INFORMAZIONI SU QUESTO ARTICOLO

Cita

Aound, G., Lee, A., & Wu, S. (2005). From 3D to nD modelling, (Special Issue From 3D to nD). ITcon, 10, pp. 15–16.AoundG.LeeA.WuS.2005From 3D to nD modelling(Special Issue From 3D to nD).ITcon101516Search in Google Scholar

Autodesk. (2019). Navisworks Manage. Available at https://www.autodesk.cz/collections/architecture-engineering-construction/overview on 2019.Autodesk2019Navisworks ManageAvailable at https://www.autodesk.cz/collections/architecture-engineering-construction/overview on 2019.Search in Google Scholar

Building, D. (2019). Designning Building Wiki. Available at https://www.designingbuildings.co.uk/wiki/Level_of_detail_for_BIM on 8 May, 2019.Building, D.2019Designning Building WikiAvailable at https://www.designingbuildings.co.uk/wiki/Level_of_detail_for_BIM on 8 May, 2019.Search in Google Scholar

BuildingSmart. (2019). Building Smart Alliance. Available at https://www.buildingsmart.org/standards/bsi-standards/BuildingSmart2019Building Smart AllianceAvailable at https://www.buildingsmart.org/standards/bsi-standards/Search in Google Scholar

Chantawit, D., Hadicusumo, B., & Charoenngam, C. (2005). 4D CAD-safety: visualizing project scheduling and safety planning. Construction Innovations, 5(2), pp. 99–114.ChantawitD.HadicusumoB.CharoenngamC.20054D CAD-safety: visualizing project scheduling and safety planningConstruction Innovations529911410.1108/14714170510815203Search in Google Scholar

Datacomp. (2020). BIMestiMate. Available at https://bimestimate.eu/en/the-theory-of-evolution-bim-3d-7d/ on 2, 2020.Datacomp2020BIMestiMateAvailable at https://bimestimate.eu/en/the-theory-of-evolution-bim-3d-7d/ on 2, 2020.Search in Google Scholar

Hartmann, V., Beucke, K., Shapir, K., & König, M. (2012). Model-based scheduling for construction planning. In: 14th International Conference on Computing in Civil, Moscow.HartmannV.BeuckeK.ShapirK.KönigM.2012Model-based scheduling for construction planningIn:14th International Conference on Computing in CivilMoscowSearch in Google Scholar

Hu, Z., & Zhang, J. (2008). BIM- and 4D-based integrated solution of analysis and management. Automation in Construction, 4(17), pp. 439–449.HuZ.ZhangJ.2008BIM- and 4D-based integrated solution of analysis and managementAutomation in Construction417439449Search in Google Scholar

Huhnt, W. (2005). Generating sequences of construction tasks. In: Proceedings of the 22nd and W78 Conference on Information Technology in Construction, Dresden.HuhntW.2005Generating sequences of construction tasksIn:Proceedings of the 22nd and W78 Conference on Information Technology in ConstructionDresdenSearch in Google Scholar

Jarský, Č. (1994). Automatizovaný systém pro tvorbu ofert, stavebně technologických projektů a řízení staveb CONTEC, verze 11.0 - Přebírání údajů z tiskových sestav výkazů výměr a rozpočtů jiných systémů do systému CONTEC, instruktážní a uživatelská příručka. Kralupy n. Vlt: CONTEC.JarskýČ.1994Automatizovaný systém pro tvorbu ofert, stavebně technologických projektů a řízení staveb CONTEC, verze 11.0 - Přebírání údajů z tiskových sestav výkazů výměr a rozpočtů jiných systémů do systému CONTEC, instruktážní a uživatelská příručkaKralupy n. Vlt: CONTEC.Search in Google Scholar

Jarský, Č. (2000a). Automatizovaná příprava a řízení realizace staveb, (Automated preparation and management of realization of projects. Kralupy n. Vlt.: CONTEC.JarskýČ.2000aAutomatizovaná příprava a řízení realizace staveb(Automated preparation and management of realization of projects. Kralupy n. Vlt.: CONTEC.Search in Google Scholar

Jarsky, Č. (2000b). Modelling of the Building Process by a Computer Expert System. Standford University, Stanford California, s.n., pp. 566–573.JarskyČ.2000bModelling of the Building Process by a Computer Expert SystemStandford UniversityStanford Californias.n.,566573Search in Google Scholar

Jarský, Č. (2010). On computer modelling of the building process in construction planning and management. Construction Planning and Management, 2(2), pp. 191–199.JarskýČ.2010On computer modelling of the building process in construction planning and managementConstruction Planning and Management2219119910.22260/ISARC2010/0049Search in Google Scholar

Jarský, Č. (2011). On computer modeling and utility assessment of building projects. In: s.l., 28th International Symposium on Automation and Robotics in Construction, Seul, Korea.JarskýČ.2011On computer modeling and utility assessment of building projectsIn:s.l., 28th International Symposium on Automation and Robotics in ConstructionSeul, Korea10.22260/ISARC2011/0013Search in Google Scholar

Jarský, Č. (2015). Multimediální učebnice Příprava a realizace objektů a staveb - Multimedia lectures of construction technology. Available at http://technologie.fsv.cvut.cz/aitom/podklady/online-priprava-demo/text41.html on 7, 2019.JarskýČ.2015Multimediální učebnice Příprava a realizace objektů a staveb - Multimedia lectures of construction technologyAvailable at http://technologie.fsv.cvut.cz/aitom/podklady/online-priprava-demo/text41.html on 7, 2019.Search in Google Scholar

