Otwarty dostęp

Study of factors affecting the performance of construction projects in AEC industry

   | 29 sty 2021

Zacytuj

Abdul Kadir, M. R., Lee, W. P., Jaafar, M. S., Sapuan, S. M., & Ali, A. A. A. (2005). Factors affecting construction labour productivity for Malaysian residential projects. Structural Survey, 23(1), pp. 42–54. doi: 10.1108/02630800510586907.Abdul KadirM. R.LeeW. P.JaafarM. S.SapuanS. M.AliA. A. A.2005Factors affecting construction labour productivity for Malaysian residential projectsStructural Survey231425410.1108/02630800510586907Open DOISearch in Google Scholar

Al-Tabtabai, H., Kartam, N., Flood, I., & Alex, A. P. (1997). Construction project control using artificial neural networks. Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM, 11(1), pp. 45–57. Available at https://www.scopus.com/inward/record.uri?eid=2-s2.0-0030649909&partnerID=40&md5=96331d-756b7156493aca6946cedc8869.Al-TabtabaiH.KartamN.FloodI.AlexA. P.1997Construction project control using artificial neural networksArtificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM1114557Available at https://www.scopus.com/inward/record.uri?eid=2-s2.0-0030649909&partnerID=40&md5=96331d-756b7156493aca6946cedc8869.10.1017/S0890060400001839Search in Google Scholar

Ameh, O., & Osegbo, E. (2011). Study of relationship between time overrun and productivity on construction sites. International Journal of Construction Supply Chain Management, 1(1), pp. 56–67. doi: 10.14424/ijcscm101011-56-67.AmehO.OsegboE.2011Study of relationship between time overrun and productivity on construction sitesInternational Journal of Construction Supply Chain Management11566710.14424/ijcscm101011-56-67Open DOISearch in Google Scholar

Apolot, R., Alinaitwe, H., & Tindiwensi, D. (2011). An investigation into the causes of delay and cost overrun in Uganda's public sector construction projects. Journal of Construction in Developing Countries. doi: 10.5121/ijcsit.2011.3406.ApolotR.AlinaitweH.TindiwensiD.2011An investigation into the causes of delay and cost overrun in Uganda's public sector construction projectsJournal of Construction in Developing Countries10.5121/ijcsit.2011.3406Open DOISearch in Google Scholar

Arditi, D., Sikangwan, P., & Tokdemir, O. B. (2002). Scheduling system for high rise building construction. Construction Management and Economics. doi: 10.1080/01446190210131647.ArditiD.SikangwanP.TokdemirO. B.2002Scheduling system for high rise building constructionConstruction Management and Economics10.1080/01446190210131647Open DOISearch in Google Scholar

Ashly Babu, M., & Kanchana, S. (2014). Role of insurance in construction and infrastructure projects. pp. 30–31. Available at: http://www.iaeme.com/MasterAdmin/UploadFolder/ROLE OF INSURANCE IN CONSTRUCTION AND INFRASTRUCTURE PROJECTS-2/ROLE OF INSURANCE IN CONSTRUCTION AND INFRASTRUCTURE PROJECTS-2.pdf.Ashly BabuM.KanchanaS.2014Role of insurance in construction and infrastructure projects3031Available at: http://www.iaeme.com/MasterAdmin/UploadFolder/ROLE OF INSURANCE IN CONSTRUCTION AND INFRASTRUCTURE PROJECTS-2/ROLE OF INSURANCE IN CONSTRUCTION AND INFRASTRUCTURE PROJECTS-2.pdf.Search in Google Scholar

Best, R. (2010). Using purchasing power parity to assess construction productivity. Australasian Journal of Construction Economics and Building, 10(4), pp. 1–10.BestR.2010Using purchasing power parity to assess construction productivityAustralasian Journal of Construction Economics and Building10411010.5130/AJCEB.v10i4.1675Search in Google Scholar

Chalker, M., & Loosemore, M. (2016). Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192–210. doi: 10.1108/ECAM-06-2015-0090.ChalkerM.LoosemoreM.2016Trust and productivity in Australian construction projects: A subcontractor perspectiveEngineering, Construction and Architectural Management23219221010.1108/ECAM-06-2015-0090Open DOISearch in Google Scholar

Chancellor, W., & Abbott, M. (2015). The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176–186. doi: 10.1080/01446193.2015.1028954.ChancellorW.AbbottM.2015The Australian construction industry: Is the shadow economy distorting productivity?Construction Management and Economics33317618610.1080/01446193.2015.1028954Open DOISearch in Google Scholar

