[
1. Theeg, G., Vlasenko, S. (2009) Railway Signalling & Interlocking. International Compendium. Editors: A DVV Media Group publication. Eurailpress, 448 p.
]Search in Google Scholar
[
2. Lisenkov, V.M., Bestemyanov, P.F., Leushin, V.B. and others. (2009) Train traffic control systems on the tracks. Part 2; edited by Lisenkov, V.M. М.: GOU “Training and Methodological Centre for Railway Education”. Transport book, 175 p. (in Russian)
]Search in Google Scholar
[
3. Honcharov, K. V. (2013) Improving the stability of tonal track circuits under fluctuations of ballast resistance Nauka ta progres transportu Vìsnik Dnìpropetrovs’kogo nacìonal’nogo unìversitetu zalìzničnogo transport, 2013, 6 (48), 23-31.10.15802/stp2013/19674
]Search in Google Scholar
[
4. Arkatov, V.S. (1992) Rail chains of main railways / V.S. Arkatov, A.I. Bazhenov, N.F. Kotlyarenko. M.: Transport, 384 p. (in Russian)
]Search in Google Scholar
[
5. Polevoy, Yu.I. (2005) Improvement of devices for monitoring the state of railway track sections. Samara: 2005. p.133 (in Russian)
]Search in Google Scholar
[
6. Honcharov, K.V (2013) The study of transient processes in tonal track circuits. Nauka ta progres transportu Vìsnik Dnìpropetrovs’kogo nacìonal’nogo unìversitetu zalìzničnogo transport, 4 (46), 7-15.
]Search in Google Scholar
[
7. Polevoy, Yu. I. (2010) Models of rail lines. Monograph / Yu.I. Polevoy; Samara. state University. railways of communication. Samara: SamGUPS, 2010, 75 p. (in Russian)
]Search in Google Scholar
[
8. Aliev, R.M. & Aliev, M.M. & Akbarov, U. (2015) Utility Model Patent FAP 01155, 2015. Device rail chain without insulating circuits.
]Search in Google Scholar
[
9. Vasilenko, M.N., Denisov, B.P., Kultin, V., Rastegaev, S.N. (2006) Calculation of parameters and operability testing of jointless tonal rail chains, Problems of transport systems. Izvestia PGUPS, 2, 101-109.
]Search in Google Scholar
[
10. Lisenkov, V.M., Vanshin, A.E., Katkov, M.V. (2010) Methods for improving the safety of rail chains. Automation, communication and informatics, 4, 8-10.
]Search in Google Scholar
[
11. Bryleev, A.M., Kotlyarenko, N.F. (1970) Electric rail chains. M.: Transport, 1970, 256 p. (in Russian.)
]Search in Google Scholar
[
12. Aripov, N. & Aliyev, R. & Baratov, D. & Ametova, E. (2016) Features of Construction of Systems of Railway Automatics and Telemechanics at the Organization of High-Speed Traffic in the Republic of Uzbekistan, Procedia Engineering, 134(2016), 175-180.10.1016/j.proeng.2016.01.057
]Search in Google Scholar
[
13. Aliev, R. M. & Tokhirov, E. T. & Aliev, M.M. (2020) The Mathematical Model of the Sensor for Monitoring the State of the Track Section with Current Receivers, IJRTE, 8(5), 5634-5637.10.35940/ijrte.E5936.018520
]Search in Google Scholar
[
14. Vantuono, W. (2009) Control systems trains in USA. International Railway Journal, 10, 32-34, 36.
]Search in Google Scholar
[
15. Aliyev, R. M., Aliyev, M.M. (2016) Intelligent system of control of track circuits on high – speed lines. WCIS – 2016. 9 World Conference on Intelligent Systems for Industrial Automation. Tashkent, Uzbekistan, October 25-27, 2016, 58-62.
]Search in Google Scholar
[
16. Aliyev, R. M. (2015) Methods for calculating the coefficients of the four – pole rail track circuit without insulating joints for locomotive receiver when the broken rail thread. European Applied Sciences, 6, 55 – 58.
]Search in Google Scholar
[
17. Zhang, B., Ma, W., Chang, G. (2019) Diagnosis approach on compensation capacitor fault of jointless track circuit based on simulated annealing algorithm Advances in Intelligent Systems and Computing (2019), 759, 417-426.10.1007/978-981-13-0341-8_38
]Search in Google Scholar