Zacytuj

[1] R. Ulewicz, D. Jelonek, and M. Mazur, “Implementation of logic flow in planning and production control,” Manag. Prod. Eng. Rev., vol. 7, no. 1, pp. 89-94, Mar. 2016.10.1515/mper-2016-0010 Search in Google Scholar

[2] K. Knop, “Importance of visual management in metal and automotive branch and its influence in building a competitive advantage,” Polish J. Manag. Stud., vol. 22, no. 1, pp. 263-278, Dec. 2020.10.17512/pjms.2020.22.1.17 Search in Google Scholar

[3] N. Baryshnikova, O. Kiriliuk, and D. Klimecka-Tatar, “Enterprises’ strategies transformation in the real sector of the economy in the context of the COVID-19 pandemic,” Prod. Eng. Arch., vol. 27, no. 1, pp. 8-15, Mar. 2021.10.30657/pea.2021.27.2 Search in Google Scholar

[4] I. Belekoukias, J. A. Garza-Reyes, and V. Kumar, “The impact of lean methods and tools on the operational performance of manufacturing organisations,” Int. J. Prod. Res., vol. 52, no. 18, pp. 5346-5366, Sep. 2014. Search in Google Scholar

[5] A. Maszke, R. Dwornicka, and R. Ulewicz, “Problems in the implementation of the lean concept at a steel works – Case study,” in MATEC Web of Conferences, 2018, vol. 183.10.1051/matecconf/201818301014 Search in Google Scholar

[6] M. Nowicka-Skowron and R. Ulewicz, “Problems in the implementation of lean concept in the metal industry companies,” in METAL 2016. 25th Anniversary International Conference on Metallurgy and Materials, Conference Proceedings, 2016, pp. 1962-1967. Search in Google Scholar

[7] S. Sadiq, M. S. Amjad, M. Z. Rafique, S. Hussain, U. Yasmeen, and M. A. Khan, “An integrated framework for lean manufacturing in relation with blue ocean manufacturing – A case study,” J. Clean. Prod., vol. 279, Jan. 2021.10.1016/j.jclepro.2020.123790 Search in Google Scholar

[8] A. Purwanto et al., “Lean six sigma model for pharmacy manufacturing: Yesterday, today and tomorrow,” Syst. Rev. Pharm., vol. 11, no. 8, pp. 304-313, Sep. 2020. Search in Google Scholar

[9] R. Ulewicz and R. Kucȩba, “Identification of problems of implementation of Lean concept in the SME sector,” Eng. Manag. Prod. Serv., vol. 8, no. 1, pp. 19-25, 2016.10.1515/emj-2016-0002 Search in Google Scholar

[10] S. Singh and K. Kumar, “Review of literature of lean construction and lean tools using systematic literature review technique (2008-2018),” Ain Shams Engineering Journal, vol. 11, no. 2. Ain Shams University, pp. 465-471, 01-Jun-2020.10.1016/j.asej.2019.08.012 Search in Google Scholar

[11] D. Siwiec and A. Pacana, “Method of improve the level of product quality,” Prod. Eng. Arch., vol. 27, no. 1, pp. 1-7, Mar. 2021.10.30657/pea.2021.27.1 Search in Google Scholar

[12] A. Pacana, “Comprehensive Improvement Of The Surface Quality Of The Diesel Engine Piston,” Hrvatsko Metalursko Društvo (HMD), Jul. 2019. Search in Google Scholar

[13] O. P. Maslova, T. A. Ilyina, V. A. Krichmar, and E. G. Safronov, “Implementing lean manufacturing and solving motivation problems in russian companies,” in Lecture Notes in Networks and Systems, vol. 139, Springer, 2021, pp. 384-391.10.1007/978-3-030-53277-2_46 Search in Google Scholar

[14] I. Leksic, N. Stefanic, and I. Veza, “The impact of using different lean manufacturing tools on waste reduction,” Adv. Prod. Eng. Manag., vol. 15, no. 1, pp. 81-92, Mar. 2020.10.14743/apem2020.1.351 Search in Google Scholar

[15] T. A. Tran, K. Luu-Nhan, R. Ghabour, and M. Daroczi, “The use of Lean Six-Sigma tools in the improvement of a manufacturing company – Case study,” Prod. Eng. Arch., vol. 26, no. 1, pp. 30-35, Mar. 2020.10.30657/pea.2020.26.07 Search in Google Scholar

[16] B. Zhang, Z. Niu, and C. Liu, “Lean tools, knowledge management, and lean sustainability: The moderating effects of study conventions,” Sustain., vol. 12, no. 3, p. 956, Feb. 2020.10.3390/su12030956 Search in Google Scholar

[17] M. Mazur and H. Momeni, “LEAN Production issues in the organization of the company – results,” Prod. Eng. Arch., vol. 22, no. 22, pp. 50-53, Mar. 2019.10.30657/pea.2019.22.10 Search in Google Scholar

