope body. The grade of impact is dependent on the UG extraction arrangements (extraction location and length). The UG-induced deformation occurring on the slope surface can negatively impact on OP operations, for example, transport or mining equipment. It also may initiate the slope failure surface and lead to pit slope failure with further UG advance. In the case of the Cao Son and the Khe Cham II–IV operations, the recommended option for UG operation in coal seam No. 9 is to start the UG operations from the left side (scenario I) and expand it to the other side (scenario IV). This operation arrangement minimizes the UG-induced impact on the pit slopes at the 2025 stage and 2030 stage.

The impact of UG operation on the OP slope is a continuous process related to the advances of both the OP and UG exploitations. During simultaneous operations, such as Cao Son and Khe Cham II–IV, changes in slope geometry can also reduce the impact of UG exploitation. Hence, it requires an appropriate schedule and the coordination of both OP and UG extraction.

From field practices, some suggestions are drawn: (1) applying full/partly hydraulic backfill as a method of ground control can reduce the impact of UG on slope stability and (2) applying slope regrading aims to prevent slope landslide if needed.

The analysis conducted provides the preliminary assessments of impact of UG on slope stability based on actual geo-mining conditions at the Cao Son OP mine. While these results are valuable, monitoring programs are recommended in order to control uncertainty and risk in the long term.

Further investigations should focus on the development of 3D geological and topographic models for 3D analysis, which would allow the direction and location of longwall panels in single coal seams and multi-coal seams to be taken into consideration. The outcomes would deliver better understanding and accuracy of OP–UG interaction.

Figure 1

Location of the Cao Son open pit coal mine [37].
Location of the Cao Son open pit coal mine [37].

Figure 2

Exploitation plan in the region of Cao Son and Khe Cham II–IV in the North–South cross section (A–A′).
Exploitation plan in the region of Cao Son and Khe Cham II–IV in the North–South cross section (A–A′).

Figure 3

Fragmental lithology and distribution of rock mass at the site study.
Fragmental lithology and distribution of rock mass at the site study.

Figure 4

Simplified 2D model geometry.
Simplified 2D model geometry.

Figure 5

Calculation variants due to pit slope stages and monitoring points on the slope surface.
Calculation variants due to pit slope stages and monitoring points on the slope surface.

Figure 6

Pit slope in 2025: (a) scheduled geometry, (b) FoS contours and slope failure surfaces.
Pit slope in 2025: (a) scheduled geometry, (b) FoS contours and slope failure surfaces.

Figure 7

Pit slope in 2030: (a) scheduled geometry, (b) FoS contours and slope failure surfaces.
Pit slope in 2030: (a) scheduled geometry, (b) FoS contours and slope failure surfaces.

Figure 8

Failure zone induced by UG operation by 2025: (a) scenario I, (b) scenario II, (c) scenario III
Failure zone induced by UG operation by 2025: (a) scenario I, (b) scenario II, (c) scenario III

Figure 9

FoS values for defferent scenarios of UG operation by 2025: (a) scenario I, (b) scenario II, (c) scenario III.
FoS values for defferent scenarios of UG operation by 2025: (a) scenario I, (b) scenario II, (c) scenario III.

Figure 10

Failure zone induced by UG operation by 2030: (a) scenario IV, (b) scenario V.
Failure zone induced by UG operation by 2030: (a) scenario IV, (b) scenario V.

Change of FoS value and size of the slope failure surface with different scenarios of UG operation by 2025.

Slope in 2025 FoS valueSize of the slope failure surface

Before UG After UG

Scenario I Scenario II Scenario III
Left slope wall 1.75–2.0 1.75–2.0Increased 1.5–1.75Increased 1.75–2.0-
Right slope wall >2.5 >2.5- >2.5- 2.0–2.25Increased

Mechanical properties of rock mass in the studied region [33].

