Zacytuj

Abdalla, S., Apramian, S. S., Cantley, L. F., & Cullen, M. R. (2017). Occupation and risk for injuries. In C. N. Mock, R. Nugent, O. Kobusingye & K. R Smith (Eds.), Injury Prevention and Environmental Health (3rd ed., pp. 97-132). The International Bank for Reconstruction and Development. https://doi.org/10.1596/978-1-4648-0522-6_ch6.Search in Google Scholar

Ahmadisheykhsarmast, S., & Sonmez, R. (2020). A smart contract system for security of payment of construction contracts. Automation in Construction, 120(December), 103401. https://doi.org/10.1016/j.autcon.2020.103401Search in Google Scholar

Aje, I. O., Olatunji, A. O., &. Olalusi, A. O. (2017). Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), 86-98. https://doi.org/10.1108/BEPAM-06-2015-0028Search in Google Scholar

Ajslev, J. Z. N., Persson, R., & Andersen, L. L. (2015). Associations between wage system and risk factors for musculoskeletal disorders among construction workers. Pain Research and Treatment, 11, 513903. https://doi.org/10.1155/2015/513903Search in Google Scholar

Alinaitwe, H., Mwakali, J. A., & Hansson, B. (2007). Analysis of accidents on building construction sites reported in Uganda during 2001-2005. In Proceedings of the CIB World Building Congress (pp. 1208-1221). CIB World Building Congress. https://kipdf.com/analysis-of-accidents-on-building-construction-sites-reported-in-uganda-during_5aca03b71723dd217d846c8a.htmlSearch in Google Scholar

Almén, L., Larsson, T. J., & Thunqvist, E. (2012). The influence of the designer on the risk of falling from heights and of exposure to excessive workloads on two construction sites. Safety Science Monitor, 16(1), 1-7.Search in Google Scholar

Anderson, L. P. S., & Grytnes, R. (2021). Different ways of perceiving risk and safety on construction sites and implications for safety cooperation. Construction Management and Economics, 39(5), 419-43. https://doi.org/10.1080/01446193.2021.1904516Search in Google Scholar

Ansah, S. K. (2011). Causes and effects of delayed payments by clients on construction projects in Ghana. Journal of Construction Project Management and Innovation, 1(1), 27-45. https://doi.org/10.36615/jcpm.v1i1.12Search in Google Scholar

Bahamid, R. A., & Doh, S. I. (2017). A review of risk management process in construction projects of developing countries. IOP Conference Series: Materials Science and Engineering, 271, 012042. http://dx.doi.org/10.1088/1757-899X/271/1/012042.10.1088/1757-899X/271/1/012042Search in Google Scholar

Bake, P. B., & Makinde, J. K. (2021). Payment methods and productivity of construction site workers: a review. In Proceedings of the Academic Conference on Exploring the Sub-Sahara Africa Resources and Opportunities for Sustainable Development in 21st Century (Vol. 12, pp. 71-87). ASUU Conference Hall University of Jos.Search in Google Scholar

Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. In N. Banaitiene (Ed.), Risk Management - Current Issues and Challenges (pp. 429-448). IntechOpen. http://dx.doi.org/10.5772/5146010.5772/51460Search in Google Scholar

Baradan, S., & Usmen, M. A. (2006). Comparative injury and fatality risk analysis of building trades. Journal of Construction Engineering and Management, 132(5), 533-539. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(533)Search in Google Scholar

Bender, K. A., Green, C. P., & Heywood, J. S. (2012). Piece rates and workplace injury: does survey evidence support Adam Smith? Journal of Population Economics, 25(April), 569–590. https://doi.org/10.1007/s00148-011-0393-5Search in Google Scholar

Berends, T., & Dhillon, J. (2004). An analysis of contract cost phasing on engineering and construction projects. The Engineering Economist, 49(4), 327-337. https://doi.org/10.1080/00137910490888075Search in Google Scholar

