This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Aound, G., Lee, A., & Wu, S. (2005). From 3D to nD modelling, (Special Issue From 3D to nD). ITcon, 10, pp. 15–16.AoundG.LeeA.WuS.2005From 3D to nD modelling(Special Issue From 3D to nD).101516Search in Google Scholar
Autodesk. (2019). Navisworks Manage. Available at https://www.autodesk.cz/collections/architecture-engineering-construction/overview on 2019.Autodesk2019Available at https://www.autodesk.cz/collections/architecture-engineering-construction/overview on 2019.Search in Google Scholar
Building, D. (2019). Designning Building Wiki. Available at https://www.designingbuildings.co.uk/wiki/Level_of_detail_for_BIM on 8 May, 2019.Building, D.2019Available at https://www.designingbuildings.co.uk/wiki/Level_of_detail_for_BIM on 8 May, 2019.Search in Google Scholar
BuildingSmart. (2019). Building Smart Alliance. Available at https://www.buildingsmart.org/standards/bsi-standards/BuildingSmart2019Available at https://www.buildingsmart.org/standards/bsi-standards/Search in Google Scholar
Chantawit, D., Hadicusumo, B., & Charoenngam, C. (2005). 4D CAD-safety: visualizing project scheduling and safety planning. Construction Innovations, 5(2), pp. 99–114.ChantawitD.HadicusumoB.CharoenngamC.20054D CAD-safety: visualizing project scheduling and safety planning529911410.1108/14714170510815203Search in Google Scholar
Datacomp. (2020). BIMestiMate. Available at https://bimestimate.eu/en/the-theory-of-evolution-bim-3d-7d/ on 2, 2020.Datacomp2020Available at https://bimestimate.eu/en/the-theory-of-evolution-bim-3d-7d/ on 2, 2020.Search in Google Scholar
Hartmann, V., Beucke, K., Shapir, K., & König, M. (2012). Model-based scheduling for construction planning. In: 14th International Conference on Computing in Civil, Moscow.HartmannV.BeuckeK.ShapirK.KönigM.2012In:14th International Conference on Computing in CivilMoscowSearch in Google Scholar
Hu, Z., & Zhang, J. (2008). BIM- and 4D-based integrated solution of analysis and management. Automation in Construction, 4(17), pp. 439–449.HuZ.ZhangJ.2008BIM- and 4D-based integrated solution of analysis and management417439449Search in Google Scholar
Huhnt, W. (2005). Generating sequences of construction tasks. In: Proceedings of the 22nd and W78 Conference on Information Technology in Construction, Dresden.HuhntW.2005In:Proceedings of the 22nd and W78 Conference on Information Technology in ConstructionDresdenSearch in Google Scholar
Jarský, Č. (1994). Automatizovaný systém pro tvorbu ofert, stavebně technologických projektů a řízení staveb CONTEC, verze 11.0 - Přebírání údajů z tiskových sestav výkazů výměr a rozpočtů jiných systémů do systému CONTEC, instruktážní a uživatelská příručka. Kralupy n. Vlt: CONTEC.JarskýČ.1994Kralupy n. Vlt: CONTEC.Search in Google Scholar
Jarský, Č. (2000a). Automatizovaná příprava a řízení realizace staveb, (Automated preparation and management of realization of projects. Kralupy n. Vlt.: CONTEC.JarskýČ.2000a(Automated preparation and management of realization of projects. Kralupy n. Vlt.: CONTEC.Search in Google Scholar
Jarsky, Č. (2000b). Modelling of the Building Process by a Computer Expert System. Standford University, Stanford California, s.n., pp. 566–573.JarskyČ.2000bStandford UniversityStanford Californias.n.,566573Search in Google Scholar
Jarský, Č. (2010). On computer modelling of the building process in construction planning and management. Construction Planning and Management, 2(2), pp. 191–199.JarskýČ.2010On computer modelling of the building process in construction planning and management2219119910.22260/ISARC2010/0049Search in Google Scholar
Jarský, Č. (2011). On computer modeling and utility assessment of building projects. In: s.l., 28th International Symposium on Automation and Robotics in Construction, Seul, Korea.JarskýČ.2011In:s.l., 28th International Symposium on Automation and Robotics in ConstructionSeul, Korea10.22260/ISARC2011/0013Search in Google Scholar
Jarský, Č. (2015). Multimediální učebnice Příprava a realizace objektů a staveb - Multimedia lectures of construction technology. Available at http://technologie.fsv.cvut.cz/aitom/podklady/online-priprava-demo/text41.html on 7, 2019.JarskýČ.2015Available at http://technologie.fsv.cvut.cz/aitom/podklady/online-priprava-demo/text41.html on 7, 2019.Search in Google Scholar
