Otwarty dostęp

Modified Resource-Constrained Project Scheduling to Minimize Idle Time for Banbury Mixing Process: A Case Study in the Tire Manufacturing Industry


Zacytuj

F. Habibi, F. Barzinpour, S.J. Sadjadi, “Resource-constrained project scheduling problem: review of past and recent developments,” Journal of Project Management, vol. 3, pp. 55-88, Jan. 2018. Search in Google Scholar

S.B. Issa, Y. Tu, “A survey in the resource-constrained project and multi-project scheduling problems,” Journal of Project Management, vol. 5, pp. 117-138, Jan. 2020. Search in Google Scholar

M.G. Sánchez, E. Lalla-Ruiz, A.F. Gil, C. Castro, “Resource-constrained multi-project scheduling problem: A survey,” European Journal of Operational Research, vol. 1, pp. 1-19, Sep. 2022. Search in Google Scholar

H.D. Ardakani, A. Dehghani, “Multi-objective optimization of multi–mode resource-constrained project selection and scheduling problem considering resource leveling and time-varying resource usage,” International Journal of Supply and Operations Management, vol. 9, pp. 34-55, Jan. 2022. Search in Google Scholar

U. Satic, P. Jacko, C. Kirkbride, “Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem,” International Journal of Production Research, vol. 60, pp. 1411-1423, Jan. 2022. Search in Google Scholar

S. Creemers, “Minimizing the expected makespan of a project with stochastic activity durations under resource constraints,” Journal of Scheduling, vol. 18, pp. 263-273, Mar. 2015. Search in Google Scholar

J.F. Gonçalves, J.J. de Magalhães Mendes, M.G. Resende, “The basic multi-project scheduling problem,” In Handbook on project management and scheduling, 1st ed., vol. 2, Springer, 2015, pp. 667-683. Search in Google Scholar

J. Chen, J. Zhu, D. Zhang, “Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient,” in International conference on management science & engineering 21th annual conference proceedings, 2014, pp. 1012-1018. Search in Google Scholar

S. Xin, Q. Su, Q. Wang, Q., Wang, “Optimization of resource-constrained multi project scheduling problem based on the genetic algorithm,” in ICSSSM, 2018, pp. 1-6. Search in Google Scholar

H. Zhu, Z. Lu, X. Hu, “A modified heuristic algorithm for resource constrained multi-project scheduling problem based on inspection and rework,” in CASE, 2018, pp. 1058-1063. Search in Google Scholar

A. Ahmeti, N. Musliu, “Hybridizing constraint programming and meta-heuristics for multi-mode resource-constrained multiple projects scheduling problem,” in PATAT, 2021, pp. 188-206. Search in Google Scholar

J.A. Araujo, H.G. Santos, B. Gendron, S.D. Jena, S.S. Brito, D.S. Souza, “Strong bounds for resource constrained project scheduling: Preprocessing and cutting planes,” Computers & Operations Research, vol. 113, 104782, Jan. 2020. Search in Google Scholar

J. Dumond, “In a multi-resource environment, how much is enough?,” International Journal of Production Research, vol. 30, pp. 395-410, Oct. 1992. Search in Google Scholar

J. Dumond, V. A. Mabert, “Evaluating project scheduling and due date assignment procedures: An experimental analysis,” Management Science, vol. 34, pp. 101-118, Jan. 1988. Search in Google Scholar

R. Van Eynde, M. Vanhoucke, “Resource-constrained multi-project scheduling: Benchmark datasets and decoupled scheduling,” Journal of Scheduling, vol. 23, pp. 301-325, Jan. 2020. Search in Google Scholar

H. Chen, G. Ding, J. Zhang, S. Qin, “Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival,” Computers & Industrial Engineering, vol. 137, pp. 174-186, Jan. 2019. Search in Google Scholar

H. Zhu, Z. Lu, C. Lu, Y. Ren, “Modeling and algorithm for resource-constrained multi-project scheduling problem based on detection and rework,” Assembly Automation, vol. 41, pp. 174-186, Jan. 2021. Search in Google Scholar

F. Li, Z. Xu, H. Li, “A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation,” Computers & Industrial Engineering, vol. 151, pp. 174-186, Jan. 2021. Search in Google Scholar

D. Liu, Z. Xu, “A multi-PR heuristic for distributed multi-project scheduling with uncertain duration,” IEEE Access, vol. 8, pp. 227780-227792, Jan. 2020. Search in Google Scholar

X. Zhu, R. Ruiz, S. Li, X. Li, “An effective heuristic for project scheduling with resource availability cost,” European Journal of Operational Research, vol. 257, no. 3, pp. 746-762, Mar. 2017. Search in Google Scholar

M. Tritschler, A. Naber, R. Kolisch, “A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles,” European Journal of Operational Research, vol. 262, no. 1, pp. 262-273, Mar. 2017. Search in Google Scholar

S. Rostami, S. Creemers, R. Leus, “New strategies for stochastic resource-constrained project scheduling,” Journal of Scheduling, vol. 21, pp. 1-17, Dec. 2017. Search in Google Scholar

H. Davari Ardakani, A. Dehghani, “Multi-objective optimization of multi–mode resource-constrained project selection and scheduling problem considering resource leveling and time-varying resource usage,” International Journal of Supply and Operations Management, vol. 9, pp. 34-55, Jan. 2022. Search in Google Scholar

C.-B. Cheng, C.-Y. Lo, C.-P. Chu, “Solving multi-mode resource-constrained multi-project scheduling problem with combinatorial auction mechanisms,” International Journal of Information and Management Sciences, vol. 30, pp. 143-167, Jan. 2019 Search in Google Scholar

M. Van Den Eeckhout, M. Vanhoucke, B. Maenhout, “A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing,” Computers & Operations Research, vol. 128, 105163, Apr. 2021. Search in Google Scholar

S. Gholizadeh-Tayyar, L. Dupont, J. Lamothe, M. Falcon, “Modeling a generalized resource constrained multi project scheduling problem integrated with a forward-backward supply chain planning,” IFAC-PapersOnLine, vol. 49, pp. 1283-1288, Jan. 2016. Search in Google Scholar

W. Hu, H. Wang, C. Peng, H. Wang, H. Liang, B. Du, “An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem,” Soft Computing, vol. 19, pp. 2111-2132, Jan. 2015. Search in Google Scholar

X. Wang, Q. Chen, N. Mao, X. Chen, Z. Li, “Proactive approach for stochastic RCMPSP based on multi-priority rule combinations,” International Journal of Production Research, vol. 53, pp. 1098-1110, Jan. 2015. Search in Google Scholar

H. Amirian, R. Sahraeian, “Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm,” Computers & Industrial Engineering, vol. 107, pp. 141-149, Jan. 2017. Search in Google Scholar

J. Tian, X. Dong, S. Han, “Optimizing for a resource-constrained multi-project scheduling problem with planned resource unavailability,” in MSAM, 2018, pp. 243-248. Search in Google Scholar