Bujang, M. A., Sa’at, N., & Tg Abu Bakar Sidik, T. M. I. (2017). Determination of minimum sample size requirement for multiple linear regression and analysis of covariance based on experimental and non-experimental studies. Epidemiology Biostatistics and Public Health, 14(3), e12117-1-e12117-9. https://doi.org/10.2427/12117Search in Google Scholar

Bureau of Labour Statistics. (2009). Incidence rate for nonfatal occupational injuries and illnesses. https://www.bls.gov/iif/oshwc/osh/case/ostb2454.pdfSearch in Google Scholar

Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., Yeung, J. F. Y., & Chan, J. H. L. (2011). Risk ranking and analysis in target cost contracts: empirical evidence from the construction industry. International Journal of Project Management, 29(6), 751-763. https://doi.org/10.1016/j.ijproman.2010.08.003Search in Google Scholar

Choi, S. D. (2015). Aging workers and trade-related injuries in the US construction industry. Safety and Health at Work, 6(1), 151-155. https://dx.doi.org/10.1016/j.shaw.2015.02.00210.1016/j.shaw.2015.02.002Search in Google Scholar

de los Pinos, C., José, A., García, G., & de las Nieves, M. (2017). Critical analysis of risk assessment methods applied to construction works. Revista de la Construcción, 16(1), 104-114. https://doi.org/10.7764/RDLC.16.1.104Search in Google Scholar

Designing Buildings. (2020). Construction operations definition. https://www.designingbuildings.co.uk/wiki/Construction_operations_definitionSearch in Google Scholar

Ding, J., Zhai, W., Wang, Z., Zhang, K., & Cai, J. (2019). Modelling and design analysis of contract payment methods in civil engineering projects. In IOP Conference Series: Earth and Environmental Science (Vol. 304, No. 3, p. 032001). IOP Publishing. https://doi.org/10.1088/1755-1315/304/3/032001Search in Google Scholar

European Bank for Reconstruction and Development. (2010). Sub-sectoral environmental and social guidelines: Building and construction activities. https://www.ebrd.com/downloads/policies/environmental/construction/buidling.pdfSearch in Google Scholar

Forteza, F. J., Carretero-Gómez, J. M., & Sesé, A. (2020). Safety in the construction industry: accidents and precursors. Revisita de la Construcción, 19(2), 271-281. https://dx.doi.org/10.7764/rdlc.19.2.27110.7764/rdlc.19.2.271-281Search in Google Scholar

Gadd, S. A., Keeley, D. M., & Balmforth, H. F. (2004). Pitfalls in risk assessment: examples from the UK. Safety Science, 42(9), 841–857. https://doi.org/10.1016/j.ssci.2004.03.003Search in Google Scholar

Fick, G., Cackler, E. T., Trost, S., & Vanzler, L. (2010). Time-related incentive and disincentive provisions in highway construction projects. NCHRP Report, 652. Transportation Research Board. https://doi.org/10.17226/14392Search in Google Scholar

Henriod, E. E., & Lantran, J. M. (2000). Trends in contracting practice for civil works. Site Resources, World Bank, New York, 1(9). https://siteresources.worldbank.org/INTROADSHIGHWAYS/Resources/3389931122496826968/cn_ntk2b.pdfSearch in Google Scholar

Jeong, G., Kim, H., Lee, H. S., Park, M., & Hyun, H. (2022). Analysis of safety risk factors of modular construction to identify accident trends. Journal of Asian Architecture and Building Engineering, 21(3), 1040-1052. https://doi.org/10.1080/13467581.2021.1877141Search in Google Scholar

Johansson, B., Rask, K., & Stenberg, M. (2010). Piece rates and their effects on health and safety: a literature review. Applied Ergonomics, 41(4), 607–614. https://doi.org/10.1016/j.apergo.2009.12.020Search in Google Scholar