Type of rock mass Bulk modulus K (GPa) Shear modulus G (GPa) Cohesion c (MPa) Fiction angle φ (°) Tensile strength σt (MPa) Density ρ (kg/m3)
Mudstone 2.31 1.54 1.87 30 1.34 2620
Claystone 2.23 1.34 2.05 26 1.14 2600
Anthracite 2.17 1.36 2.14 27 1.22 1500
Conglomerate 4.76 3.57 3.23 28 2.27 2510
Sandstone 3.91 2.46 3.56 28 1.96 2600

Strength parameters of the fault in the studied region [33].

Strength parameters Friction angle (°) Cohesion (kPa) Tensile strength (kPa)
Value 12–20 3.4–4.4 0

Hypotheses for calculating thickness of the caved zone.

Author, year Thickness of caved zone
Peng and Chiang, 1984 [38] (2–10)t
Bai et al., 1995 [39] 100t/(c1g+c2)
Mazurkiewicz et al., 1997 [40] t/(kr−1)
Heasley, 2004 [41] (10–18)t
Biliński, 2005 (simplified) [42] (nkst)/(0.05Rc0.5+0.02)
Wang et al., 2017 [43] (3–4)t

P.M.V. Nguyen, Z. Niedbalski, Numerical modelling of open pit (OP) to underground (UG) transition in coal mining. Studia Geotechnica et Mechanica. 38 (3), 35–48 (2016), DOI: 10.1515/sgem-2016-0023. NguyenP.M.V. NiedbalskiZ. Numerical modelling of open pit (OP) to underground (UG) transition in coal mining Studia Geotechnica et Mechanica 38 3 35 48 2016 10.1515/sgem-2016-0023 Otwórz DOISearch in Google Scholar

W.F. Visser, Optimization of the OP/UG Transition. Development of a Software Tool for Optimization of the Transition Depth and the Open Pit Slope Angle – Main report. Technische Universiteit Delft (2006). VisserW.F. Optimization of the OP/UG Transition. Development of a Software Tool for Optimization of the Transition Depth and the Open Pit Slope Angle – Main report Technische Universiteit Delft 2006 Search in Google Scholar

P.M.V. Nguyen, Optimization of crown pillar in transition from open pit to underground for the Quang Ninh coal basin, Vietnam. Ph.D. diss., AGH University of Science and Technology, KraKow (2017) (in Polish). NguyenP.M.V. Optimization of crown pillar in transition from open pit to underground for the Quang Ninh coal basin, Vietnam Ph.D. diss., AGH University of Science and Technology KraKow 2017 (in Polish). Search in Google Scholar

S.S. Peng, H.S. Chiang, Longwall Mining, John Wiley and Sons, Inc., New York (1984). PengS.S. ChiangH.S. Longwall Mining John Wiley and Sons, Inc. New York 1984 Search in Google Scholar

A. Moss, S. Diachenko, P. Townsend, Interaction between the Block Caving and the pit slope at Palabora mine. The South African Institute of Mining and Metallurgy. International Symposium, Stability of rock slopes in open pit mining and civil engineering situations (2006). MossA. DiachenkoS. TownsendP. Interaction between the Block Caving and the pit slope at Palabora mine The South African Institute of Mining and Metallurgy. International Symposium, Stability of rock slopes in open pit mining and civil engineering situations 2006 Search in Google Scholar

A.D. Campbell, E. Mu, C.R. Lilley, Cave propagation and open pit interaction at the Ernest Henry mine. Seventh international conference and exhibition on mass mining, Sydney (2016). CampbellA.D. MuE. LilleyC.R. Cave propagation and open pit interaction at the Ernest Henry mine Seventh international conference and exhibition on mass mining Sydney 2016 Search in Google Scholar

