[Abdalla, S., Apramian, S. S., Cantley, L. F., & Cullen, M. R. (2017). Occupation and risk for injuries. In C. N. Mock, R. Nugent, O. Kobusingye & K. R Smith (Eds.), Injury Prevention and Environmental Health (3rd ed., pp. 97-132). The International Bank for Reconstruction and Development. https://doi.org/10.1596/978-1-4648-0522-6_ch6.]Search in Google Scholar
[Ahmadisheykhsarmast, S., & Sonmez, R. (2020). A smart contract system for security of payment of construction contracts. Automation in Construction, 120(December), 103401. https://doi.org/10.1016/j.autcon.2020.103401]Search in Google Scholar
[Aje, I. O., Olatunji, A. O., &. Olalusi, A. O. (2017). Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), 86-98. https://doi.org/10.1108/BEPAM-06-2015-0028]Search in Google Scholar
[Ajslev, J. Z. N., Persson, R., & Andersen, L. L. (2015). Associations between wage system and risk factors for musculoskeletal disorders among construction workers. Pain Research and Treatment, 11, 513903. https://doi.org/10.1155/2015/513903]Search in Google Scholar
[Alinaitwe, H., Mwakali, J. A., & Hansson, B. (2007). Analysis of accidents on building construction sites reported in Uganda during 2001-2005. In Proceedings of the CIB World Building Congress (pp. 1208-1221). CIB World Building Congress. https://kipdf.com/analysis-of-accidents-on-building-construction-sites-reported-in-uganda-during_5aca03b71723dd217d846c8a.html]Search in Google Scholar
[Almén, L., Larsson, T. J., & Thunqvist, E. (2012). The influence of the designer on the risk of falling from heights and of exposure to excessive workloads on two construction sites. Safety Science Monitor, 16(1), 1-7.]Search in Google Scholar
[Anderson, L. P. S., & Grytnes, R. (2021). Different ways of perceiving risk and safety on construction sites and implications for safety cooperation. Construction Management and Economics, 39(5), 419-43. https://doi.org/10.1080/01446193.2021.1904516]Search in Google Scholar
[Ansah, S. K. (2011). Causes and effects of delayed payments by clients on construction projects in Ghana. Journal of Construction Project Management and Innovation, 1(1), 27-45. https://doi.org/10.36615/jcpm.v1i1.12]Search in Google Scholar
[Bahamid, R. A., & Doh, S. I. (2017). A review of risk management process in construction projects of developing countries. IOP Conference Series: Materials Science and Engineering, 271, 012042. http://dx.doi.org/10.1088/1757-899X/271/1/012042.10.1088/1757-899X/271/1/012042]Search in Google Scholar
[Bake, P. B., & Makinde, J. K. (2021). Payment methods and productivity of construction site workers: a review. In Proceedings of the Academic Conference on Exploring the Sub-Sahara Africa Resources and Opportunities for Sustainable Development in 21st Century (Vol. 12, pp. 71-87). ASUU Conference Hall University of Jos.]Search in Google Scholar
[Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. In N. Banaitiene (Ed.), Risk Management - Current Issues and Challenges (pp. 429-448). IntechOpen. http://dx.doi.org/10.5772/5146010.5772/51460]Search in Google Scholar
[Baradan, S., & Usmen, M. A. (2006). Comparative injury and fatality risk analysis of building trades. Journal of Construction Engineering and Management, 132(5), 533-539. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(533)]Search in Google Scholar
[Bender, K. A., Green, C. P., & Heywood, J. S. (2012). Piece rates and workplace injury: does survey evidence support Adam Smith? Journal of Population Economics, 25(April), 569–590. https://doi.org/10.1007/s00148-011-0393-5]Search in Google Scholar
[Berends, T., & Dhillon, J. (2004). An analysis of contract cost phasing on engineering and construction projects. The Engineering Economist, 49(4), 327-337. https://doi.org/10.1080/00137910490888075]Search in Google Scholar