Judi, S. S., & Abdul-Rashid, R. (2010). Contractor’s right of action for late or non-payment by the employer. Journal of Surveying, Construction and Property, 1(1), 1-31. https://doi.org/10.22452/jscp.vol1no1.4Search in Google Scholar

Kaim, O. F., Alabi, A. M., & Wusu, S. (2020). Risk assessment for hazard exposure and its consequences on housing construction sites in Lagos Nigeria. Acta Structilia, 27(1), 59-84. https://doi.org/10.18820/24150487/as27i1.3Search in Google Scholar

Kaka, A., Wong, C., Fortune, C., & Langford, D. (2008). Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(1), 66-77. https://doi.org/10.1108/09699980810842070Search in Google Scholar

Kaka, A.P., & Lewis, J. (2003). Development of a company-level dynamic cash flow forecasting model (DYCAFF). Construction Management and Economics, 21(7) 693-705. https://doi.org/10.1080/0144619032000116561Search in Google Scholar

Kang, Y., Siddiqui, S., Suk, S.J., Chi, S., & Kim, C. (2017). Trends of fall accidents in the U.S. construction industry. Journal of Construction Engineering and Management, 143(8), 04017043. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001332Search in Google Scholar

Kazimu, M. A. (2012). Significant factors that cause cost overrun in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 391(1), 775-780.Search in Google Scholar

Kozlovská, M., & Struková, Z. (2012). Overview of safety risk perception in construction. Journal of Civil Engineering and Architecture, 6(2), 211–218.10.17265/1934-7359/2012.02.010Search in Google Scholar

Li, R. Y. M., Chau, K. W., & Zeng, F. F. (2019). Ranking of risks for existing and new building works. Sustainability, 11(10), 2863. https://doi.org/10.3390/su11102863Search in Google Scholar

Liu, H., Li, J., Li, H., Li, H., Mao, P., & Yuan, J. (2021). Risk perception and coping behaviour of construction workers on occupational health risks: a case study of Nanjing, China. International Journal of Environmental Research and Public Health, 18(13), 7040. https://doi.org/10.3390/ijerph18137040Search in Google Scholar

Luo, H., Das, M., Wang, J., & Cheng, J. C. (2019). Construction payment automation through smart contract-based blockchain framework. In Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 36, pp. 1254-1260). ISARC Publications.10.22260/ISARC2019/0168Search in Google Scholar

Mamman, J., Mohammed, Y. D., Shittu, A. A., & Adamu, A. D. (2021, May 25-27). Risk Assessment of Safety for Building Construction Projects in Abuja, Nigeria [Paper presentation]. School of Environmental Technology Conference (SETIC), Federal University of Technology, Minna, Nigeria.Search in Google Scholar

Mbachu, J. (2011). Sources of contractor’s payment risks and cash flow problems in the New Zealand construction industry: project team’s perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), 1027-1041. http://dx.doi.org/10.1080/01446193.2011.62370810.1080/01446193.2011.623708Search in Google Scholar

Memarian, B., & Mitropoulos, P. (2012). Safety incidents and high-risk activities of masonry construction. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 2510-2519). ASCE. https://web.archive.org/web/20160408204554id_/http://rebar.ecn.purdue.edu/crc2012/papers/pdfs/-153.pdf10.1061/9780784412329.252Search in Google Scholar

Memarian, B., & Mitropoulos, P. (2013). Accidents in masonry construction: the contribution of production activities to accidents, and the effect on different worker groups. Safety Science, 59(November), 179-186. https://doi.org/10.1016/j.ssci.2013.05.013Search in Google Scholar

Mhetre, K., Konnur, B. A., & Landage, A. B. (2016). Risk management in construction industry. International Journal of Engineering Research, 5(1), 153-155. https://doi.org/10.17950/ijer/v5i1/035Search in Google Scholar

Motawa, I., & Kaka, A. (2009). Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(4), 325-336. https://doi.org/10.1108/09699980910970824Search in Google Scholar