Dai, J., Maloney, W. F., Goodrum, P., & Srinivasan, C. (2009). Latent structures of the factors affecting construction labor productivity. Journal of Construction Engineering and Management, 135(5), pp. 397–406. doi: 10.1061/(ASCE)0733-9364(2009)135:5(397).DaiJ.MaloneyW. F.GoodrumP.SrinivasanC.2009Latent structures of the factors affecting construction labor productivityJournal of Construction Engineering and Management135539740610.1061/(ASCE)0733-9364(2009)135:5(397)Open DOISearch in Google Scholar

Dallasega, P., & Rauch, E. (2017). Sustainable construction supply chains through synchronized production planning and control in engineer-to-order enterprises. Sustainability, 9(10), p. 1888. doi: 10.3390/su9101888.DallasegaP.RauchE.2017Sustainable construction supply chains through synchronized production planning and control in engineer-to-order enterprisesSustainability910188810.3390/su9101888Open DOISearch in Google Scholar

Dixit, S. (2018). Analysing Enabling Factors Affecting the On-site Productivity in Indian Construction Industry. Periodica Polytechnica Architecture. Periodica Polytechnica Budapest University of Technology and Economics, 49(2), pp. 185–193. doi: 10.3311/ppar.12710.DixitS.2018Analysing Enabling Factors Affecting the On-site Productivity in Indian Construction IndustryPeriodica Polytechnica Architecture. Periodica Polytechnica Budapest University of Technology and Economics49218519310.3311/ppar.12710Open DOISearch in Google Scholar

Dixit, S., Pandey, A. K., Mandal, S. N., & Bansal, S. (2017). A study of enabling factors affecting construction productivity: Indian scenario. International Journal of Civil Engineering and Technology, 8(6), pp. 741–758.DixitS.PandeyA. K.MandalS. N.BansalS.2017A study of enabling factors affecting construction productivity: Indian scenarioInternational Journal of Civil Engineering and Technology86741758Search in Google Scholar

Dixit, S., & Saurabh, K. (2019). Impact of Construction Productivity Attributes Over Construction Project Performance in Indian Construction Projects. Periodica Polytechnica Architecture. doi: 10.3311/PPar.12711.DixitS.SaurabhK.2019Impact of Construction Productivity Attributes Over Construction Project Performance in Indian Construction ProjectsPeriodica Polytechnica Architecture10.3311/PPar.12711Open DOISearch in Google Scholar

Dixit, S., & Sharma, K. (2019). Factors Influencing Construction Time Delay on High Rise Projects In India, in Hajdu, M. J. S.; Miklos (ed.) Creative Construction Conference 2019. Budapest University of Technology and Economics & Diamond Congress Ltd., pp. 341–346. doi: https://doi.org/10.3311/CCC2019-047.DixitS.SharmaK.2019Factors Influencing Construction Time Delay on High Rise Projects In IndiainHajduM. J. S.Miklos(ed.)Creative Construction Conference 2019Budapest University of Technology and Economics & Diamond Congress Ltd.341346doi: https://doi.org/10.3311/CCC2019-04710.3311/CCC2019-047Search in Google Scholar

Doloi, H. (2008). Application of AHP in improving construction productivity from a management perspective. ConstructionManagement and Economics, 26(8), pp. 839–852. doi: 10.1080/01446190802244789.DoloiH.2008Application of AHP in improving construction productivity from a management perspectiveConstruction Management and Economics26883985210.1080/01446190802244789Open DOISearch in Google Scholar

El-Gohary, K. M., Aziz, R. F., & Abdel-Khalek, H. A. (2017). Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8), p. 04017045. doi: 10.1061/(ASCE)CO.1943-7862.0001340.El-GoharyK. M.AzizR. F.Abdel-KhalekH. A.2017Engineering approach using ANN to improve and predict construction labor productivity under different influencesJournal of Construction Engineering and Management14380401704510.1061/(ASCE)CO.1943-7862.0001340Open DOISearch in Google Scholar

Hajdu, M. (2015). History and some latest developments of precedence diagramming method. Organization, Technology & Management in Construction: An International Journal, 7(2), pp. 1302–1314. doi: 10.5592/otmcj.2015.2.5.HajduM.2015History and some latest developments of precedence diagramming methodOrganization, Technology & Management in Construction: An International Journal721302131410.5592/otmcj.2015.2.5Open DOISearch in Google Scholar

Isaac, S., & Hajdu, M. (2016). The possibilities for better project tracking based on the new developments of the precedence diagramming method. Procedia Engineering, 164(June), pp. 75–81. doi: 10.1016/j.proeng.2016.11.594.IsaacS.HajduM.2016The possibilities for better project tracking based on the new developments of the precedence diagramming methodProcedia Engineering164June758110.1016/j.proeng.2016.11.594Open DOISearch in Google Scholar

