O artykule
Kategoria artykułu: Original Scientific Article
Data publikacji: 29 kwi 2021
Zakres stron: 161 - 175
Otrzymano: 08 mar 2021
Przyjęty: 09 mar 2021
DOI: https://doi.org/10.2478/rmzmag-2020-0018
Słowa kluczowe
© 2021 Andreja Popit, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 1
![Location of the permanent underwater noise measurement station near Debeli Rtič in the Slovenian Sea (A) and a sketch of the lighthouse at Debeli Rtič on which the measuring equipment is installed showing the hydrophone at a depth of 4 m (sea depth at the location is 5 m) (B) [38].](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/647369dd4e662f30ba53d22f/j_rmzmag-2020-0018_fig_001.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250915%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250915T073645Z&X-Amz-Expires=3600&X-Amz-Signature=b44e2764fff39a287e67497212b29ca35fc60d5f6f06d7e60f6b8c01ecf2a0c8&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 2

Figure 3

Figure 4

Figure 5

Figure 6

Figure 7

Figure 8

Figure 9

Figure 10

Figure 11

The results of AVE and STDEV calculations of Leq,63 Hz and Leq,125 Hz, in the periods with and without the anthropogenic activity
Dredging | 26.9.2015–26.10.2015 (7:00–21:00 h) |
26.9.2015–26.10.2015 (22:00–6:00 hr) |
Cleaning of the seafloor | 18.8.2016–31.8.2016 (8:00–16:00) |
18.8.2016–31.8.2016 (17:00–7:00) |
Periods with and without the anthropogenic activity
Dredging | 26.09.2015–26.10.2015 (7:00–21:00 h) | 26.09.2015–26.10.2015 (22:00–6:00 h) |
Cleaning of the seafloor | 18.08.2016–31.08.2016 & 22.09.2016–29.09.2016 (8:00–16:00 h) | 18.08.2016–31.08.2016 & 22.09.2016–29.09.2016 (17:00–7:00 h) |
The results of asymmetry (A) calculations of Leq,63 Hz, Leq,125 Hz, ρL,2 NM, ρL,5 NM, ρL, Trieste, ρL, Venice, dredging, cleaning activity, vv and hp in different measuring periods
1.0 | 0.5 | −0.4 | 1.1 | 0.6 | |
0.2 | 0.1 | 0.0 | 0.1 | −0.1 | |
0.8 | 0.7 | 0.6 | 0.6 | 1.0 | |
−1.7 | −3.0 | 1.1 | 0.4 | 2.0 | |
−1.6 | −2.8 | 1.1 | 0.2 | 1.4 | |
−0.7 | −0.6 | 0.6 | 0.8 | 0.5 | |
1.1 | 1.2 | 0.8 | 1.1 | 2.4 | |
20.5 | 16.2 | 14.8 | 22.4 | 10.9 |
The results of AVE and STDEV calculations of Leq,63 Hz, Leq,125 Hz, ρL,2 NM, ρL,5 NM, ρL, Trieste, ρL, Venice, dredging, cleaning activity, vv and hp in different measuring periods
83.0 ± 15.1 | 82.8 ± 10.8 | 101.1 ± 6.9 | 86.7 ± 7.7 | 88.6 ± 5.7 | |
89.0 ± 13.1 | 83.9 ± 2.5 | 97.5 ± 6.8 | 85.2 ± 3.3 | 98.1 ± 3.9 | |
2 ± 2 | 3 ± 2 | 5 ± 3 | 5 ± 3 | 5 ± 3 | |
24 ± 9 | 37 ± 7 | 45 ± 6 | 52 ± 6 | 52 ± 8 | |
35 ± 13 | 50 ± 10 | 58 ± 8 | 71 ± 9 | 70 ± 11 | |
117 ± 52 | 186 ± 51 | 252 ± 53 | 246 ± 48 | 247 ± 56 | |
4.6 ± 3.3 | 4.5 ± 3.8 | 4.6 ± 2.7 | 1.8 ± 1.2 | 2.0 ± 1.6 | |
0.02 ± 0.13 | 0.04 ± 0.35 | 0.07 ± 0.61 | 0.02 ± 0.31 | 0.05 ± 0.32 |