Motawa, I., & Kaka, A. (2008). Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), 1-10. https://doi.org/10.5130/AJCEB.v8i2.3001Search in Google Scholar

Muiruri, G., & Mulinge, C. (2014, June 16-21). Health and safety management on construction project sites in Kenya: a case study of construction projects in Nairobi County [Paper presentation]. FIG Congress, Kuala Lumpur, Malaysia.Search in Google Scholar

Muñoz-La Rivera, F., Mora-Serrano, J., & Oñate, E. (2021). Factors influencing safety on construction projects (FSCPs): types and categories. International Journal of Environmental Research and Public Health, 18(20), 10884. https://doi.org/10.3390/ijerph182010884Search in Google Scholar

Nawaz, W., Linke, P., & Koҫ, M. (2019). Safety and sustainability nexus: a review and appraisal. Journal of Cleaner Production, 216(April), 74–87. https://doi.org/10.1016/j.jclepro.2019.01.167Search in Google Scholar

Ndiwa, S. C. (2019). Ergonomic risk factors among workers in building construction sites in Mombasa County [Unpublished master’s thesis]. Jomo Kenyatta University of Agriculture and Technology, Kenya.Search in Google Scholar

Nketekete, M., Emuze, F., & Smallwood, J. (2016). Risk management in public sector construction projects: case studies in Lesotho. Acta Structilia, 23(2), 1-24. http://dx.doi.org/10.18820/24150487/as23i2.110.18820/24150487/as23i2.1Search in Google Scholar

Okoye, P. U. (2018). Occupational health and safety risk level of building construction trades in Nigeria. Construction Economics and Building, 18(2), 92-109. https://doi.org/10.5130/AJCEB.v18i2.5882Search in Google Scholar

Omopariola, E. D., & Windapo, A. O. (2018, September 30–October 1). Framework for matching payment systems to project environment in the construction industry [Paper presentation]. 10th SACQSP International Research Conference, Johannesburg, South Africa.Search in Google Scholar

Oswald, D., Sherratt, F., & Smith, S. (2017, September 4-6). An investigation into a health and safety reward system on a large construction project [Paper presentation]. 33rd Annual ARCOM Conference, Cambridge.Search in Google Scholar

Park, H. K., Han, S. H., & Russell, J. S. (2005). Cash flow forecasting model for general contractors using moving weights of cost categories. Journal of Management in Engineering, 21(4), 164-173. http://dx.doi.org/10.1061/(ASCE)0742-597X(2005)21:4(164)10.1061/(ASCE)0742-597X(2005)21:4(164)Search in Google Scholar

Purohit, D. P., Siddiqui, N. A., Nandan, A., & Yadav, B. P. (2018). Hazard identification and risk assessment in construction industry. International Journal of Applied Engineering Research, 13(10), 7639-7667.Search in Google Scholar

Ramachandra, T. (2013). Exploring feasible solutions to payment problems in the construction industry in New Zealand [Unpublished doctoral thesis]. Construction Management Programme, School of Engineering Faculty of Design and Creative Technologies, Auckland University of Technology, New Zealand.Search in Google Scholar

Revenue. (2021). Relevant contracts tax: relevant operations tax and duty manual. Part 18-02-01, Irish Tax and Custom. https://www.revenue.ie/en/tax-professionals/tdm/income-tax-capital-gains-tax-corporation-tax/part-18/18-02-01.pdfSearch in Google Scholar

Rhee, K. Y., Kim, Y. S., & Cho, Y. H. (2015). The type of payment and working conditions. Safety and Health at Work, 6(4), 289-294. https://doi.org/10.1016/j.shaw.2015.07.001Search in Google Scholar

RICS. (2015). Management of risk: RICS professional note (1st ed.). Royal Institute of Chartered Surveyors. www.rics.org/guidanceSearch in Google Scholar