Jarkas, A. M. (2015). Factors influencing labour productivity in Bahrain's construction industry, International Journal of Construction Management, 15(1), pp. 94–108. doi: 10.1080/15623599.2015.1012143.JarkasA. M.2015Factors influencing labour productivity in Bahrain's construction industryInternational Journal of Construction Management1519410810.1080/15623599.2015.1012143Open DOISearch in Google Scholar

Jarkas, A. M., & Horner, R. M. W. (2015). Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625–639. doi: 10.1080/01446193.2015.1085651.JarkasA. M.HornerR. M. W.2015Creating a baseline for labour productivity of reinforced concrete building construction in KuwaitConstruction Management and Economics33862563910.1080/01446193.2015.1085651Open DOISearch in Google Scholar

Jarkas, A. M., Kadri, C. Y., & Younes, J. H. (2012). A survey of factors influencing the productivity of construction operatives in the state of Qatar. International Journal of Construction Management, 12(3), pp. 1–23. doi: 10.1080/15623599.2012.10773192.JarkasA. M.KadriC. Y.YounesJ. H.2012A survey of factors influencing the productivity of construction operatives in the state of QatarInternational Journal of Construction Management12312310.1080/15623599.2012.10773192Open DOISearch in Google Scholar

Jayasudha, K., & Vidivelli, B. (2016). Analysis of major risks in construction projects. ARPN Journal of Engineering and Applied Sciences, 11(11), pp. 6943–6950.JayasudhaK.VidivelliB.2016Analysis of major risks in construction projectsARPN Journal of Engineering and Applied Sciences111169436950Search in Google Scholar

Kadry, M., Osman, H., & Georgy, M. (2016). Causes of Construction Delays in Countries with High Geopolitical Risks. Journal of Construction Engineering and Management. doi: 10.1061/(asce)co.1943-7862.0001222KadryM.OsmanH.GeorgyM.2016Causes of Construction Delays in Countries with High Geopolitical RisksJournal of Construction Engineering and Management10.1061/(asce)co.1943-7862.0001222Open DOISearch in Google Scholar

Kirmani, S. S. (1988). ‘The Construction Industry in Development Issues and Options’, p. 30. Available at: http://www-wds.worldbank.org/servlet/WDSContentServer/IW3P/IB/2003/05/17/000178830_98101902153676/Rendered/PDF/multi0page.pdf.KirmaniS. S.1988‘The Construction Industry in Development Issues and Options’30Available at: http://www-wds.worldbank.org/servlet/WDSContentServer/IW3P/IB/2003/05/17/000178830_98101902153676/Rendered/PDF/multi0page.pdf.Search in Google Scholar

Kwon, S., Ahn, D., Lee, G., & Park, H.-S. (2014). A modified-AHP method of productivity analysis for deployment of innovative construction tools on construction site. (August), pp. 45–50. doi: 10.6106/JCEPM.2014.4.1.045.KwonS.AhnD.LeeG.ParkH.-S.2014A modified-AHP method of productivity analysis for deployment of innovative construction tools on construction siteAugust455010.6106/JCEPM.2014.4.1.045Open DOISearch in Google Scholar

Lee, E.-B., Lee, H., & Ibbs, C. W. (2007). Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798–806. doi: 10.1061/(ASCE)0733-9364(2007)133:10(798).LeeE.-B.LeeH.IbbsC. W.2007Productivity aspects of urban freeway rehabilitation with accelerated constructionJournal of Construction Engineering and Management1331079880610.1061/(ASCE)0733-9364(2007)133:10(798)Open DOISearch in Google Scholar

Mani, N., Kisi, K. P., Rojas, E. M., & Foster, E. T. (2017). Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10), p. 04017077. doi: 10.1061/(ASCE)CO.1943-7862.0001390.ManiN.KisiK. P.RojasE. M.FosterE. T.2017Estimating construction labor productivity frontier: Pilot studyJournal of Construction Engineering and Management143100401707710.1061/(ASCE)CO.1943-7862.0001390Open DOISearch in Google Scholar

McKinsey and Company. (2010). India's urban awakening: Building inclusive cities, sustaining economic growth. McKinsey Quarterly, (April), pp. 1–33. Available at http://www.mckinsey.com/~/media/McKinsey/GlobalThemes/Urbanization/UrbanawakeninginIndia/MGI_Indias_urban_awakening_full_report.ashx.McKinsey and Company2010India's urban awakening: Building inclusive cities, sustaining economic growthMcKinsey QuarterlyApril133Available at http://www.mckinsey.com/~/media/McKinsey/GlobalThemes/Urbanization/UrbanawakeninginIndia/MGI_Indias_urban_awakening_full_report.ashx.Search in Google Scholar

Molavi, J., & Barral, D. L. (2016). A construction procurement method to achieve sustainability in modular construction. Procedia Engineering, 145, pp. 1362–1369. doi: 10.1016/j.proeng.2016.04.201.MolaviJ.BarralD. L.2016A construction procurement method to achieve sustainability in modular constructionProcedia Engineering1451362136910.1016/j.proeng.2016.04.201Open DOISearch in Google Scholar

