This work is licensed under the Creative Commons Attribution 4.0 International License.
Al-Agele, H. K. B., & Al-Kaabi, S. A. M. (2016). Identification of key factors affecting waste management in life cycle of the construction project by using Delphi technique. Journal of Engineering, 22 (7), pp. 19–34, Available at https://joe.uobaghdad.edu.iq/index.php/main/article/view/187 [accessed 23 November, 2021].Al-AgeleH. K. B.Al-KaabiS. A. M. (2016). Identification of key factors affecting waste management in life cycle of the construction project by using Delphi technique. , 22(7), pp. 19–34, Available at https://joe.uobaghdad.edu.iq/index.php/main/article/view/187 [Accessed 23 November, 2021].Search in Google Scholar
Al-farra, W. A. K. (2009). Analysis of Questionnaire Data by Using the Statistical Program SPSS. World Assembly of Muslim Youth, (Retrieved at: November, 2019).Al-farraW. A. K. (2009). . World Assembly of Muslim Youth, (Retrieved at: November, 2019).Search in Google Scholar
Alkaabi, S. A. M., & Mahjoob, A. M. R. (2022). Identifying the selection criteria of design consultant for Iraqi construction projects. Journal of the Mechanical Behavior of Materials, 31, pp. 290–297. doi: 10.1515/jmbm-2022-0036.AlkaabiS. A. M.MahjoobA. M. R. (2022). Identifying the selection criteria of design consultant for Iraqi construction projects. , 31, pp. 290–297. doi: 10.1515/jmbm-2022-0036.Open DOISearch in Google Scholar
Alkaabi, S. A. M., & Mahjoob, A. M. R. (2023). Identification of key criteria of selecting the delivery system and type of contract in construction projects. In: Yang, X. S., Alkaabi, S. A. M., & Mahjoob, A. M. R. (eds.), Proceedings of Seventh International Congress on Information and Communication Technology, Lecture Notes in Networks and Systems 464. doi: 10.1007/978-981-19-2394-4_14.AlkaabiS. A. M.MahjoobA. M. R. (2023). Identification of key criteria of selecting the delivery system and type of contract in construction projects. In: YangX. S.AlkaabiS. A. M.MahjoobA. M. R. (eds.), 464. doi: 10.1007/978-981-19-2394-4_14.Open DOISearch in Google Scholar
Ataei, Y., Mahmoudi, A., Feylizadeh, M. R., & Li, D. (2020). Ordinal priority approach (OPA) in multiple attribute decision-making. Applied Soft Computing Journal, 86, p. 105893.AtaeiY.MahmoudiA.FeylizadehM. R.LiD. (2020). Ordinal priority approach (OPA) in multiple attribute decision-making. , 86, p. 105893.Search in Google Scholar
Brauers, W. K. M., Zavadskas, E. K., Zenonas Turskis, Z., & Vilutiene, T. (2008). Multi-objective contractor’s ranking by applying the MOORA method. Journal of Business Economics and Management, 9 (4), pp. 245–255. doi: 10.3846/1611-1699.2008.9.245-255.BrauersW. K. M.ZavadskasE. K.Zenonas TurskisZ.VilutieneT. (2008). Multi-objective contractor’s ranking by applying the MOORA method. , 9(4), pp. 245–255. doi: 10.3846/16111699.2008.9.245-255.Open DOISearch in Google Scholar
Cheng, E. W. L., & Li, H. (2004). Contractor selection using the analytic network process. Construction Management and Economics, 22 (10), pp. 1021–1032. doi: 10.1080/0144619042000202852.ChengE. W. L.LiH. (2004). Contractor selection using the analytic network process. , 22(10), pp. 1021–1032. doi: 10.1080/0144619042000202852.Open DOISearch in Google Scholar
CITB. (2015). Industry Guidance for Contractors. The Construction (Design and Management) Regulations. https://www.citb.co.uk/about-citb/partnerships-and-initiatives/construction-design-and-management-regulations-2015/cdm-regulations/CITB. (2015). Industry Guidance for Contractors. . https://www.citb.co.uk/about-citb/partnerships-and-initiatives/construction-design-and-management-regulations-2015/cdm-regulations/Search in Google Scholar