[Bujang, M. A., Sa’at, N., & Tg Abu Bakar Sidik, T. M. I. (2017). Determination of minimum sample size requirement for multiple linear regression and analysis of covariance based on experimental and non-experimental studies. Epidemiology Biostatistics and Public Health, 14(3), e12117-1-e12117-9. https://doi.org/10.2427/12117]Search in Google Scholar
[Bureau of Labour Statistics. (2009). Incidence rate for nonfatal occupational injuries and illnesses. https://www.bls.gov/iif/oshwc/osh/case/ostb2454.pdf]Search in Google Scholar
[Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., Yeung, J. F. Y., & Chan, J. H. L. (2011). Risk ranking and analysis in target cost contracts: empirical evidence from the construction industry. International Journal of Project Management, 29(6), 751-763. https://doi.org/10.1016/j.ijproman.2010.08.003]Search in Google Scholar
[Choi, S. D. (2015). Aging workers and trade-related injuries in the US construction industry. Safety and Health at Work, 6(1), 151-155. https://dx.doi.org/10.1016/j.shaw.2015.02.00210.1016/j.shaw.2015.02.002]Search in Google Scholar
[de los Pinos, C., José, A., García, G., & de las Nieves, M. (2017). Critical analysis of risk assessment methods applied to construction works. Revista de la Construcción, 16(1), 104-114. https://doi.org/10.7764/RDLC.16.1.104]Search in Google Scholar
[Designing Buildings. (2020). Construction operations definition. https://www.designingbuildings.co.uk/wiki/Construction_operations_definition]Search in Google Scholar
[Ding, J., Zhai, W., Wang, Z., Zhang, K., & Cai, J. (2019). Modelling and design analysis of contract payment methods in civil engineering projects. In IOP Conference Series: Earth and Environmental Science (Vol. 304, No. 3, p. 032001). IOP Publishing. https://doi.org/10.1088/1755-1315/304/3/032001]Search in Google Scholar
[European Bank for Reconstruction and Development. (2010). Sub-sectoral environmental and social guidelines: Building and construction activities. https://www.ebrd.com/downloads/policies/environmental/construction/buidling.pdf]Search in Google Scholar
[Forteza, F. J., Carretero-Gómez, J. M., & Sesé, A. (2020). Safety in the construction industry: accidents and precursors. Revisita de la Construcción, 19(2), 271-281. https://dx.doi.org/10.7764/rdlc.19.2.27110.7764/rdlc.19.2.271-281]Search in Google Scholar
[Gadd, S. A., Keeley, D. M., & Balmforth, H. F. (2004). Pitfalls in risk assessment: examples from the UK. Safety Science, 42(9), 841–857. https://doi.org/10.1016/j.ssci.2004.03.003]Search in Google Scholar
[Fick, G., Cackler, E. T., Trost, S., & Vanzler, L. (2010). Time-related incentive and disincentive provisions in highway construction projects. NCHRP Report, 652. Transportation Research Board. https://doi.org/10.17226/14392]Search in Google Scholar
[Henriod, E. E., & Lantran, J. M. (2000). Trends in contracting practice for civil works. Site Resources, World Bank, New York, 1(9). https://siteresources.worldbank.org/INTROADSHIGHWAYS/Resources/3389931122496826968/cn_ntk2b.pdf]Search in Google Scholar
[Jeong, G., Kim, H., Lee, H. S., Park, M., & Hyun, H. (2022). Analysis of safety risk factors of modular construction to identify accident trends. Journal of Asian Architecture and Building Engineering, 21(3), 1040-1052. https://doi.org/10.1080/13467581.2021.1877141]Search in Google Scholar
[Johansson, B., Rask, K., & Stenberg, M. (2010). Piece rates and their effects on health and safety: a literature review. Applied Ergonomics, 41(4), 607–614. https://doi.org/10.1016/j.apergo.2009.12.020]Search in Google Scholar