Jarský, Č., & Gacho, P. (2014). ON Computer Processing of Safety and Health Plans in Construction. Bratislava, s.n.JarskýČ.GachoP.2014Bratislavas.n.10.4028/www.scientific.net/AMM.796.43Search in Google Scholar
Khoshnava, S. M., Ahankoob, A., Preece, C., & Rostami, R. (2012). Potential Application of BIM in Construction Dispute and Conflict. Kuala Lumpur, Malaysia, s.n.KhoshnavaS. M.AhankoobA.PreeceC.RostamiR.2012Kuala Lumpur, Malaysias.n.Search in Google Scholar
König, M., Koch, C., Habenicht, I. & Spieckermann, S., 2012. Intelligent BIM-based construction scheduling using discrete event simulation. Berlin, Proceedings of the 2012 Winter Simulation Conference (WSC).KönigM.KochC.HabenichtI.SpieckermannS.2012BerlinProceedings of the 2012 Winter Simulation Conference (WSC)10.1109/WSC.2012.6465232Search in Google Scholar
Kvirenc, P. (2017). Diploma thesis: Význam BIM protokolu ve výstavbových projektech společnosti Skanska a.s.. ČVUT, Prague.KvirencP.2017ČVUTPragueSearch in Google Scholar
Lieyun, D., Ying, Z., & Burcu, A. (2014). Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD. Automation in Construction, 46, pp. 82–93.LieyunD.YingZ.BurcuA.2014Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD46829310.1016/j.autcon.2014.04.009Search in Google Scholar
Lu, W., & Olofsson, T. (2014). Building information modeling and discrete event simulation: Towards an integrated framework. Automation in Construction, 44, pp. 73–83.LuW.OlofssonT.2014Building information modeling and discrete event simulation: Towards an integrated framework44738310.1016/j.autcon.2014.04.001Search in Google Scholar
Matějka, P. (2016). BIM execution plan in Czech Republic. Journal B&IT, VI(2), pp. 17–23.MatějkaP.2016BIM execution plan in Czech RepublicVI2172310.14311/bit.2016.02.03Search in Google Scholar
NBS, T. (2015). The National Building Specification. Available at https://www.thenbs.com on 20 March, 2019.NBS, T.2015Available at https://www.thenbs.com on 20 March, 2019.Search in Google Scholar
Russell, A., Staub-French, S., Tran, N., & Wong, W. (2009). Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction, 18, p. 219–236.RussellA.Staub-FrenchS.TranN.WongW.2009Visualizing high-rise building construction strategies using linear scheduling and 4D CAD1821923610.1016/j.autcon.2008.08.001Search in Google Scholar
Sacks, R., & Barak, R. (2008). Impact of three-dimensional parametricmodeling of building on. Automation in Construction, 4(17), p. 439–449.SacksR.BarakR.2008Impact of three-dimensional parametricmodeling of building on41743944910.1016/j.autcon.2007.08.003Search in Google Scholar
Schinler, D., & Nelson, E. (2008). BIM and the structural engineering community. Structure, 12, pp. 10–12.SchinlerD.NelsonE.2008BIM and the structural engineering community121012Search in Google Scholar
Sigalov, K., & König, M. (2017). Recognition of process patterns for BIM-based construction schedules. Advanced Engineering Informatics, 33, pp. 456–472.SigalovK.KönigM.2017Recognition of process patterns for BIM-based construction schedules3345647210.1016/j.aei.2016.12.003Search in Google Scholar
Veng, I. L. (2019). Learning Revit. Available at https://learning-revit.com/what-is-a-family/ on 3 May, 2019.VengI. L.2019Available at https://learning-revit.com/what-is-a-family/ on 3 May, 2019.Search in Google Scholar
Vitásek, S., & Žák, J. (2018). BIM for cost estimation. Košice, s.n.VitásekS.ŽákJ.2018Košices.n.10.1201/9780429021596-103Search in Google Scholar
Vrána, P. (1999). APSTA - Datová základna pro přípravu a řízení staveb, instruktážní příručka. NETDATA, Prague.VránaP.1999NETDATAPragueSearch in Google Scholar
Wang, H.-W., Lin, J., & Zhang, J. (2020). Work package-based information modeling for resource-constrained scheduling of construction projects. Automation in construction, Januarz. Issue 109.WangH.-W.LinJ.ZhangJ.2020Work package-based information modeling for resource-constrained scheduling of construction projectsJanuarz. Issue 109.10.1016/j.autcon.2019.102958Search in Google Scholar