Determination of construction process duration based on labor productivity estimation: A case study
and
Nov 20, 2021
About this article
Article Category: Research Paper
Published Online: Nov 20, 2021
Page range: 2521 - 2538
Received: Mar 21, 2021
Accepted: Sep 30, 2021
DOI: https://doi.org/10.2478/otmcj-2021-0031
Keywords
© 2021 Darja Kubečková et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Kubečková, Darja
VŠB-Technical University of Ostrava, Faculty of Civil Engineering Department of Construction L. Podeště 1875Ostrava-Poruba, Czech Republic
Smugala, Stanislav
Department of Construction, Faculty of Civil Engineering, VŠB – Technical University OstravaOstrava – Poruba, Czech Republic