[Judi, S. S., & Abdul-Rashid, R. (2010). Contractor’s right of action for late or non-payment by the employer. Journal of Surveying, Construction and Property, 1(1), 1-31. https://doi.org/10.22452/jscp.vol1no1.4]Search in Google Scholar
[Kaim, O. F., Alabi, A. M., & Wusu, S. (2020). Risk assessment for hazard exposure and its consequences on housing construction sites in Lagos Nigeria. Acta Structilia, 27(1), 59-84. https://doi.org/10.18820/24150487/as27i1.3]Search in Google Scholar
[Kaka, A., Wong, C., Fortune, C., & Langford, D. (2008). Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(1), 66-77. https://doi.org/10.1108/09699980810842070]Search in Google Scholar
[Kaka, A.P., & Lewis, J. (2003). Development of a company-level dynamic cash flow forecasting model (DYCAFF). Construction Management and Economics, 21(7) 693-705. https://doi.org/10.1080/0144619032000116561]Search in Google Scholar
[Kang, Y., Siddiqui, S., Suk, S.J., Chi, S., & Kim, C. (2017). Trends of fall accidents in the U.S. construction industry. Journal of Construction Engineering and Management, 143(8), 04017043. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001332]Search in Google Scholar
[Kazimu, M. A. (2012). Significant factors that cause cost overrun in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 391(1), 775-780.]Search in Google Scholar
[Kozlovská, M., & Struková, Z. (2012). Overview of safety risk perception in construction. Journal of Civil Engineering and Architecture, 6(2), 211–218.10.17265/1934-7359/2012.02.010]Search in Google Scholar
[Li, R. Y. M., Chau, K. W., & Zeng, F. F. (2019). Ranking of risks for existing and new building works. Sustainability, 11(10), 2863. https://doi.org/10.3390/su11102863]Search in Google Scholar
[Liu, H., Li, J., Li, H., Li, H., Mao, P., & Yuan, J. (2021). Risk perception and coping behaviour of construction workers on occupational health risks: a case study of Nanjing, China. International Journal of Environmental Research and Public Health, 18(13), 7040. https://doi.org/10.3390/ijerph18137040]Search in Google Scholar
[Luo, H., Das, M., Wang, J., & Cheng, J. C. (2019). Construction payment automation through smart contract-based blockchain framework. In Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 36, pp. 1254-1260). ISARC Publications.10.22260/ISARC2019/0168]Search in Google Scholar
[Mamman, J., Mohammed, Y. D., Shittu, A. A., & Adamu, A. D. (2021, May 25-27). Risk Assessment of Safety for Building Construction Projects in Abuja, Nigeria [Paper presentation]. School of Environmental Technology Conference (SETIC), Federal University of Technology, Minna, Nigeria.]Search in Google Scholar
[Mbachu, J. (2011). Sources of contractor’s payment risks and cash flow problems in the New Zealand construction industry: project team’s perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), 1027-1041. http://dx.doi.org/10.1080/01446193.2011.62370810.1080/01446193.2011.623708]Search in Google Scholar
[Memarian, B., & Mitropoulos, P. (2012). Safety incidents and high-risk activities of masonry construction. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 2510-2519). ASCE. https://web.archive.org/web/20160408204554id_/http://rebar.ecn.purdue.edu/crc2012/papers/pdfs/-153.pdf10.1061/9780784412329.252]Search in Google Scholar
[Memarian, B., & Mitropoulos, P. (2013). Accidents in masonry construction: the contribution of production activities to accidents, and the effect on different worker groups. Safety Science, 59(November), 179-186. https://doi.org/10.1016/j.ssci.2013.05.013]Search in Google Scholar
[Mhetre, K., Konnur, B. A., & Landage, A. B. (2016). Risk management in construction industry. International Journal of Engineering Research, 5(1), 153-155. https://doi.org/10.17950/ijer/v5i1/035]Search in Google Scholar
