This work is licensed under the Creative Commons Attribution 4.0 International License.
Akintan, O. A., & Morledge, R. (2013). Improving the collaboration between main contractors and subcontractors within traditional construction procurement. Journal of Construction Engineering, 2013, pp. 1–11. doi: 10.1155/2013/281236.AkintanO. A.MorledgeR. (2013). Improving the collaboration between main contractors and subcontractors within traditional construction procurement. , 2013, pp. 1–11. doi: 10.1155/2013/281236.Open DOISearch in Google Scholar
Ali, A. (2008). Integrative Mechanisms in the Design Process of Building Refurbishment Projects. Universiti Teknologi MARA, Shahalam, Selangor, Malaysia.AliA. (2008). . Universiti Teknologi MARA, Shahalam, Selangor, Malaysia.Search in Google Scholar
Ali, A. (2010). Design information in managing refurbishment projects in Malaysia. The International Journal of Physical Sciences, 5, pp. 768–773.AliA. (2010). Design information in managing refurbishment projects in Malaysia. , 5, pp. 768–773.Search in Google Scholar
Ali, A. S. (2014). Complexity in managing refurbishment design process : Malaysian experience. Building Surveying, Facilities Management and Engineering, 15, pp. 1–5. doi: 10.1051/matecconf/20141501030.AliA. S. (2014). Complexity in managing refurbishment design process : Malaysian experience. , 15, pp. 1–5. doi: 10.1051/matecconf/20141501030.Open DOISearch in Google Scholar
Ali, A. S., & Au-Yong C. P. (2021). Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622–635. doi: 10.1108/IJBPA-01-2021-0005.AliA. S.Au-YongC. P. (2021). Risk factors in the refurbishment design process: The case of Malaysia. , 40(4), pp. 622–635. doi: 10.1108/IJBPA-01-2021-0005.Open DOISearch in Google Scholar
Ali, A. S., Peng, A. Y. C., & Ling, S. C. (2014). Managing refurbishment projects through selection of procurement system: The case of Malaysia. European Journal of Sustainable Development, 3(4), pp. 311–322. doi: 10.14207/ejsd.2014. v3n4p311.AliA. S.PengA. Y. C.LingS. C. (2014). Managing refurbishment projects through selection of procurement system: The case of Malaysia. , 3(4), pp. 311–322. doi: 10.14207/ejsd.2014.v3n4p311.Open DOISearch in Google Scholar
Ali, A., & Zakaria, R. (2012). Complexity of statutory requirements: Case study of refurbishment projects in Malaysia. Journal of Building Performance, 3(1), pp. 49–54.AliA.ZakariaR. (2012). Complexity of statutory requirements: Case study of refurbishment projects in Malaysia. , 3(1), pp. 49–54.Search in Google Scholar
Al-Sedairy, S. T. (1994). Management of conflict. International Journal of Project Management, 12(3), pp. 143–151. doi: 10.1016/0263-7863(94)90029-9.Al-SedairyS. T. (1994). Management of conflict. , 12(3), pp. 143–151. doi: 10.1016/0263-7863(94)90029-9.Open DOISearch in Google Scholar
Ansari, R., Khalilzadeh, M., Taherkhani, R., Antucheviciene, J., Migilinskas, D., & Moradi, S. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. Sustainability, 14(7), p. 4138. doi: 10.3390/su14074138.AnsariR.KhalilzadehM.TaherkhaniR.AntuchevicieneJ.MigilinskasD.MoradiS. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. , 14(7), p. 4138. doi: 10.3390/su14074138.Open DOISearch in Google Scholar
Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), pp. 1515–1539. doi: 10.1016/j.aej.2016.03.006.AzizR. F.Abdel-HakamA. A. (2016). Exploring delay causes of road construction projects in Egypt. , 55(2), pp. 1515–1539. doi: 10.1016/j.aej.2016.03.006.Open DOISearch in Google Scholar
Baudrit, C., Taillandier, F., Tran, T. T. P., & Breysse, D. (2019). Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models. Computer-Aided Civil and Infrastructure Engineering, 34(2), pp. 97–115. doi: 10.1111/mice.12391.BaudritC.TaillandierF.TranT. T. P.BreysseD. (2019). Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models. , 34(2), pp. 97–115. doi: 10.1111/mice.12391.Open DOISearch in Google Scholar
