Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study


Zacytuj

Hossain A., Bissenova A. & Kim J. R. (2019). Investigation of Wasteful Activities Using Lean Methodology: In Perspective of Kazakhstan’s Construction Industry. Buildings 9(5), 113. DOI: 10.3390/buildings9050113. Search in Google Scholar

Rajkumar K. B. & Biswas A. P. (2016). Identification of Non-Value Adding Activities using Lean Technology in Construction. Int. J. of Engineering Research & Technology (IJERT) 5(3), pp. 640-643. Retrieved date of access 11.04.2023 from https://www.ijert.org/. Search in Google Scholar

Chamulová B. (2013). Dynamický časový plán v procese riadenia výstavby. 1. vyd. Brno: Tribun EU, 97. Search in Google Scholar

Issa Us. H. & Alqurashi M. (2020). A Model for Evaluating Causes of Wastes and Lean Implementation in Construction Projects, Jour. of Civ. Eng. and Man. 26 (4), 331. Search in Google Scholar

Mughees, A., Zhili, G. & Gary, S. (2020). Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, DOI:10.1080/15623599.2020.1729933. Search in Google Scholar

Zhanga, L. & Chenb, X. (2016). Role of lean tools in supporting knowledge creation and performance in lean construction. International Conference on Sustainable Design, Engineering and Construction. Procedia Engineering, 145, pp. 1267 – 1274. DOI: 10.1016/j.proeng.2016.04.163. Search in Google Scholar

Brioso X., Murguia D. & Urbina A. (2017). Teaching Takt-Time, Flowline, and Point-to-Point Precedence Relations: A Peruvian Case Study. In Creative Construction Conference, 19-22 June 2017, Primosten, Croatia. Search in Google Scholar

Yassine T., Bacha M. B. Sa, Fayek F. & Hamzeh F. (2014). Implementing Takt-Time Planning in Construction to Improve Workflow. In IGLC-22 Production Planning and Control 22, June (pp. 787–798). Oslo. Search in Google Scholar

Fabian A., & Adel F. (2020). Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art. Front. Built Environ. 6. DOI: 10.3389/fbuil.2020.00128. Search in Google Scholar

Keskiniva K., Saari A. & Junnonen J.-M. (2021). Takt Production Monitoring and Control in Apartment Renovation Projects. Buildings, 11, 92. DOI: 10.3390/buildings11030092. Search in Google Scholar

Keskiniva K., Saari A. & Junnonen J.-M. (2020). Takt Planning in Apartment Building Renovation Projects. Buildings, 10, 226; DOI:10.3390/buildings10120226. Search in Google Scholar

Frandson A., Berghede K. & Tommelein I. (2013). Takt Time Planning for Construction of Exterior Cladding. In 21st annual conference of the International Group for Lean Construction, 31-2 Aug (pp. 527–536). Fortaleza, Brazil. Search in Google Scholar

Brioso X., Murguia D. & Urbina A. (2017). Comparing three scheduling methods using BIM models in the Last Planner System. Organization, Technology and Management in Construction: An International Journal,9(1) 1604-1614. DOI: 10.1515/otmcj-2016-0024. Search in Google Scholar

Gašparík, J., Motyčka, V., Šťastný, P., & Szalayová, S. (2021). Multi-Criteria Optimization of Mechanized Earth Processes and Its Impact on Economic and Environmental Sustainability. Sustainability, 14(1), 78. DOI: 10.3390/su14010078. Search in Google Scholar

Gonos R. & Kušnírik M. (2021). Polyfunkčný súbor “Popradská“ I.etapa. Realizačný projekt, 1-22. Search in Google Scholar