Moselhi, O., & Khan, Z. (2012). Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272–296. doi: 10.1108/14714171211244541.MoselhiO.KhanZ.2012Significance ranking of parameters impacting construction labour productivityConstruction Innovation12327229610.1108/14714171211244541Open DOISearch in Google Scholar

Ogunbiyi, O., Goulding, J. S., & Oladapo, A. (2014). An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88–107. doi: 10.1108/CI-08-2012-0045.OgunbiyiO.GouldingJ. S.OladapoA.2014An empirical study of the impact of lean construction techniques on sustainable construction in the UKConstruction Innovation1418810710.1108/CI-08-2012-0045Open DOISearch in Google Scholar

Panas, A., & Pantouvakis, J.-P. (2015). Efficiency multipliers for construction productivity: A comparative evaluation. Organization, Technology and Management in Construction an International Journal, 7(1), pp. 1186–1196. doi: 10.5592/otmcj.2015.1.3.PanasA.PantouvakisJ.-P.2015Efficiency multipliers for construction productivity: A comparative evaluationOrganization, Technology and Management in Construction an International Journal711186119610.5592/otmcj.2015.1.3Open DOISearch in Google Scholar

Parida, R., & Ray, P. K. (2015). Factors influencing construction ergonomic performance in India. Procedia Manufacturing, 3, pp. 6587–6592. doi: 10.1016/j.promfg.2015.07.284.ParidaR.RayP. K.2015Factors influencing construction ergonomic performance in IndiaProcedia Manufacturing36587659210.1016/j.promfg.2015.07.284Open DOISearch in Google Scholar

Pheng, L. S., Shang, G., & Foong, W. K. (2016). Enhancing construction productivity through organizational learning in the Singapore construction industry. International Journal of Construction Project Management, 8(1), pp. 71–89. Available at https://search.proquest.com/docview/1842450206?accountid=26636%5Cnhttp://link.periodicos.capes.gov.br/sfxlcl41?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Aengineeringjournals&atitle=ENHANCING+CONSTRUCTION+PRO.PhengL. S.ShangG.FoongW. K.2016Enhancing construction productivity through organizational learning in the Singapore construction industryInternational Journal of Construction Project Management817189Available at https://search.proquest.com/docview/1842450206?accountid=26636%5Cnhttp://link.periodicos.capes.gov.br/sfxlcl41?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Aengineeringjournals&atitle=ENHANCING+CONSTRUCTION+PRO.Search in Google Scholar

Sapuay, S. E. (2016). Construction waste – Potentials and constraints. Procedia Environmental Sciences, 35, pp. 714–722. doi: 10.1016/j.proenv.2016.07.074.SapuayS. E.2016Construction waste – Potentials and constraintsProcedia Environmental Sciences3571472210.1016/j.proenv.2016.07.074Open DOISearch in Google Scholar

Sezer, A. A. (2015). Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141–153. doi: 10.1108/BEPAM-11-2013-0065.SezerA. A.2015Contractor use of productivity and sustainability indicators for building refurbishmentBuilt Environment Project and Asset Management5214115310.1108/BEPAM-11-2013-0065Open DOISearch in Google Scholar

Shah, M. N., Dixit, S., Kumar, R., Jain, R., & Anand, K. (2019). Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, pp. 1–16. doi: 10.1080/15623599.2018.1560546.ShahM. N.DixitS.KumarR.JainR.AnandK.2019Causes of delays in slum reconstruction projects in IndiaInternational Journal of Construction Management11610.1080/15623599.2018.1560546Open DOISearch in Google Scholar

Singh, S., Dixit, S., & Varshney, D. (2018). Sustainable construction management in education sector. International Journal of Engineering & Technology, 7(2), pp. 300–304. doi: 10.14419/ijet.v7i2.9565.SinghS.DixitS.VarshneyD.2018Sustainable construction management in education sectorInternational Journal of Engineering & Technology7230030410.14419/ijet.v7i2.9565Open DOISearch in Google Scholar

Zhai, D., Goodrum, P., Haas, C., & Caldas, C. (2009). Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746–753. doi: 10.1061/(ASCE)CO.1943-7862.0000024.ZhaiD.GoodrumP.HaasC.CaldasC.2009Relationship between automation and integration of construction information systems and labor productivityJournal of Construction Engineering and Management135874675310.1061/(ASCE)CO.1943-7862.0000024Open DOISearch in Google Scholar

eISSN:
1847-6228
Język:
Angielski
Częstotliwość wydawania:
Volume Open
Dziedziny czasopisma:
Engineering, Introductions and Overviews, other