Bekele, A. (2015). Alternative dispute resolution methods in construction industry : An assesment of ethiopian situation. PhD thesis, School of Graduate Studies Addis Ababa University Faculity of Technology, pp. 1–147.BekeleA. (2015). Alternative dispute resolution methods in construction industry : An assesment of ethiopian situation. PhD thesis, , pp. 1–147.Search in Google Scholar
Bernstein, H. M., Joneset, S. A., Russo, M. A., Laquidara, D., Taylor, W., Ramos, J., & Lorenz, A. (2014). Managing uncertainty and expectations in building design and construction. 1st edn. In: Bernstein, H. M., et al. (eds.), SmartMarket Report. Bedford, McGraw-Hill Construction.BernsteinH. M.JonesetS. A.RussoM. A.LaquidaraD.TaylorW.RamosJ.LorenzA. (2014). Managing uncertainty and expectations in building design and construction. 1st edn. In: BernsteinH. M., (eds.), . Bedford, McGraw-Hill Construction.Search in Google Scholar
Bhattacherjee, A. (2012). Social Science Research: Principles, Methods, and Practices. Textbooks Collection, University of South Florida,Tampa, USA.BhattacherjeeA. (2012). . Textbooks Collection, University of South Florida,Tampa, USA.Search in Google Scholar
Bulleit, W. M. (2008). Uncertainty in structural engineering. Practice Periodical on Structural Design and Construction, 13(1), pp. 24–30. doi: 10.1061/(ASCE)1084-0680(2008) 13:1(24).BulleitW. M. (2008). Uncertainty in structural engineering. , 13(1), pp. 24–30. doi: 10.1061/(ASCE)1084-0680(2008) 13:1(24).Open DOISearch in Google Scholar
Camelo-Ordaz, C., García-Cruz, J., & Sousa-Ginel, E. (2014). Antecedents of relationship conflict in top management teams. International Journal of Conflict Management, 25(2), pp. 124–147. doi:10.1108/IJCMA-06-2012-0054.Camelo-OrdazC.García-CruzJ.Sousa-GinelE. (2014). Antecedents of relationship conflict in top management teams. , 25(2), pp. 124–147. doi:10.1108/IJCMA-06-2012-0054.Open DOISearch in Google Scholar
Cao, J., Liu, C., Wu, G., Zhao, X., & Jiang, Z. (2020). Work–family conflict and job outcomes for construction professionals: The mediating role of affective organizational commitment. International Journal of Environmental Research and Public Health, 17(4), p. 1443. doi: 10.3390/ijerph17041443.CaoJ.LiuC.WuG.ZhaoX.JiangZ. (2020). Work–family conflict and job outcomes for construction professionals: The mediating role of affective organizational commitment. , 17(4), p. 1443. doi: 10.3390/ijerph17041443.Open DOISearch in Google Scholar
Cerić, A. (2021). Reducing information asymmetry and building trust in projects using blockchain technology. Gradjevinar, 73(10), pp. 967–978. doi: 10.14256/JCE.3310.2021.CerićA. (2021). Reducing information asymmetry and building trust in projects using blockchain technology. , 73(10), pp. 967–978. doi: 10.14256/JCE.3310.2021.Open DOISearch in Google Scholar
Charkhakan, M. H., & Heravi, G. (2022). Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(19), pp. 1932–1950. doi: 10.1108/ECAM-11-2019-0651.CharkhakanM. H.HeraviG. (2022). Quantifying the predictability and preventability of conflicts between construction project parties. , 30(19), pp. 1932–1950. doi: 10.1108/ECAM-11-2019-0651.Open DOISearch in Google Scholar
Cheung, S. O., & Pang, K. H. Y. (2013). Anatomy of construction disputes. Construction Engineering and Management, 139, pp. 15–23. doi: 10.1061/(ASCE)CO.1943-7862.0000532.CheungS. O.PangK. H. Y. (2013). Anatomy of construction disputes. , 139, pp. 15–23. doi: 10.1061/(ASCE)CO.1943-7862.0000532.Open DOISearch in Google Scholar
Chong, H. Y., & Zin, R. M. (2010). A case study into the language structure of construction standard form in Malaysia. International Journal of Project Management, 28(6), pp. 601–608. doi: 10.1016/j.ijproman.2009.09.008.ChongH. Y.ZinR. M. (2010). A case study into the language structure of construction standard form in Malaysia. , 28(6), pp. 601–608. doi: 10.1016/j.ijproman.2009.09.008.Open DOISearch in Google Scholar