[18] M. Mazur and H. Momeni, “LEAN Production issues in the organization of the company – the first stage,” Prod. Eng. Arch., vol. 21, no. 21, pp. 36-39, Dec. 2018.10.30657/pea.2018.21.08 Search in Google Scholar

[19] A. C. Gavriluţă, E. L. Niţu, and C. A. Gavriluţă, “Algorithm to Use Some Specific Lean Manufacturing Methods: Application in an Industrial Production Process,” Processes, vol. 9, no. 4, p. 641, Apr. 2021.10.3390/pr9040641 Search in Google Scholar

[20] D. Kleszcz, “Assessment of application of 5S practices in ceramic industry,” Prod. Eng. Arch., vol. 16, no. 16, pp. 47-51, Sep. 2017.10.30657/pea.2017.16.10 Search in Google Scholar

[21] D. Klimecka-Tatar, “Context of production engineering in management model of Value Stream Flow according to manufacturing industry,” Prod. Eng. Arch., vol. 21, no. 21, pp. 32-35, Dec. 2018.10.30657/pea.2018.21.07 Search in Google Scholar

[22] D. Kleszcz, “Barriers and opportunities in implementation of Lean Manufacturing tools in the ceramic industry,” Prod. Eng. Arch., vol. 19, no. 19, pp. 48-52, Jun. 2018.10.30657/pea.2018.19.10 Search in Google Scholar

[23] S. Taj, “Lean manufacturing performance in China: Assessment of 65 manufacturing plants,” J. Manuf. Technol. Manag., vol. 19, no. 2, pp. 217-234, 2008.10.1108/17410380810847927 Search in Google Scholar

[24] B. Haque and M. James-Moore, “Applying Lean Thinking to new product introduction,” Journal of Engineering Design, vol. 15, no. 1. pp. 1-31, Feb-2004.10.1080/0954482031000150125 Search in Google Scholar

[25] M. Holweg, “The genealogy of lean production,” J. Oper. Manag., vol. 25, no. 2, pp. 420-437, Mar. 2007.10.1016/j.jom.2006.04.001 Search in Google Scholar

[26] J. Bhamu, J. V. S. Kumar, and K. S. Sangwan, “Productivity and quality improvement through value stream mapping: A case study of Indian automotive industry,” Int. J. Product. Qual. Manag., vol. 10, no. 3, pp. 288-306, 2012.10.1504/IJPQM.2012.048751 Search in Google Scholar

[27] E. Järvenpää and M. Lanz, “Lean Manufacturing and Sustainable Development,” 2019, pp. 1-10.10.1007/978-3-319-71062-4_7-1 Search in Google Scholar

[28] R. Shah and P. T. Ward, “Lean manufacturing: Context, practice bundles, and performance,” J. Oper. Manag., vol. 21, no. 2, pp. 129-149, Mar. 2003.10.1016/S0272-6963(02)00108-0 Search in Google Scholar

[29] T. Melton, “The benefits of lean manufacturing: What lean thinking has to offer the process industries,” Chem. Eng. Res. Des., vol. 83, no. 6 A, pp. 662-673, 2005.10.1205/cherd.04351 Search in Google Scholar

[30] M. G. Yang, P. Hong, and S. B. Modi, “Impact of lean manufacturing and environmental management on business performance: An empirical study of manufacturing firms,” Int. J. Prod. Econ., vol. 129, no. 2, pp. 251-261, Feb. 2011.10.1016/j.ijpe.2010.10.017 Search in Google Scholar

[31] S. J. Pavnaskar, J. K. Gershenson, and A. B. Jambekar, “Classification scheme for lean manufacturing tools,” Int. J. Prod. Res., vol. 41, no. 13, pp. 3075-3090, Sep. 2003. Search in Google Scholar

[32] T. Bonavia and J. A. Marin, “An empirical study of lean production in the ceramic tile industry in Spain,” Int. J. Oper. Prod. Manag., vol. 26, no. 5, pp. 505-531, 2006.10.1108/01443570610659883 Search in Google Scholar

[33] D. Kleszcz, M. Zasadzień, and R. Ulewicz, “Lean Manufacturing in the ceramic industry,” Multidiscip. Asp. Prod. Eng., vol. 2, no. 1, pp. 457-466, Sep. 2019.10.2478/mape-2019-0046 Search in Google Scholar

[34] R. Ulewicz and M. Ulewicz, “Problems in the Implementation of the Lean Concept in the Construction Industries,” in Lecture Notes in Civil Engineering, vol. 47, Springer, 2020, pp. 495-500.10.1007/978-3-030-27011-7_63 Search in Google Scholar

[35] K. Babu, A. Thirugnanam, and S. P. Sivam, “Lean process management implementation in ceramic industry,” Int. J. Chem. Sci., vol. 14, pp. 415-430, 2016. Search in Google Scholar