D.A. Diaz, M.G. Schellman, Geomechanical status and action plans for interaction between Andina subsidence crater and Los Bronces open pit, in PM Dight (ed.), Proceedings of the First Asia Pacific Slope Stability in Mining Conference, Australian Centre for Geomechanics, Perth. 613–628 (2016), DOI: 10.36487/ACG_rep/1604_41_Diaz. DiazD.A. SchellmanM.G. Geomechanical status and action plans for interaction between Andina subsidence crater and Los Bronces open pit in DightPM (ed.), Proceedings of the First Asia Pacific Slope Stability in Mining Conference Australian Centre for Geomechanics, Perth 613 628 2016 10.36487/ACG_rep/1604_41_Diaz Otwórz DOISearch in Google Scholar

H. Peng, Q. Cai, W. Zhou, J. Shu, G. Li, Study on Stability of Surface Mine Slope Influenced by Underground Mining below the Endwall Slope. Procedia Earth and Planetary Science. 2: 7–13 (2011), DOI: 10.1016/j.proeps.2011.09.002. PengH. CaiQ. ZhouW. ShuJ. LiG. Study on Stability of Surface Mine Slope Influenced by Underground Mining below the Endwall Slope Procedia Earth and Planetary Science 2 7 13 2011 10.1016/j.proeps.2011.09.002 Otwórz DOISearch in Google Scholar

D. Payne, M. Martin, B. Coutts, D. Lynch, Highwall stability implications from longwall mining at Broadmeadow mine, in Naj Aziz and Bob Kininmonth (eds.), Proceedings of the 2019 Coal Operators Conference, Mining Engineering, University of Wollongong, 91–102 (2019). PayneD. MartinM. CouttsB. LynchD. Highwall stability implications from longwall mining at Broadmeadow mine in AzizNaj KininmonthBob (eds.), Proceedings of the 2019 Coal Operators Conference Mining Engineering, University of Wollongong 91 102 2019 Search in Google Scholar

P.P. Bahuguna, A.M.C. Srivastava, N.C. Saxena, A critical review of mine subsidence prediction methods. Min. Sci. Technol. 13(3): 369–382 (1991), DOI: 10.1016/0167-9031(91)90716-P. BahugunaP.P. SrivastavaA.M.C. SaxenaN.C. A critical review of mine subsidence prediction methods Min. Sci. Technol. 13 3 369 382 1991 10.1016/0167-9031(91)90716-P Otwórz DOISearch in Google Scholar

G. Brauner, Subsidence due to underground mining. US Bur. Mines Rep., IC 8571 (1973). BraunerG. Subsidence due to underground mining US Bur. Mines Rep., IC 8571 1973 Search in Google Scholar

B.N. Whittaker, D.J. Reddish, Subsidence: Occurrence, Prediction and Control. Elsevier, Amsterdam (1989). WhittakerB.N. ReddishD.J. Subsidence: Occurrence, Prediction and Control Elsevier Amsterdam 1989 Search in Google Scholar

H. Kratzsch, Mining Subsidence Engineering Springer. Berlin: 543 (1983). KratzschH. Mining Subsidence Engineering Springer Berlin 543 1983 10.1007/978-3-642-81923-0 Search in Google Scholar

H. Keinhorst, Calculations of surface subsidence in Emscher. In: 25 Jahre der Emschergenossenschaft 1900–1925 (in German), Essen 53–64 (1925;) KeinhorstH. Calculations of surface subsidence in Emscher In: 25 Jahre der Emschergenossenschaft 1900–1925 (in German) Essen 53 64 1925 Search in Google Scholar

R. Bals, Problem of mining subsidence prediction. Stuttgart, Germany: Deutscher Markscheider-Verein e.V, Mitteilungen aus dem Markscheidewesen (in German). 42/43: 98–111 (1932). BalsR. Problem of mining subsidence prediction Stuttgart, Germany Deutscher Markscheider-Verein e.V, Mitteilungen aus dem Markscheidewesen (in German) 42/43 98 111 1932 Search in Google Scholar

S. Knothe, Time influence on shaping of subsidence trough. Archive of Mining Science. 1: 21–31 (1953). KnotheS. Time influence on shaping of subsidence trough Archive of Mining Science 1 21 31 1953 10.1021/cen-v031n021.p2201 Search in Google Scholar