Dada, M. O. (2013). Conflicts in construction projects procured under traditional and integrated systems: A correlation analysis conflicts in construction projects procured under traditional and integrated methods: A correlation analysis. International Journal of Construction Supply Chain Management, 3(1), pp. 1–15. doi: 10.14424/ijcscm301013-01-15.DadaM. O. (2013). Conflicts in construction projects procured under traditional and integrated systems: A correlation analysis conflicts in construction projects procured under traditional and integrated methods: A correlation analysis. , 3(1), pp. 1–15. doi: 10.14424/ijcscm301013-01-15.Open DOISearch in Google Scholar
Diab, M., Mehany, M. (2021). Contingency Use and Project Delivery Influence on Infrastructure Project Risk Assessment. In: Ahmed, S.M., Hampton, P., Azhar, S., D. Saul, A. (eds) Collaboration and Integration in Construction, Engineering, Management and Technology. Advances in Science, Technology & Innovation. Springer, Cham. pp. 589–592,https://doi.org/10.1007/978-3-030-48465-1_97.DiabM.MehanyM. (2021). Contingency Use and Project Delivery Influence on Infrastructure Project Risk Assessment. In: AhmedS.M.HamptonP.AzharS.D. SaulA. (eds) . Springer, Cham. pp. 589–592,https://doi.org/10.1007/978-3-030-48465-1_97.Search in Google Scholar
Doran, D., et al. (2009). Refurbishment and Repair in Construction Whittles Publishing, Dunbeath, Scotland, UK, pp. 11–314, IBSN 9781904445555.DoranD., (2009). Whittles Publishing, Dunbeath, Scotland, UK, pp. 11–314, IBSN 9781904445555.Search in Google Scholar
Egbu, C. (1994). Management education and training for construction work within the construction industry. A Ph.D thesis submitted to the department of civil engineering and construction,university of Salford, Salford, UK.EgbuC. (1994). Management education and training for construction work within the construction industry. ,university of Salford, Salford, UK.Search in Google Scholar
Gref, L. G. (2010). The Rise and Fall of American Technology. Algora Pub, New York, USA.GrefL. G. (2010). . Algora Pub, New York, USA.Search in Google Scholar
Hair, Jr, J. F, Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). A primer on partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. European Business Review, 26(2), pp. 106–121.doi: 10.1108/EBR-10-2013-0128.HairJ. F.JrSarstedtM.HopkinsL.KuppelwieserV. G. (2014). A primer on partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. , 26(2), pp. 106–121. doi: 10.1108/EBR-10-2013-0128.Open DOISearch in Google Scholar
Harmon, K. M. J. (2003a). Conflicts between owner and contractors: Proposed intervention process. Journal of Management in Engineering, 19(3), pp. 121–125. doi: 10.1061/(ASCE)0742-597X(2003)19:3(121).HarmonK. M. J. (2003a). Conflicts between owner and contractors: Proposed intervention process. , 19(3), pp. 121–125. doi: 10.1061/(ASCE)0742-597X(2003)19:3(121).Open DOISearch in Google Scholar
Harmon, K. M. J. (2003b). Resolution of construction disputes: A review of current methodologies. Leadership & Management in Engineering, 3(4), pp. 187–201. doi: 10.1061/(ASCE)1532-6748(2003)3:4(187).HarmonK. M. J. (2003b). Resolution of construction disputes: A review of current methodologies. , 3(4), pp. 187–201. doi: 10.1061/(ASCE)1532-6748(2003)3:4(187).Open DOISearch in Google Scholar
Harter, H., Singh, M. M., Schneider-Marin, P., Lang, W., & Geyer, P. (2020). Uncertainty analysis of life cycle energy assessment in early stages of design. Energy and Buildings, 208, p. 109635. doi: 10.1016/j.enbuild.2019.109635.HarterH.SinghM. M.Schneider-MarinP.LangW.GeyerP. (2020). Uncertainty analysis of life cycle energy assessment in early stages of design. , 208, p. 109635. doi: 10.1016/j.enbuild.2019.109635.Open DOISearch in Google Scholar