Crane, D., Henderson, E. J., & Chadwick, D. R. (2017). Exploring the acceptability of a ‘limited patient consent procedure’ for a proposed blood-borne virus screening programme: A Delphi consensus building technique. BMJ Open, 7, p. e015373. doi: 10.1136/bmjopen-2016-015373.CraneD.HendersonE. J.ChadwickD. R. (2017). Exploring the acceptability of a ‘limited patient consent procedure’ for a proposed blood-borne virus screening programme: A Delphi consensus building technique. , 7, p. e015373. doi: 10.1136/bmjopen-2016-015373.Open DOISearch in Google Scholar
Elazouni, A. M. (2006). Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132 (12), pp. 1242–1253. doi: 10.1061/(ASCE)07339364(2006)132:12(1242).ElazouniA. M. (2006). Classifying construction contractors using unsupervised-learning neural networks. , 132(12), pp. 1242–1253. doi: 10.1061/(ASCE)07339364(2006)132:12(1242).Open DOISearch in Google Scholar
El-Sayeg, S. M. (2009). Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27 (4), pp. 385–398. doi: 10.1080/01446190902759009.El-SayegS. M. (2009). Multi-criteria decision support model for selecting the appropriate construction management at risk firm. , 27(4), pp. 385–398. doi: 10.1080/01446190902759009.Open DOISearch in Google Scholar
Fong, S. P., & Choi, S. K. (2000). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, pp. 547–557.FongS. P.ChoiS. K. (2000). Final contractor selection using the analytical hierarchy process. , 18, pp. 547–557.Search in Google Scholar
Ginevičius, R., & Vaitkūnaitė, V. (2006). Analysis of organizational culture dimensions impacting performance. Journal of Business Economics and Management, 7 (4), pp. 201–211.GinevičiusR.VaitkūnaitėV. (2006). Analysis of organizational culture dimensions impacting performance. , 7(4), pp. 201–211.Search in Google Scholar
Grisham, T. (2009). The Delphi technique: A method for testing complex and multifaceted topics. International Journal for Managing Projects in Business, 2, pp. 112–130.GrishamT. (2009). The Delphi technique: A method for testing complex and multifaceted topics. , 2, pp. 112–130.Search in Google Scholar
Hasson, F., & Keeney, S. (2011). Enhancing rigour in the Delphi technique research. Technological Forecasting & Social Change, 78, pp. 1695–1704. doi: 10.1007/s12652-020-02395-z.HassonF.KeeneyS. (2011). Enhancing rigour in the Delphi technique research. , 78, pp. 1695–1704. doi: 10.1007/s12652-020-02395-z.Open DOISearch in Google Scholar
Jahan, A., & Edwards, K. L. (2013). VIKOR method for material selection problems with interval numbers and target-based criteria. Materials & Design, 47, p. 759765.JahanA.EdwardsK. L. (2013). VIKOR method for material selection problems with interval numbers and target-based criteria. , 47, p. 759765.Search in Google Scholar
Javed, S. A., Mahmoudi, A., & Liu, S. (2020). Grey absolute decision analysis (GADA) method for multiple criteria group decision making under uncertainty. International Journal of Fuzzy System, 22, pp. 1073–1090.JavedS. A.MahmoudiA.LiuS. (2020). Grey absolute decision analysis (GADA) method for multiple criteria group decision making under uncertainty. , 22, pp. 1073–1090.Search in Google Scholar
Jeleva, A., Pacalo, V., & Dodu-Gugea, L. (2017). The features of decision-making process in international companies. Are companies in control of their own decisions? CSEI Working Paper Series, Issue 5.JelevaA.PacaloV.Dodu-GugeaL. (2017). The features of decision-making process in international companies. Are companies in control of their own decisions?.Search in Google Scholar
Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika, 39(1), pp. 31–36.KaiserH. F. (1974). An index of factorial simplicity. , 39(1), pp. 31–36.Search in Google Scholar
