Zacytuj

I.A Bhatti et al. (2018). “Delay in High-rise Building Construction Projects of Dubai: A Review”. Engineering Science and Technology International Research Journal, Vol.2, No.2, 2018, 7-15.Search in Google Scholar

Buchan R. D., Fleming F. W., Kelly J. R. (1993). Estimating for builders and quantity surveyors, Oxford: Butter worth-Heinemann.Search in Google Scholar

I.A Bhatti et al. (2018). “Replacement of In-situ Bathrooms with POD Bathrooms to Save Time & Money within construction of fast track projects (Project Case study)”. Asian Journal of Technical Vocational Education and Training (AJTVET). Vol. 5, No.9, 2018, 42-45.Search in Google Scholar

Oladiran, O. J. and Onatayo, D. (2019). “Labour productivity: Perception of site managers on building projects” LAUTECH Journal of Civil and Environmental Studies Vol.2, No.1, 2019, 1-10.10.36108/laujoces/9102/20(0110)Search in Google Scholar

Jarkas, A. M. & Bitar, C. G. (2012). Factors affecting construction labour productivity in Kuwait. Journal of Construction Engineering and Management 138(July): 811–820.10.1061/(ASCE)CO.1943-7862.0000501Search in Google Scholar

Revianty Nurmeyliandari Nurhendi, Muhamad Azry Khoiry, Noraini Hamzah (2019). “Review on Factors Influencing Labour Productivity in Construction Project” International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Vol.7, No.6.Search in Google Scholar

S. Sohu et al. (2018). “Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan” Engineering, Technology & Applied Science Research Vol. 8, No. 2, 2018, 2770-2774.10.48084/etasr.1916Search in Google Scholar

I.A Bhatti et al. (2018). “Implementation of Building Information Modeling (BIM) in Pakistan Construction Industry” Engineering, Technology & Applied Science Research Vol. 8, No. 4, 2018, 3199-3202.10.48084/etasr.2145Search in Google Scholar

Kazaz, A., Ulubeyli, S., Acikara, T. & Er, B. (2016). Factors Affecting Labour Productivity: Perspectives of Craft Workers. Procedia Engineering, hlm. 28 – 34. doi:10.1016/j.proeng.2016.11.588.10.1016/j.proeng.2016.11.588Open DOISearch in Google Scholar

Mahamid, I. (2013). Contractors’ perspective toward factors affecting Labour productivity in building construction. Engineering, Construction and Architectural Management 20(5): 446–460. Doi: 10.1108/ECAM-08-2011-0074.10.1108/ECAM-08-2011-0074Open DOISearch in Google Scholar

Gerek, İ. H., Erdis, E., Mistikoglu, G. & Usmen, M. (2015). Modelling masonry crew productivity using two artificial neural network techniques. Journal of Civil Engineering and Management 21(2): 231–238. doi:10.3846/13923730.2013.802741.10.3846/13923730.2013.802741Open DOISearch in Google Scholar

Song, L. & Abourezk’s, S. M. (2008). Measuring and Modeling Labour Productivity Using Historical Data. Journal of Construction Engineering and Management 134(10): 786–794. Doi: 10.1061/(ASCE) 0733-9364(2008)134:10(786).10.1061/(ASCE)0733-9364(2008)134:10(786)Search in Google Scholar

eISSN:
2284-7197
ISSN:
2247-3769
Język:
Angielski
Częstotliwość wydawania:
2 razy w roku
Dziedziny czasopisma:
Engineering, Introductions and Overviews, other, Electrical Engineering, Energy Engineering, Geosciences, Geodesy