Harvett, C. M. (2013). A study of uncertainty and risk management practice relative to perceived project complexity. Doctoral Dissertations, p. 265.HarvettC. M. (2013). A study of uncertainty and risk management practice relative to perceived project complexity. , p. 265.Search in Google Scholar
Holm, M. G. (2000). Service management in housing refurbishment: A theoretical approach. Construction Management and Economics, 18(5), pp. 525–533. doi: 10.1080/014461900407338.HolmM. G. (2000). Service management in housing refurbishment: A theoretical approach. , 18(5), pp. 525–533. doi: 10.1080/014461900407338.Open DOISearch in Google Scholar
Juan, Y.-K., Perng, Y.-H., Castro-Lacouture, D., & Lu, K.-S. (2009). Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach. Automation in Construction, 18(2), pp. 139–144. doi: 10.1016/j.autcon.2008.06.001.JuanY.-K.PerngY.-H.Castro-LacoutureD.LuK.-S. (2009). Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach. , 18(2), pp. 139–144. doi: 10.1016/j.autcon.2008.06.001.Open DOISearch in Google Scholar
Kamari, A., Jensen, S. R., Corrao, R., & Kirkegaard, P. H. (2019). A holistic multi-methodology for sustainable renovation. International Journal of Strategic Property Management, 23(1), pp. 50–64. doi: 10.3846/ijspm.2019.6375.KamariA.JensenS. R.CorraoR.KirkegaardP. H. (2019). A holistic multi-methodology for sustainable renovation. , 23(1), pp. 50–64. doi: 10.3846/ijspm.2019.6375.Open DOISearch in Google Scholar
Kang, B, Price, A D F, Thorpe, A., & Edum-Fotwe, F T (2004) Developing a systems approach for managing ethics in construction project environments. ARCOM Conference, Heriot Watt University. Association of Researchers in Construction Management, (2), 367–75.KangBPriceA D FThorpeA.Edum-FotweF T (2004) Developing a systems approach for managing ethics in construction project environments. , (2), 367–75.Search in Google Scholar
Kerzner, H. H. R. (2013). Project management: A systems approach to planning, scheduling, and controlling. John Wiley & Sons, Inc.Hoboken, New Jersey Published simultaneously in Canada. doi: 10.1016/0377-2217(82)90164-3.KerznerH. H. R. (2013). . John Wiley & Sons, Inc.Hoboken, New Jersey Published simultaneously in Canada. doi: 10.1016/0377-2217(82)90164-3.Open DOISearch in Google Scholar
Khahro, S. H., & Ali, T. H. (2014). Causes leading to conflicts in construction projects : A viewpoint of Pakistani construction industry. International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July 17-18, 2014, Phuket (Thailand), pp. 116–121.KhahroS. H.AliT. H. (2014). . International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July 17-18, 2014, Phuket (Thailand), pp. 116–121.Search in Google Scholar
Kim, J. J., Miller, J. A., & Kim, S. (2020). Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8), p. 04020094. doi: 10.1061/(asce) co.1943-7862.0001888.KimJ. J.MillerJ. A.KimS. (2020). Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. , 146(8), p. 04020094. doi: 10.1061/(asce)co.1943-7862.0001888.Open DOISearch in Google Scholar
Korytárová, J., Hanák, T., & Lukele, P. E. (2017). Economic efficiency of brownfield regeneration: Study of South Moravian projects. Scientific Review Engineering and Environmental Sciences, 26(2), pp. 151–158. doi: 10.22630/PNIKS.2017.26.2.13.KorytárováJ.HanákT.LukeleP. E. (2017). Economic efficiency of brownfield regeneration: Study of South Moravian projects. , 26(2), pp. 151–158. doi: 10.22630/PNIKS.2017.26.2.13.Open DOISearch in Google Scholar
