[I.A Bhatti et al. (2018). “Delay in High-rise Building Construction Projects of Dubai: A Review”. Engineering Science and Technology International Research Journal, Vol.2, No.2, 2018, 7-15.]Search in Google Scholar
[Buchan R. D., Fleming F. W., Kelly J. R. (1993). Estimating for builders and quantity surveyors, Oxford: Butter worth-Heinemann.]Search in Google Scholar
[I.A Bhatti et al. (2018). “Replacement of In-situ Bathrooms with POD Bathrooms to Save Time & Money within construction of fast track projects (Project Case study)”. Asian Journal of Technical Vocational Education and Training (AJTVET). Vol. 5, No.9, 2018, 42-45.]Search in Google Scholar
[Oladiran, O. J. and Onatayo, D. (2019). “Labour productivity: Perception of site managers on building projects” LAUTECH Journal of Civil and Environmental Studies Vol.2, No.1, 2019, 1-10.10.36108/laujoces/9102/20(0110)]Search in Google Scholar
[Jarkas, A. M. & Bitar, C. G. (2012). Factors affecting construction labour productivity in Kuwait. Journal of Construction Engineering and Management 138(July): 811–820.10.1061/(ASCE)CO.1943-7862.0000501]Search in Google Scholar
[Revianty Nurmeyliandari Nurhendi, Muhamad Azry Khoiry, Noraini Hamzah (2019). “Review on Factors Influencing Labour Productivity in Construction Project” International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Vol.7, No.6.]Search in Google Scholar
[S. Sohu et al. (2018). “Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan” Engineering, Technology & Applied Science Research Vol. 8, No. 2, 2018, 2770-2774.10.48084/etasr.1916]Search in Google Scholar
[I.A Bhatti et al. (2018). “Implementation of Building Information Modeling (BIM) in Pakistan Construction Industry” Engineering, Technology & Applied Science Research Vol. 8, No. 4, 2018, 3199-3202.10.48084/etasr.2145]Search in Google Scholar
[Kazaz, A., Ulubeyli, S., Acikara, T. & Er, B. (2016). Factors Affecting Labour Productivity: Perspectives of Craft Workers. Procedia Engineering, hlm. 28 – 34. doi:10.1016/j.proeng.2016.11.588.10.1016/j.proeng.2016.11.588]Open DOISearch in Google Scholar
[Mahamid, I. (2013). Contractors’ perspective toward factors affecting Labour productivity in building construction. Engineering, Construction and Architectural Management 20(5): 446–460. Doi: 10.1108/ECAM-08-2011-0074.10.1108/ECAM-08-2011-0074]Open DOISearch in Google Scholar
[Gerek, İ. H., Erdis, E., Mistikoglu, G. & Usmen, M. (2015). Modelling masonry crew productivity using two artificial neural network techniques. Journal of Civil Engineering and Management 21(2): 231–238. doi:10.3846/13923730.2013.802741.10.3846/13923730.2013.802741]Open DOISearch in Google Scholar
[Song, L. & Abourezk’s, S. M. (2008). Measuring and Modeling Labour Productivity Using Historical Data. Journal of Construction Engineering and Management 134(10): 786–794. Doi: 10.1061/(ASCE) 0733-9364(2008)134:10(786).10.1061/(ASCE)0733-9364(2008)134:10(786)]Search in Google Scholar