Schneider, S., & Susi, P. (1994). Ergonomics and construction: a review of potential hazards in new construction. American Industrial Hygiene Association Journal, 55(7), 635-649. https://doi.org/10.1080/15428119491018727Search in Google Scholar

Schneider, S. P. (n.d.). The economics of health and safety in construction. Electronic Library of Construction Occupational Safety and Health. https://www.elcosh.org/document/1742/d000806/The+Economics+of+Health+and+Safety+in+Construction.htmlSearch in Google Scholar

Sherif, E., & Kaka, A. (2003, September 3-5). Factors influencing the selection of payment systems in construction projects [Paper presentation]. 19th Annual ARCOM Conference, Association of Researchers in Construction Management, Brighton, UK.Search in Google Scholar

Siddiqui, K. (2013). Heuristics for sample size determination in multivariate statistical techniques. World Applied Sciences Journal, 27(2), 285-287. https://doi.org/10.5829/idosi.wasj.2013.27.02.889Search in Google Scholar

Swai, L. P., Arewa, A. O., Ugulu, R. A. (2020, February 2-5). Unfair payment issues in construction: re-thinking alternative payment method for tier-1 contractors to subcontractors [Paper presentation]. International Conference on Civil Infrastructure and Construction (CIC), Doha, Qatar. https://doi.org/10.29117/cic.2020.0012Search in Google Scholar

Tabachnick, B. G., & Fidell, L. S. (2013). Using multivariate statistics (6th ed.). Pearson Education.Search in Google Scholar

The University of Melbourne. (2017). Risk assessment methodology. The University of Melbourne. https://safety.unimelb.edu.auSearch in Google Scholar

Vitharana, V. H. P., De Silva, S., & De Silva, G. H. M. J. S. (2015). Health hazards, risk and safety practices in construction sites: a review study. Engineer, 48(3), 35-44. http://iesl.nsf.ac.lk/bitstream/handle/1/1867/Engineer-2015-48(3)_35.pdf?sequence=210.4038/engineer.v48i3.6840Search in Google Scholar

Walimuni, P. C., Samaraweera, A., & De Silva, L. (2017). Payment mechanisms for contractors for better environmental hazard controlling in road construction projects. Built Environment Project and Asset Management, 7(4), 426-440. https://doi.org/10.1108/BEPAM-11-2016-0069Search in Google Scholar

Wells, J. (2016). Protecting the wages of migrant construction workers: Part one. Engineers Against Poverty. http://engineersagainstpoverty.org/wp-content/uploads/2016/11/Protecting-the-Wages-of-Migrant-Construction-Workers-Part-One.pdf.Search in Google Scholar

Workplace Safety and Health Council. (2011). Code of practice on workplace safety and health (WSH) risk management. The Workplace Safety and health Council in collaboration with the Ministry of Manpower. www.wshc.sg.Search in Google Scholar

Wu, X., Chong, H-Y., Wang, G., & Li, S. (2018). The influence of social capitalism on construction safety behaviours: an exploratory megaproject case study. Sustainability, 10(9), 3098. https://doi.org/10.3390/su10093098Search in Google Scholar

Youli, Y., Yingjian, P., & Xiaoxia, L. (2018, July). Research on safety risk management of civil construction projects based on risk matrix method. In IOP Conference Series: Materials Science and Engineering (Vol. 392, No. 6, p. 062080). IOP Publishing. https://doi.org/10.1088/1757-899X/392/6/062080Search in Google Scholar

Zavadskas, E. K., Turskis, Z., & Tamošaitiene, J. (2010). Risk assessment of construction projects. Journal of Civil Engineering and Management, 16(1), 33-46. https://dx.doi.org/10.3846/jcem.2010.0310.3846/jcem.2010.03Search in Google Scholar

Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601-614. https://doi.org/10.1016/j.ijproman.2007.03.001Search in Google Scholar

eISSN:
2392-8042
Język:
Angielski