Kromidha, E., Spence, L. J., Anastasiadis, S., & Dore, D. (2019). A longitudinal perspective on sustainability and innovation governmentality: The case of the olympic games as a mega-event. Journal of Management Inquiry, 28(1), pp. 77–93. doi: 10.1177/1056492617711585.KromidhaE.SpenceL. J.AnastasiadisS.DoreD. (2019). A longitudinal perspective on sustainability and innovation governmentality: The case of the olympic games as a mega-event. , 28(1), pp. 77–93. doi: 10.1177/1056492617711585.Open DOISearch in Google Scholar
Lee, C. Won, J. W., Jang, W., Jung, W., Han, S. H., & Kwak, Y. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8), pp. 1683–1696. doi: 10.1016/j.ijproman.2017.07.011.LeeC.WonJ. W.JangW.JungW.HanS. H.KwakY. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. , 35(8), pp. 1683–1696. doi: 10.1016/j.ijproman.2017.07.011.Open DOISearch in Google Scholar
Lee, L. A., Jr., & Polkinghorn. B. (2008). Managing conflict in construction megaprojects: Leadership and third-party principles. Conflict Resolution Quarterly, 26(2), pp. 167–198. doi: 10.1002/crq.229.LeeL. A.Jr.PolkinghornB. (2008). Managing conflict in construction megaprojects: Leadership and third-party principles. , 26(2), pp. 167–198. doi: 10.1002/crq.229.Open DOISearch in Google Scholar
Liu, T. (2014). Conflicting Objectives in Interfaces of Construction Project. Norwegian University of Science and Technology, Trondheim, Norway.LiuT. (2014). . Norwegian University of Science and Technology, Trondheim, Norway.Search in Google Scholar
Lumineau, F., Eckerd, V., & Handley, S. (2015) Inter-organizational conflicts. Journal of Strategic Contracting and Negotiation, 1(1), pp. 42–64. doi: 10.1177/2055563614568493.LumineauF.EckerdV.HandleyS. (2015) Inter-organizational conflicts. , 1(1), pp. 42–64. doi: 10.1177/2055563614568493.Open DOISearch in Google Scholar
Mahamid, I. (2016). Micro and macro level of dispute causes in residential building projects: Studies of Saudi Arabia. Journal of King Saud University - Engineering Sciences, 28(1), pp. 12–20. doi: 10.1016/J.JKSUES.2014.03.002.MahamidI. (2016). Micro and macro level of dispute causes in residential building projects: Studies of Saudi Arabia. , 28(1), pp. 12–20. doi: 10.1016/J.JKSUES.2014.03.002.Open DOISearch in Google Scholar
Teixeira, J. M. C., Minasowicz, A., Zavadskas, E. K., Ustinovichius, L., Migilinskas, D., Armiñana, E. P., Nowak, P. O., & Grabiec, M. (2006). Training needs in construction project management : A survey of 4 countries of the EU. Journal of Civil Engineering and Management, 12(3), pp. 237–245. https://doi.org/10.3846/13923730.2006.9636398.TeixeiraJ. M. C.MinasowiczA.ZavadskasE. K.UstinovichiusL.MigilinskasD.ArmiñanaE. P.NowakP. O.GrabiecM. (2006). Training needs in construction project management : A survey of 4 countries of the EU. , 12(3), pp. 237–245. https://doi.org/10.3846/13923730.2006.9636398.Search in Google Scholar
Manuel, J. et al. (2016). Training needs in construction project management: A survey of 4 countries of the EU. Journal of Civil Engineering and Management, 3730(May), pp. 237–245. doi:10.1080/13923730.2006.9636398.ManuelJ. (2016). Training needs in construction project management: A survey of 4 countries of the EU. , 3730(May), pp. 237–245. doi:10.1080/13923730.2006.9636398.Open DOISearch in Google Scholar
Mokariantabari, M., Adnan, H., Hussin, M. A. J., Abidin, Z. Z., Baharuddin, H. E. A., & Ismail, W. N. W. (2019). Assessment of complexity factors in briefing stage of refurbishment projects in Malaysia. IOP Conference Series: Earth and Environmental Science, 385(1), p. 012052. doi: 10.1088/1755-1315/385/1/012052.MokariantabariM.AdnanH.HussinM. A. J.AbidinZ. Z.BaharuddinH. E. A.IsmailW. N. W. (2019). Assessment of complexity factors in briefing stage of refurbishment projects in Malaysia. , 385(1), p. 012052. doi: 10.1088/1755-1315/385/1/012052.Open DOISearch in Google Scholar
Moura, H., & Teixeira, J. (2010). Managing stakeholders conflicts. Construction Stakeholder Management, pp. 286–316. https://api.semanticscholar.org/CorpusID:167140539MouraH.TeixeiraJ. (2010). Managing stakeholders conflicts. , pp. 286–316. https://api.semanticscholar.org/CorpusID:167140539Search in Google Scholar