[Motawa, I., & Kaka, A. (2009). Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(4), 325-336. https://doi.org/10.1108/09699980910970824]Search in Google Scholar
[Motawa, I., & Kaka, A. (2008). Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), 1-10. https://doi.org/10.5130/AJCEB.v8i2.3001]Search in Google Scholar
[Muiruri, G., & Mulinge, C. (2014, June 16-21). Health and safety management on construction project sites in Kenya: a case study of construction projects in Nairobi County [Paper presentation]. FIG Congress, Kuala Lumpur, Malaysia.]Search in Google Scholar
[Muñoz-La Rivera, F., Mora-Serrano, J., & Oñate, E. (2021). Factors influencing safety on construction projects (FSCPs): types and categories. International Journal of Environmental Research and Public Health, 18(20), 10884. https://doi.org/10.3390/ijerph182010884]Search in Google Scholar
[Nawaz, W., Linke, P., & Koҫ, M. (2019). Safety and sustainability nexus: a review and appraisal. Journal of Cleaner Production, 216(April), 74–87. https://doi.org/10.1016/j.jclepro.2019.01.167]Search in Google Scholar
[Ndiwa, S. C. (2019). Ergonomic risk factors among workers in building construction sites in Mombasa County [Unpublished master’s thesis]. Jomo Kenyatta University of Agriculture and Technology, Kenya.]Search in Google Scholar
[Nketekete, M., Emuze, F., & Smallwood, J. (2016). Risk management in public sector construction projects: case studies in Lesotho. Acta Structilia, 23(2), 1-24. http://dx.doi.org/10.18820/24150487/as23i2.110.18820/24150487/as23i2.1]Search in Google Scholar
[Okoye, P. U. (2018). Occupational health and safety risk level of building construction trades in Nigeria. Construction Economics and Building, 18(2), 92-109. https://doi.org/10.5130/AJCEB.v18i2.5882]Search in Google Scholar
[Omopariola, E. D., & Windapo, A. O. (2018, September 30–October 1). Framework for matching payment systems to project environment in the construction industry [Paper presentation]. 10th SACQSP International Research Conference, Johannesburg, South Africa.]Search in Google Scholar
[Oswald, D., Sherratt, F., & Smith, S. (2017, September 4-6). An investigation into a health and safety reward system on a large construction project [Paper presentation]. 33rd Annual ARCOM Conference, Cambridge.]Search in Google Scholar
[Park, H. K., Han, S. H., & Russell, J. S. (2005). Cash flow forecasting model for general contractors using moving weights of cost categories. Journal of Management in Engineering, 21(4), 164-173. http://dx.doi.org/10.1061/(ASCE)0742-597X(2005)21:4(164)10.1061/(ASCE)0742-597X(2005)21:4(164)]Search in Google Scholar
[Purohit, D. P., Siddiqui, N. A., Nandan, A., & Yadav, B. P. (2018). Hazard identification and risk assessment in construction industry. International Journal of Applied Engineering Research, 13(10), 7639-7667.]Search in Google Scholar
[Ramachandra, T. (2013). Exploring feasible solutions to payment problems in the construction industry in New Zealand [Unpublished doctoral thesis]. Construction Management Programme, School of Engineering Faculty of Design and Creative Technologies, Auckland University of Technology, New Zealand.]Search in Google Scholar
[Revenue. (2021). Relevant contracts tax: relevant operations tax and duty manual. Part 18-02-01, Irish Tax and Custom. https://www.revenue.ie/en/tax-professionals/tdm/income-tax-capital-gains-tax-corporation-tax/part-18/18-02-01.pdf]Search in Google Scholar
[Rhee, K. Y., Kim, Y. S., & Cho, Y. H. (2015). The type of payment and working conditions. Safety and Health at Work, 6(4), 289-294. https://doi.org/10.1016/j.shaw.2015.07.001]Search in Google Scholar
[RICS. (2015). Management of risk: RICS professional note (1st ed.). Royal Institute of Chartered Surveyors. www.rics.org/guidance]Search in Google Scholar