S. Knothe, Prediction of mining influence (in Polish), Katowice, Poland (1984). KnotheS. Prediction of mining influence (in Polish) Katowice Poland 1984 Search in Google Scholar

J. Barbato, B. Hebblewhite, R. Mitra, K. Mills, Prediction of horizontal movement and strain at the surface due to longwall coal mining. International Journal of Rock Mechanics and Mining Sciences. 84: 105–118 (2016), DOI: 10.1016/j.ijrmms.2016.02.006. BarbatoJ. HebblewhiteB. MitraR. MillsK. Prediction of horizontal movement and strain at the surface due to longwall coal mining International Journal of Rock Mechanics and Mining Sciences 84 105 118 2016 10.1016/j.ijrmms.2016.02.006 Otwórz DOISearch in Google Scholar

H.D. Dahl, D.S. Choi, Some case studies of mine subsidence and its mathematical modelling, Application of Rock Mechanics In: E.R. Hoskins Editor, Proc. Syrup. on Rock Mechanics, South Dakota, 1–21 (1973). DahlH.D. ChoiD.S. Some case studies of mine subsidence and its mathematical modelling, Application of Rock Mechanics In: HoskinsE.R. Editor, Proc. Syrup. on Rock Mechanics South Dakota 1 21 1973 Search in Google Scholar

H.J. Siriwardane, J. Amanat, Modelling of subsidence caused by longwall mining using finite element and displacement discontinuity methods. In: Proc. Int. Conf. on Numerical Methods in Geo- mechanics, 1901–1910 (1988). SiriwardaneH.J. AmanatJ. Modelling of subsidence caused by longwall mining using finite element and displacement discontinuity methods In: Proc. Int. Conf. on Numerical Methods in Geo- mechanics 1901 1910 1988 Search in Google Scholar

M.A. Coulthard, A.J. Dutton, Numerical modelling of subsidence induced by underground coal mining. In: Key Questions in Rock Mechanics, Proc. U.S. Symp. on Rock Mechanics, 29th Minneapolis, 529–536 (1988). CoulthardM.A. DuttonA.J. Numerical modelling of subsidence induced by underground coal mining In: Key Questions in Rock Mechanics, Proc. U.S. Symp. on Rock Mechanics, 29th Minneapolis 529 536 1988 Search in Google Scholar

K.V. Shankar, B.B. Dhar, Subsidence prediction resulting from underground mining - a numerical modelling technique. Proc. Indian Geotech. Conf., Allahabad. 319–324 (1988). ShankarK.V. DharB.B. Subsidence prediction resulting from underground mining - a numerical modelling technique Proc. Indian Geotech. Conf. Allahabad 319 324 1988 Search in Google Scholar

G. Yang, Y.P. Chugh, Z. Yu, M.D.G. Salamon, A numerical approach to subsidence prediction and stress analysis in coal mining using a laminated model. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts. 30(7): 1419–1422 (1993), DOI: 10.1016/0148-9062(93)90130-6. YangG. ChughY.P. YuZ. SalamonM.D.G. A numerical approach to subsidence prediction and stress analysis in coal mining using a laminated model International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts 30 7 1419 1422 1993 10.1016/0148-9062(93)90130-6 Otwórz DOISearch in Google Scholar

X.L. Yao, D.J. Reddish, B.N. Whittaker, Non-linear finite element analysis of surface subsidence arising from inclined seam extraction. Int. J. Rock Mech. Min. Sci. 30(4): 31–41 (1993), DOI: 10.1016/0148-9062(93)91724-W. YaoX.L. ReddishD.J. WhittakerB.N. Non-linear finite element analysis of surface subsidence arising from inclined seam extraction Int. J. Rock Mech. Min. Sci. 30 4 31 41 1993 10.1016/0148-9062(93)91724-W Otwórz DOISearch in Google Scholar