Mustafa, N. K. F. (2007). Building Refurbishment Project in Malaysia. Universiti Teknologi Malaysia,Skudai, Johor, Malaysia.MustafaN. K. F. (2007). . Universiti Teknologi Malaysia,Skudai, Johor, Malaysia.Search in Google Scholar
Narh, O. C., Owusu, E., Oduro-Apeatu, K., & Narh, J T.-W. (2015). An exploratory study of professional conflicts and disputes within the construction industry. International Journal of Managerial Studies and Research, 3(12), pp. 44–65.NarhO. C.OwusuE.Oduro-ApeatuK.NarhJ. T.-W. (2015). An exploratory study of professional conflicts and disputes within the construction industry. , 3(12), pp. 44–65.Search in Google Scholar
Noori, A., & Mokariantabari, M. (2019a). Inter-organizational integration (IOI) in building refurbishment projects; An exploratory factor analysis (EFA) approach. International Journal of Scientific & Engineering Research, 10(11), p. 1361.NooriA.MokariantabariM. (2019a). Inter-organizational integration (IOI) in building refurbishment projects; An exploratory factor analysis (EFA) approach. , 10(11), p. 1361.Search in Google Scholar
Noori, A., & Mokariantabari, M. (2019b). Uncertainties in building refurbishment projects; an exploratory factor analysis (EFA) approach. International Journal of Scientific & Engineering Research, 10(11), pp. 1065–1068.NooriA.MokariantabariM. (2019b). Uncertainties in building refurbishment projects; an exploratory factor analysis (EFA) approach. , 10(11), pp. 1065–1068.Search in Google Scholar
Noori, A., Nafisi, N., & Mokariantabari, M. (2021). Inter-organizational conflict (IOC) in building refurbishment projects; an exploratory factor analysis (EFA) approach. Journal of Construction Research, 2(1), pp. 29–36. doi: 10.30564/jcr.v2i1.2732.NooriA.NafisiN.MokariantabariM. (2021). Inter-organizational conflict (IOC) in building refurbishment projects; an exploratory factor analysis (EFA) approach. , 2(1), pp. 29–36. doi: 10.30564/jcr.v2i1.2732.Open DOISearch in Google Scholar
Noori, A., Saruwono, M., Adnan, H., & Rahmat, I. (2016). Conflict, complexity, and uncertainty in building refurbishment projects. In: InCIEC 2015. Springer, Singapore, pp. 251–258. doi: 10.1007/978-981-10-0155-0_24.NooriA.SaruwonoM.AdnanH.RahmatI. (2016). Conflict, complexity, and uncertainty in building refurbishment projects. In: . Springer, Singapore, pp. 251–258. doi: 10.1007/978-981-10-0155-0_24.Open DOISearch in Google Scholar
Ntiyakunze, S. K. (2011). Conflicts in Building Projects in Tanzania : Analysis of Causes and Management Approaches. Royal Institute of Technology (KTH), Stockholm, Sweden.NtiyakunzeS. K. (2011). . Royal Institute of Technology (KTH), Stockholm, Sweden.Search in Google Scholar
Nutt, B., McLennan, P., & Walters, R. (1998). Refurbishing Occupied Buildings: The Management of Risk Under the CDM Regulations. Thomas Telford, Leeds, UK.NuttB.McLennanP.WaltersR. (1998). . Thomas Telford, Leeds, UK.Search in Google Scholar
Ofori, G. (2013). Conflict in construction. Construction Management and Economics, 31(5), pp. 497–501. doi: 10.1080/01446193.2013.767465.OforiG. (2013). Conflict in construction. , 31(5), pp. 497–501. doi: 10.1080/01446193.2013.767465.Open DOISearch in Google Scholar
Okeil, A. M., et al. (2013). Enforce ability of limitation of liability clauses in engineering contracts. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, pp. 128–135. 5(3), https://doi.org/10.1061/(ASCE)LA. 1943-4170.0000125.OkeilA. M., (2013). Enforce ability of limitation of liability clauses in engineering contracts. , pp. 128–135. 5(3), https://doi.org/10.1061/(ASCE)LA. 1943-4170.0000125.Search in Google Scholar
