Figure 1
![Location of the permanent underwater noise measurement station near Debeli Rtič in the Slovenian Sea (A) and a sketch of the lighthouse at Debeli Rtič on which the measuring equipment is installed showing the hydrophone at a depth of 4 m (sea depth at the location is 5 m) (B) [38].](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/647369dd4e662f30ba53d22f/j_rmzmag-2020-0018_fig_001.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250915%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250915T073341Z&X-Amz-Expires=3600&X-Amz-Signature=56ded314e3d91306d2562a244d01ed3bcdcea3b1abb004f074142e5b71175241&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 2

Figure 3

Figure 4

Figure 5

Figure 6

Figure 7

Figure 8

Figure 9

Figure 10

Figure 11

The results of AVE and STDEV calculations of Leq,63 Hz and Leq,125 Hz, in the periods with and without the anthropogenic activity
Dredging | 26.9.2015–26.10.2015 (7:00–21:00 h) |
26.9.2015–26.10.2015 (22:00–6:00 hr) |
Cleaning of the seafloor | 18.8.2016–31.8.2016 (8:00–16:00) |
18.8.2016–31.8.2016 (17:00–7:00) |
Periods with and without the anthropogenic activity
Dredging | 26.09.2015–26.10.2015 (7:00–21:00 h) | 26.09.2015–26.10.2015 (22:00–6:00 h) |
Cleaning of the seafloor | 18.08.2016–31.08.2016 & 22.09.2016–29.09.2016 (8:00–16:00 h) | 18.08.2016–31.08.2016 & 22.09.2016–29.09.2016 (17:00–7:00 h) |
The results of asymmetry (A) calculations of Leq,63 Hz, Leq,125 Hz, ρL,2 NM, ρL,5 NM, ρL, Trieste, ρL, Venice, dredging, cleaning activity, vv and hp in different measuring periods
1.0 | 0.5 | −0.4 | 1.1 | 0.6 | |
0.2 | 0.1 | 0.0 | 0.1 | −0.1 | |
0.8 | 0.7 | 0.6 | 0.6 | 1.0 | |
−1.7 | −3.0 | 1.1 | 0.4 | 2.0 | |
−1.6 | −2.8 | 1.1 | 0.2 | 1.4 | |
−0.7 | −0.6 | 0.6 | 0.8 | 0.5 | |
1.1 | 1.2 | 0.8 | 1.1 | 2.4 | |
20.5 | 16.2 | 14.8 | 22.4 | 10.9 |
The results of AVE and STDEV calculations of Leq,63 Hz, Leq,125 Hz, ρL,2 NM, ρL,5 NM, ρL, Trieste, ρL, Venice, dredging, cleaning activity, vv and hp in different measuring periods
83.0 ± 15.1 | 82.8 ± 10.8 | 101.1 ± 6.9 | 86.7 ± 7.7 | 88.6 ± 5.7 | |
89.0 ± 13.1 | 83.9 ± 2.5 | 97.5 ± 6.8 | 85.2 ± 3.3 | 98.1 ± 3.9 | |
2 ± 2 | 3 ± 2 | 5 ± 3 | 5 ± 3 | 5 ± 3 | |
24 ± 9 | 37 ± 7 | 45 ± 6 | 52 ± 6 | 52 ± 8 | |
35 ± 13 | 50 ± 10 | 58 ± 8 | 71 ± 9 | 70 ± 11 | |
117 ± 52 | 186 ± 51 | 252 ± 53 | 246 ± 48 | 247 ± 56 | |
4.6 ± 3.3 | 4.5 ± 3.8 | 4.6 ± 2.7 | 1.8 ± 1.2 | 2.0 ± 1.6 | |
0.02 ± 0.13 | 0.04 ± 0.35 | 0.07 ± 0.61 | 0.02 ± 0.31 | 0.05 ± 0.32 |