[Schneider, S., & Susi, P. (1994). Ergonomics and construction: a review of potential hazards in new construction. American Industrial Hygiene Association Journal, 55(7), 635-649. https://doi.org/10.1080/15428119491018727]Search in Google Scholar
[Schneider, S. P. (n.d.). The economics of health and safety in construction. Electronic Library of Construction Occupational Safety and Health. https://www.elcosh.org/document/1742/d000806/The+Economics+of+Health+and+Safety+in+Construction.html]Search in Google Scholar
[Sherif, E., & Kaka, A. (2003, September 3-5). Factors influencing the selection of payment systems in construction projects [Paper presentation]. 19th Annual ARCOM Conference, Association of Researchers in Construction Management, Brighton, UK.]Search in Google Scholar
[Siddiqui, K. (2013). Heuristics for sample size determination in multivariate statistical techniques. World Applied Sciences Journal, 27(2), 285-287. https://doi.org/10.5829/idosi.wasj.2013.27.02.889]Search in Google Scholar
[Swai, L. P., Arewa, A. O., Ugulu, R. A. (2020, February 2-5). Unfair payment issues in construction: re-thinking alternative payment method for tier-1 contractors to subcontractors [Paper presentation]. International Conference on Civil Infrastructure and Construction (CIC), Doha, Qatar. https://doi.org/10.29117/cic.2020.0012]Search in Google Scholar
[Tabachnick, B. G., & Fidell, L. S. (2013). Using multivariate statistics (6th ed.). Pearson Education.]Search in Google Scholar
[The University of Melbourne. (2017). Risk assessment methodology. The University of Melbourne. https://safety.unimelb.edu.au]Search in Google Scholar
[Vitharana, V. H. P., De Silva, S., & De Silva, G. H. M. J. S. (2015). Health hazards, risk and safety practices in construction sites: a review study. Engineer, 48(3), 35-44. http://iesl.nsf.ac.lk/bitstream/handle/1/1867/Engineer-2015-48(3)_35.pdf?sequence=210.4038/engineer.v48i3.6840]Search in Google Scholar
[Walimuni, P. C., Samaraweera, A., & De Silva, L. (2017). Payment mechanisms for contractors for better environmental hazard controlling in road construction projects. Built Environment Project and Asset Management, 7(4), 426-440. https://doi.org/10.1108/BEPAM-11-2016-0069]Search in Google Scholar
[Wells, J. (2016). Protecting the wages of migrant construction workers: Part one. Engineers Against Poverty. http://engineersagainstpoverty.org/wp-content/uploads/2016/11/Protecting-the-Wages-of-Migrant-Construction-Workers-Part-One.pdf.]Search in Google Scholar
[Workplace Safety and Health Council. (2011). Code of practice on workplace safety and health (WSH) risk management. The Workplace Safety and health Council in collaboration with the Ministry of Manpower. www.wshc.sg.]Search in Google Scholar
[Wu, X., Chong, H-Y., Wang, G., & Li, S. (2018). The influence of social capitalism on construction safety behaviours: an exploratory megaproject case study. Sustainability, 10(9), 3098. https://doi.org/10.3390/su10093098]Search in Google Scholar
[Youli, Y., Yingjian, P., & Xiaoxia, L. (2018, July). Research on safety risk management of civil construction projects based on risk matrix method. In IOP Conference Series: Materials Science and Engineering (Vol. 392, No. 6, p. 062080). IOP Publishing. https://doi.org/10.1088/1757-899X/392/6/062080]Search in Google Scholar
[Zavadskas, E. K., Turskis, Z., & Tamošaitiene, J. (2010). Risk assessment of construction projects. Journal of Civil Engineering and Management, 16(1), 33-46. https://dx.doi.org/10.3846/jcem.2010.0310.3846/jcem.2010.03]Search in Google Scholar
[Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601-614. https://doi.org/10.1016/j.ijproman.2007.03.001]Search in Google Scholar