R.P. Singh, R.N. Yadav, Prediction of subsidence due to coal mining in Raniganj coalfield, West Bengal, India. Engineering Geology. 39(2), 103–111 (1995), DOI: 10.1016/0013-7952(94)00062-7. SinghR.P. YadavR.N. Prediction of subsidence due to coal mining in Raniganj coalfield, West Bengal, India Engineering Geology 39 2 103 111 1995 10.1016/0013-7952(94)00062-7 Otwórz DOISearch in Google Scholar

P. Lloyd, N. Mohammad, D.J. Reddish. Surface subsidence prediction techniques for UK coalfields – An innovative numerical modelling approach, Mining Congress of Turkey, (1997) LloydP. MohammadN. ReddishD.J. Surface subsidence prediction techniques for UK coalfields – An innovative numerical modelling approach Mining Congress of Turkey 1997 Search in Google Scholar

L.R. Alejano, P. Ramírez-Oyanguren, J. Taboada, Predictive methodology for subsidence due to flat and inclined coal seam mining, International Journal of Rock Mechanics and Mining Sciences. 36(4), 475–491 (1999), DOI: 10.1016/S0148-9062(99)00022-4 AlejanoL.R. Ramírez-OyangurenP. TaboadaJ. Predictive methodology for subsidence due to flat and inclined coal seam mining International Journal of Rock Mechanics and Mining Sciences 36 4 475 491 1999 10.1016/S0148-9062(99)00022-4 Otwórz DOISearch in Google Scholar

K. Tajdus, New method for determining the elastic parameters of rock mass layers in the region of underground mining influence. International Journal of Rock Mechanics and Mining Sciences. 46(8):1296–1305 (2009), DOI: 10.1016/j.ijrmms.2009.04.006. TajdusK. New method for determining the elastic parameters of rock mass layers in the region of underground mining influence International Journal of Rock Mechanics and Mining Sciences 46 8 1296 1305 2009 10.1016/j.ijrmms.2009.04.006 Otwórz DOISearch in Google Scholar

K. Tajdus, Analysis of horizontal displacement distribution caused by single advancing longwall panel excavation. Journal of Rock Mechanics and Geotechnical Engineering. 7(4): 395–403 (2015), DOI: 10.1016/j.jrmge.2015.03.012. TajdusK. Analysis of horizontal displacement distribution caused by single advancing longwall panel excavation Journal of Rock Mechanics and Geotechnical Engineering 7 4 395 403 2015 10.1016/j.jrmge.2015.03.012 Otwórz DOISearch in Google Scholar

Keilich W. Numerical modelling of mining subsidence, upsidence and valley closure using UDEC. PhD thesis. University of Wollongong (2009). KeilichW Numerical modelling of mining subsidence, upsidence and valley closure using UDEC PhD thesis. University of Wollongong 2009 Search in Google Scholar

M. Wesolowski, J. Białek, P. Kołodziejczyk, F. Plewa, Modelowanie wpływów eksploatacji górniczej przy wykorzystaniu modeli numerycznych, Gliwice (2010). WesolowskiM. BiałekJ. KołodziejczykP. PlewaF. Modelowanie wpływów eksploatacji górniczej przy wykorzystaniu modeli numerycznych Gliwice 2010 Search in Google Scholar

A.M. Suchowerska Iwanec, J.P. Carter, J.P. Hambleton, Geomechanics of subsidence above single and multi-seam coal mining. Journal of Rock Mechanics and Geotechnical Engineering. 8(3): 304–313 (2016), DOI: 10.1016/j.jrmge.2015.11.007. Suchowerska IwanecA.M. CarterJ.P. HambletonJ.P. Geomechanics of subsidence above single and multi-seam coal mining Journal of Rock Mechanics and Geotechnical Engineering 8 3 304 313 2016 10.1016/j.jrmge.2015.11.007 Otwórz DOISearch in Google Scholar