Jarský, Č., & Gacho, P. (2014). ON Computer Processing of Safety and Health Plans in Construction. Bratislava, s.n.JarskýČ.GachoP.2014ON Computer Processing of Safety and Health Plans in ConstructionBratislavas.n.10.4028/www.scientific.net/AMM.796.43Search in Google Scholar

Khoshnava, S. M., Ahankoob, A., Preece, C., & Rostami, R. (2012). Potential Application of BIM in Construction Dispute and Conflict. Kuala Lumpur, Malaysia, s.n.KhoshnavaS. M.AhankoobA.PreeceC.RostamiR.2012Potential Application of BIM in Construction Dispute and ConflictKuala Lumpur, Malaysias.n.Search in Google Scholar

König, M., Koch, C., Habenicht, I. & Spieckermann, S., 2012. Intelligent BIM-based construction scheduling using discrete event simulation. Berlin, Proceedings of the 2012 Winter Simulation Conference (WSC).KönigM.KochC.HabenichtI.SpieckermannS.2012Intelligent BIM-based construction scheduling using discrete event simulationBerlinProceedings of the 2012 Winter Simulation Conference (WSC)10.1109/WSC.2012.6465232Search in Google Scholar

Kvirenc, P. (2017). Diploma thesis: Význam BIM protokolu ve výstavbových projektech společnosti Skanska a.s.. ČVUT, Prague.KvirencP.2017Diploma thesis: Význam BIM protokolu ve výstavbových projektech společnosti Skanska a.s.ČVUTPragueSearch in Google Scholar

Lieyun, D., Ying, Z., & Burcu, A. (2014). Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD. Automation in Construction, 46, pp. 82–93.LieyunD.YingZ.BurcuA.2014Building information modeling (BIM) application framework: The process of expanding from 3D to computable nDAutomation in Construction46829310.1016/j.autcon.2014.04.009Search in Google Scholar

Lu, W., & Olofsson, T. (2014). Building information modeling and discrete event simulation: Towards an integrated framework. Automation in Construction, 44, pp. 73–83.LuW.OlofssonT.2014Building information modeling and discrete event simulation: Towards an integrated frameworkAutomation in Construction44738310.1016/j.autcon.2014.04.001Search in Google Scholar

Matějka, P. (2016). BIM execution plan in Czech Republic. Journal B&IT, VI(2), pp. 17–23.MatějkaP.2016BIM execution plan in Czech RepublicJournal B&ITVI2172310.14311/bit.2016.02.03Search in Google Scholar

NBS, T. (2015). The National Building Specification. Available at https://www.thenbs.com on 20 March, 2019.NBS, T.2015The National Building SpecificationAvailable at https://www.thenbs.com on 20 March, 2019.Search in Google Scholar

Russell, A., Staub-French, S., Tran, N., & Wong, W. (2009). Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction, 18, p. 219–236.RussellA.Staub-FrenchS.TranN.WongW.2009Visualizing high-rise building construction strategies using linear scheduling and 4D CADAutomation in Construction1821923610.1016/j.autcon.2008.08.001Search in Google Scholar

Sacks, R., & Barak, R. (2008). Impact of three-dimensional parametricmodeling of building on. Automation in Construction, 4(17), p. 439–449.SacksR.BarakR.2008Impact of three-dimensional parametricmodeling of building onAutomation in Construction41743944910.1016/j.autcon.2007.08.003Search in Google Scholar

Schinler, D., & Nelson, E. (2008). BIM and the structural engineering community. Structure, 12, pp. 10–12.SchinlerD.NelsonE.2008BIM and the structural engineering communityStructure121012Search in Google Scholar

Sigalov, K., & König, M. (2017). Recognition of process patterns for BIM-based construction schedules. Advanced Engineering Informatics, 33, pp. 456–472.SigalovK.KönigM.2017Recognition of process patterns for BIM-based construction schedulesAdvanced Engineering Informatics3345647210.1016/j.aei.2016.12.003Search in Google Scholar

Veng, I. L. (2019). Learning Revit. Available at https://learning-revit.com/what-is-a-family/ on 3 May, 2019.VengI. L.2019Learning RevitAvailable at https://learning-revit.com/what-is-a-family/ on 3 May, 2019.Search in Google Scholar

Vitásek, S., & Žák, J. (2018). BIM for cost estimation. Košice, s.n.VitásekS.ŽákJ.2018BIM for cost estimationKošices.n.10.1201/9780429021596-103Search in Google Scholar

Vrána, P. (1999). APSTA - Datová základna pro přípravu a řízení staveb, instruktážní příručka. NETDATA, Prague.VránaP.1999APSTA - Datová základna pro přípravu a řízení staveb, instruktážní příručkaNETDATAPragueSearch in Google Scholar

Wang, H.-W., Lin, J., & Zhang, J. (2020). Work package-based information modeling for resource-constrained scheduling of construction projects. Automation in construction, Januarz. Issue 109.WangH.-W.LinJ.ZhangJ.2020Work package-based information modeling for resource-constrained scheduling of construction projectsAutomation in constructionJanuarz. Issue 109.10.1016/j.autcon.2019.102958Search in Google Scholar

eISSN:
1847-6228
Lingua:
Inglese
Frequenza di pubblicazione:
Volume Open
Argomenti della rivista:
Engineering, Introductions and Overviews, other