Osei-Kyei, R., Chan, A. P. C., Yu, Y., Chen, C., & Dansoh, A. (2019). Root causes of conflict and conflict resolution mechanisms in public-private partnerships: Comparative study between Ghana and China. Cities, 87, pp. 185–195. doi: 10.1016/j.cities.2018.10.001.Osei-KyeiR.ChanA. P. C.YuY.ChenC.DansohA. (2019). Root causes of conflict and conflict resolution mechanisms in public-private partnerships: Comparative study between Ghana and China. , 87, pp. 185–195. doi: 10.1016/j.cities.2018.10.001.Open DOISearch in Google Scholar
Pallant, J. (2020). SPSS Survival Manual: A step by step guide to data analysis using IBM SPSS (7th ed.). McGraw-Hill, Open University Press, London, UK. https://doi.org/10.4324/9781003117452PallantJ. (2020). (7th ed.). McGraw-Hill, Open University Press, London, UK. https://doi.org/10.4324/9781003117452Search in Google Scholar
Rahmat, I. (1997). The Planning and Control Process of Refurbishment Projects. University College London, London, UK.RahmatI. (1997). . University College London, London, UK.Search in Google Scholar
Rahmat, I. (2008). Managing Refurbishment Projects. Pusat Penerbitan Universiti, Universiti Teknologi MARA, Shah Alam, Malaysia.RahmatI. (2008). . Pusat Penerbitan Universiti, Universiti Teknologi MARA, Shah Alam, Malaysia.Search in Google Scholar
Ranasinghe, U., Jefferies, M., Davis, P., & Pillay, M. (2021). Conceptualizing project uncertainty in the context of building refurbishment safety: A systematic review. Buildings, 11(3), pp. 1–15. doi: 10.3390/buildings11030089.RanasingheU.JefferiesM.DavisP.PillayM. (2021). Conceptualizing project uncertainty in the context of building refurbishment safety: A systematic review. , 11(3), pp. 1–15. doi: 10.3390/buildings11030089.Open DOISearch in Google Scholar
Sekaran, U. (2019). Research methods for business: A skill building approach. In: McFadden, P. (ed.), John Wiley & Sons, Inc., New York.SekaranU. (2019). . In: McFaddenP. (ed.), John Wiley & Sons, Inc., New York.Search in Google Scholar
Sezer, A. A. (2017). Factors influencing building refurbishment site managers’ waste management efforts. Journal of Facilities Management, 15(4), pp. 318–334. doi: 10.1108/JFM-10-2016-0041.SezerA. A. (2017). Factors influencing building refurbishment site managers’ waste management efforts. , 15(4), pp. 318–334. doi: 10.1108/JFM-10-2016-0041.Open DOISearch in Google Scholar
Sheth, A. Z., et al. (2010). A framework for refurbishment of health facilities. HaCIRIC International Conference 2010, Edinburgh, UK.https://api.semanticscholar.org/CorpusID:55463651.ShethA. Z., (2010). A framework for refurbishment of health facilities. .https://api.semanticscholar.org/CorpusID:55463651.Search in Google Scholar
Tonder, C. V., Havenga, W., & Visagie, J. (2008). The causes of conflict in public and private Sector’, Managing Global Transitions, 6(4), pp. 373–401.TonderC. V.HavengaW.VisagieJ. (2008). The causes of conflict in public and private Sector’, , 6(4), pp. 373–401.Search in Google Scholar
Tzortzopoulos, P., Kagioglou, M., & Koskela, L. (2020). Lean Construction: Core Concepts and New Frontiers. CRC Press, New York. Available at: https://books.google.com.au/books?id=eTj3DwAAQBAJ.TzortzopoulosP.KagioglouM.KoskelaL. (2020). . CRC Press, New York. Available at: https://books.google.com.au/books?id=eTj3DwAAQBAJ.Search in Google Scholar
Vaux, J. S., & Kirk, W. M. (2014). Relationship conflict in construction management and how it affects performance and profit. Journal of Construction Engineering and Management, 144(6) pp.6. https://doi.org/10.1002/crq.21286VauxJ. S.KirkW. M. (2014). Relationship conflict in construction management and how it affects performance and profit. , 144(6) pp.6. https://doi.org/10.1002/crq.21286Search in Google Scholar
Vaysburd, A. M., Bissonnette, B., & von Fay. K. F. (2014). Compatibility Issues in Design and Implementation of Concrete Repairs and Overlays. Denver, Colorado.VaysburdA. M.BissonnetteB.von FayK. F. (2014). . Denver, Colorado.Search in Google Scholar