Kashiwagi, D., & Byfield, R. (2002). Selecting the best contractor to get performance: On time, on budget, meeting quality expectations. Journal of Facilities Management, 1. doi: 10.1108/14725960310807872.KashiwagiD.ByfieldR. (2002). Selecting the best contractor to get performance: On time, on budget, meeting quality expectations. , 1. doi: 10.1108/14725960310807872.Open DOISearch in Google Scholar
Lam, K. C., Hu, T. S., & Ng, S. T. (2005). Using the principal component analysis method as a tool in contractor prequalification. Construction Management and Economics, 23 (7), pp. 673–684. doi: 10.1080/01446190500041263.LamK. C.HuT. S.NgS. T. (2005). Using the principal component analysis method as a tool in contractor prequalification. , 23(7), pp. 673–684. doi: 10.1080/01446190500041263.Open DOISearch in Google Scholar
Lam, K. C., Hu, T. S., Ng, S. T., Skitmore, M., & Cheung, S. O. (2010). A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19 (2), pp. 175–188. doi: 10.1080/01446190150505108.LamK. C.HuT. S.NgS. T.SkitmoreM.CheungS. O. (2010). A fuzzy neural network approach for contractor prequalification. , 19(2), pp. 175–188. doi: 10.1080/01446190150505108.Open DOISearch in Google Scholar
Lever, J., Krzywinski, M., & Altman, N. (2017). Points of significance: Principal component analysis. Nature Methods, 14 (7), pp. 641–642.LeverJ.KrzywinskiM.AltmanN. (2017). Points of significance: Principal component analysis. , 14(7), pp. 641–642.Search in Google Scholar
Mahmoudi, A., Deng, X., Javed, S. A., & Yuan, J. (2020). Large-scale multiple criteria decision-making with missing values: Project selection through TOPSIS.OPA. Journal of Ambient Intelligence and Humanized Computing. doi: 10.1007/s12652-020-02649-w.MahmoudiA.DengX.JavedS. A.YuanJ. (2020). Large-scale multiple criteria decision-making with missing values: Project selection through TOPSIS.OPA. . doi: 10.1007/s12652-020-02649-w.Open DOISearch in Google Scholar
Mahmoudi, A., & Javed, S. A. (2021). Performance evaluation of construction sub-contractors using ordinal priority approach. Evaluation and Program Planning. doi: 10.1016/j. evalprogplan.2021.102022.MahmoudiA.JavedS. A. (2021). Performance evaluation of construction sub-contractors using ordinal priority approach. . doi: 10.1016/j. evalprogplan.2021.102022.Open DOISearch in Google Scholar
Mahmoudi, A., Javed, S. A., & Mardani, A. (2021a). Gresilient supplier selection through fuzzy ordinal priority approach: Decision-making in post-COVID era. Operations Management Research. doi: 10.1007/s12063-021-00178-z.MahmoudiA.JavedS. A.MardaniA. (2021a). Gresilient supplier selection through fuzzy ordinal priority approach: Decision-making in post-COVID era. . doi: 10.1007/s12063-021-00178-z.Open DOISearch in Google Scholar
Mahmoudi, A., Deng, X., Javed, S. A., & Zhang, N. (2021b). Sustainable supplier selection in megaprojects: Grey ordinal priority approach. Business Strategy and the Environment, 30(1), pp. 318–339.MahmoudiA.DengX.JavedS. A.ZhangN. (2021b). Sustainable supplier selection in megaprojects: Grey ordinal priority approach. , 30(1), pp. 318–339.Search in Google Scholar
Malone, D. C., Abarca, J., Hansten, P. D., Grizzle, A. J., Armstrong, E. P., & Van Bergen, R. C, et al. (2005). Identification of serious drug-drug interactions: Results of the partnership to prevent drug-drug interactions. The American Journal of Geriatric Pharmacotherapy, 3(2), pp. 65–76.MaloneD. C.AbarcaJ.HanstenP. D.GrizzleA. J.ArmstrongE. P.Van BergenR. C., (2005). Identification of serious drug-drug interactions: Results of the partnership to prevent drug-drug interactions. , 3(2), pp. 65–76.Search in Google Scholar