Institute of Mining Science and Technology, Assessments on transition from open pit to underground in the Cao Son mine, Unpublished materials, Hanoi, Vietnam, 2012 and 2016 - updated version (in Vietnamese). Institute of Mining Science and Technology, Assessments on transition from open pit to underground in the Cao Son mine Unpublished materials, Hanoi, Vietnam, 2012 and 2016 - updated version (in Vietnamese). Search in Google Scholar

N.A. Do, D. Dias, P. Oreste, V.D. Dinh, Stability of tunnels excavated along anisotropic rock masses. Proceeding of international conference on earth sciences and sustainable geo-resources development, Hanoi, Vietnam (2016). DoN.A. DiasD. OresteP. DinhV.D. Stability of tunnels excavated along anisotropic rock masses Proceeding of international conference on earth sciences and sustainable geo-resources development Hanoi, Vietnam 2016 Search in Google Scholar

D.H. Duong, H.Q. Dao, M. Turek, A. Koteras, The status and prospect of mining technology in Vietnam underground coal mines. Inżynieria Mineralna – Journal of the Polish Mineral Engineering Society, 146–154 (2019), DOI: 10.29227/IM-2019-02-68. DuongD.H. DaoH.Q. TurekM. KoterasA. The status and prospect of mining technology in Vietnam underground coal mines Inżynieria Mineralna – Journal of the Polish Mineral Engineering Society 146 154 2019 10.29227/IM-2019-02-68 Otwórz DOISearch in Google Scholar

FLAC, Version 7.0, User's manual. Itasca Consulting Group Inc., Minneapolis (2011); software available at www.itascacg.com FLAC, Version 7.0, User's manual Itasca Consulting Group Inc. Minneapolis 2011 software available at www.itascacg.com Search in Google Scholar

https://www.google.com/maps/ [accessed 2019] https://www.google.com/maps/ [accessed 2019] Search in Google Scholar

S.S. Peng, H.S. Chiang. Longwall Mining, John Wiley and Sons, Inc., New York (1984). PengS.S. ChiangH.S. Longwall Mining John Wiley and Sons, Inc. New York 1984 Search in Google Scholar

M. Bai, F. Kendorski, D. Van Roosendaal, Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience and Guidelines. Proceedings of 14th International Conference on Ground Control in Mining, Morgantown (1995). BaiM. KendorskiF. Van RoosendaalD. Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience and Guidelines Proceedings of 14th International Conference on Ground Control in Mining Morgantown 1995 Search in Google Scholar

M. Mazurkiewicz, Z. Piotrowski, A. Tajduś, Lokowanie odpadów w kopalniach podziemnych. cz. II Geoinżynieria. Biblioteka Szkoły Eksploatacji Podziemnej, p. 129 (1997). MazurkiewiczM. PiotrowskiZ. TajduśA. Lokowanie odpadów w kopalniach podziemnych. cz. II Geoinżynieria Biblioteka Szkoły Eksploatacji Podziemnej 129 1997 Search in Google Scholar

K. Heasley, A review of Subsidence and Fire Potential at the Major Battery Site, Report no. 2004-P-0017 (2004). HeasleyK. A review of Subsidence and Fire Potential at the Major Battery Site Report no. 2004-P-0017 2004 Search in Google Scholar

A. Biliński, Metoda doboru obudowy ścianowych wyrobisk wybierkowych i chodnikowych do warunków pola eksploatacyjnego. Prace naukowe – Monografie CMG KOMAG. Gliwice (2005). BilińskiA. Metoda doboru obudowy ścianowych wyrobisk wybierkowych i chodnikowych do warunków pola eksploatacyjnego Prace naukowe – Monografie CMG KOMAG Gliwice 2005 Search in Google Scholar