Volk, R., Stengel, J., & Schultmann, F. (2014). Building information modeling (BIM) for existing buildings – Literature review and future needs. Automation in Construction, 38, pp. 109–127. doi: 10.1016/j.autcon.2013.10.023.VolkR.StengelJ.SchultmannF. (2014). Building information modeling (BIM) for existing buildings – Literature review and future needs. , 38, pp. 109–127. doi: 10.1016/j.autcon.2013.10.023.Open DOISearch in Google Scholar
Waldron, D. B. (2006) A Survey of Pressure Points in Australian Construction and Infrastructure Projects. Blake Dawson Waldron. North Sydney, Australia.WaldronD. B. (2006) . Blake Dawson Waldron. North Sydney, Australia.Search in Google Scholar
Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017). Investigating the relationship between communication-conflict interaction and project success among construction project teams. International Journal of Project Management, 35(8), pp. 1466–1482. doi: 10.1016/j.ijproman.2017.08.006.WuG.LiuC.ZhaoX.ZuoJ. (2017). Investigating the relationship between communication-conflict interaction and project success among construction project teams. , 35(8), pp. 1466–1482. doi: 10.1016/j.ijproman.2017.08.006.Open DOISearch in Google Scholar
Xu, C. (2011). Uncertainty and construction projects: A new institutional economics perspective. 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, pp. 286–290. doi:10.1109/ICIEEM.2011.6035159.XuC. (2011). Uncertainty and construction projects: A new institutional economics perspective. , pp. 286–290. doi:10.1109/ICIEEM.2011.6035159.Open DOISearch in Google Scholar
Yang, Z. Nguyen, V. T., & Le, P. B. (2018). Knowledge sharing serves as a mediator between collaborative culture and innovation capability: An empirical research. Journal of Business and Industrial Marketing, 33(7), pp. 958–969. doi: 10.1108/JBIM-10-2017-0245.YangZ.NguyenV. T.LeP. B. (2018). Knowledge sharing serves as a mediator between collaborative culture and innovation capability: An empirical research. , 33(7), pp. 958–969. doi: 10.1108/JBIM-10-2017-0245.Open DOISearch in Google Scholar
Yap, J. B. H., Abdul-Rahman, H., & Chen, W. (2017). Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management, 35(7), pp. 1253–1271. doi: 10.1016/J.IJPROMAN.2017.04.010.YapJ. B. H.Abdul-RahmanH.ChenW. (2017). Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication. , 35(7), pp. 1253–1271. doi: 10.1016/J.IJPROMAN.2017.04.010.Open DOISearch in Google Scholar
Yee, P., Fischer, M., & Haymaker, J. (2013) Automated identification of occupant interactions in renovations of occupied buildings. Journal of Information Technology in Construction, 18, pp. 182–213.YeeP.FischerM.HaymakerJ. (2013) Automated identification of occupant interactions in renovations of occupied buildings. , 18, pp. 182–213.Search in Google Scholar
You, J. Chen, Y., Wang, W., & Shi, C. (2018). Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. International Journal of Project Management, 36(5), pp. 795–807. doi: 10.1016/j. ijproman.2018.03.002.YouJ.ChenY.WangW.ShiC. (2018). Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. , 36(5), pp. 795–807. doi: 10.1016/j.ijproman.2018.03.002.Open DOISearch in Google Scholar
Zainudin, H. A. (2010). Research Methodology for Business & Social Scince. 1st edn. UiTM Publication Centre (UPENA), Shah Alam, Malaysia.ZainudinH. A. (2010). . 1st edn. UiTM Publication Centre (UPENA), Shah Alam, Malaysia.Search in Google Scholar
Zolkafli, U., Zakaria, N., Yahya, Z., Ali, A. S., Akashah, F. W., & Othman, M. (2012). Risks in conservation projects. Journal of Design + Built, 5, pp. 1–11.ZolkafliU.ZakariaN.YahyaZ.AliA. S.AkashahF. W.OthmanM. (2012). Risks in conservation projects. , 5, pp. 1–11.Search in Google Scholar