H. Wang, D. Zhang, X. Wang, W. Zhang, Visual Exploration of the Spatiotemporal Evolution Law of Overburden Failure and Mining-Induced Fractures: A Case Study of the Wangjialing Coal Mine in China. Minerals, 7(3): 35 (2017), DOI: 10.3390/min7030035. WangH. ZhangD. WangX. ZhangW. Visual Exploration of the Spatiotemporal Evolution Law of Overburden Failure and Mining-Induced Fractures: A Case Study of the Wangjialing Coal Mine in China Minerals 7 3 35 2017 10.3390/min7030035 Otwórz DOISearch in Google Scholar

H. Yavuz, An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines. Journal of Rock Mechanics and Mining Sciences & Geomechanics, 41 (2): 193–205 (2004), DOI: 10.1016/S1365-1609(03)00082-0. YavuzH. An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines Journal of Rock Mechanics and Mining Sciences & Geomechanics 41 2 193 205 2004 10.1016/S1365-1609(03)00082-0 Otwórz DOISearch in Google Scholar

K. Tajduś, New method for determining the elastic parameters of rock mass layers in the region of underground mining influence. Int. J. Rock Mech. Mining Sci. 46 (8), 1296–1305 (2009), DOI: 10.1016/j.ijrmms.2009.04.006. TajduśK. New method for determining the elastic parameters of rock mass layers in the region of underground mining influence Int. J. Rock Mech. Mining Sci. 46 8 1296 1305 2009 10.1016/j.ijrmms.2009.04.006 Otwórz DOISearch in Google Scholar

Y.M. Cheng, J.A. Wang, G.X. Xie, W.B. Wei, Three-dimensional analysis of coal barrier pillars in tailgate area adjacent to the fully mechanized top caving mining face. Int. J. Rock Mech. Mining Sci. 47 (8), 1372–1383 (2010), DOI: 10.1016/j.ijrmms.2010.08.008. ChengY.M. WangJ.A. XieG.X. WeiW.B. Three-dimensional analysis of coal barrier pillars in tailgate area adjacent to the fully mechanized top caving mining face Int. J. Rock Mech. Mining Sci. 47 8 1372 1383 2010 10.1016/j.ijrmms.2010.08.008 Otwórz DOISearch in Google Scholar

Y. Jiang, H. Wang, S. Xue, Y. Zhao, J. Zhu, X. Pang, Assessment of mitigation of coal bump risk during extraction of an island longwall panel. Int. J. Coal Geol. 95: 20–33 (2012), DOI: 10.1016/j.coal.2012.02.003. JiangY. WangH. XueS. ZhaoY. ZhuJ. PangX. Assessment of mitigation of coal bump risk during extraction of an island longwall panel Int. J. Coal Geol. 95 20 33 2012 10.1016/j.coal.2012.02.003 Otwórz DOISearch in Google Scholar

S.S. Ahmed, A. Marwan, Y. Gunzburger, V. Renaud, 3D Numerical Simulation of the Goaf Due to Large-Scale Longwall Mining. International Congress and Exhibition “Sustainable Civil Infrastructures: Innovative Infrastructure Geotechnology” GeoMEast 2017: Numerical Analysis of Nonlinear Coupled Problems, 121–131 (2017). AhmedS.S. MarwanA. GunzburgerY. RenaudV. 3D Numerical Simulation of the Goaf Due to Large-Scale Longwall Mining International Congress and Exhibition “Sustainable Civil Infrastructures: Innovative Infrastructure Geotechnology” GeoMEast 2017: Numerical Analysis of Nonlinear Coupled Problems 121 131 2017 10.1007/978-3-319-61905-7_11 Search in Google Scholar

M. Cała, Slope stability analysis with numerical methods, Monographs 171, AGH University of Science and Technology, Krakow (2007) (in Polish). CałaM. Slope stability analysis with numerical methods, Monographs 171 AGH University of Science and Technology Krakow 2007 (in Polish). Search in Google Scholar

Polecane artykuły z Trend MD

Zaplanuj zdalną konferencję ze Sciendo