Mitkus, S., & Trinkūnienė, E. (2008). Reasoned decisions in construction contracts evaluation. Technological and Economic Development of Economy, 14(3), pp. 402–416.MitkusS.TrinkūnienėE. (2008). Reasoned decisions in construction contracts evaluation. , 14(3), pp. 402–416.Search in Google Scholar
Mohammed, S. R., & Jasim, A. J. (2018). Examining the values and principles of agile construction management in Iraqi construction projects. Journal of Engineering, 24(7), pp. 114–133. doi: 10.31026/j.eng.2018.07.08.MohammedS. R.JasimA. J. (2018). Examining the values and principles of agile construction management in Iraqi construction projects. , 24(7), pp. 114–133. doi: 10.31026/j.eng.2018.07.08.Open DOISearch in Google Scholar
Mohamed, S. R., & Majeed, R. A. (2016). Pre-qualification of contractors in Iraq. Applied Research Journal, 2 (2), pp. 77–87.MohamedS. R.MajeedR. A. (2016). Pre-qualification of contractors in Iraq. , 2(2), pp. 77–87.Search in Google Scholar
Naghizadeh Vardin, A., Ansari, R., Khalilzadeh, M., Antucheviciene, J., & Bausys, R. (2021). An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects. Sustainability, 13, p. 6933. doi: 10.3390/su13126933.Naghizadeh VardinA.AnsariR.KhalilzadehM.AntuchevicieneJ.BausysR. (2021). An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects. , 13, p. 6933. doi: 10.3390/su13126933.Open DOISearch in Google Scholar
Ogbeifun, E., Agwa-Ejon, J., Mbohwa, C., & Pretorius, J. H. C. (2016). The Delphi technique: A credible research methodology. In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, March 8-10.OgbeifunE.Agwa-EjonJ.MbohwaC.PretoriusJ. H. C. (2016). The Delphi technique: A credible research methodology. In: , Malaysia, March 8-10.Search in Google Scholar
Othoman, E., Gupta, N., Zhang, B., & Wamuziri, S. (2013). Contractor selection using an integrated AHP and TOPSIS Model. International Journal of Civil and Environmental Engineering, 3 (1), pp. 1116–1126.OthomanE.GuptaN.ZhangB.WamuziriS. (2013). Contractor selection using an integrated AHP and TOPSIS Model. , 3(1), pp. 1116–1126.Search in Google Scholar
Plebankiewicz, E. (2014). Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory. International Journal of Strategic Property Management, 18(3), pp. 307–316. doi: 10.3846/1648715X.2014.943332.PlebankiewiczE. (2014). Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory. , 18(3), pp. 307–316. doi: 10.3846/1648715X.2014.943332.Open DOISearch in Google Scholar
Preetha, R., & Vinila, J. S. (2020). Early diagnose breast cancer with PCA-LDA based FER and neuro-fuzzy classification system. Journal of Ambient Intelligence and Humanized Computing, 12, pp. 7195–7204. doi: 10.1007/s12652-020-02395-z.PreethaR.VinilaJ. S. (2020). Early diagnose breast cancer with PCA-LDA based FER and neuro-fuzzy classification system. , 12, pp. 7195–7204. doi: 10.1007/s12652-020-02395-z.Open DOISearch in Google Scholar
Quartey-Papafio, T. K., Shajedul, I., & Dehaghani, A. R. (2021). Evaluating suppliers for healthcare centre using ordinal priority approach. Management Science and Business Decisions, 1 (1), pp. 5–11. doi: 10.52812/msbd.12.Quartey-PapafioT. K.ShajedulI.DehaghaniA. R. (2021). Evaluating suppliers for healthcare centre using ordinal priority approach. , 1(1), pp. 5–11. doi: 10.52812/msbd.12.Open DOISearch in Google Scholar
Ralitsa, B., Tolson, H., & Cole, B. R. (2005). Stability of response characteristics of a Delphi panel: Application of bootstrap data expansion. BMC Medical Research Methodology, 5(37). doi: 10.1186/1471-2288-5-37.RalitsaB.TolsonH.ColeB. R. (2005). Stability of response characteristics of a Delphi panel: Application of bootstrap data expansion. , 5(37). doi: 10.1186/1471-2288-5-37.Open DOISearch in Google Scholar
Razi, P. Z., Ramli, N. I., Ali, M. I., & Ramadhansyah, P. J. (2019). Selection of contractor by using analytical hierarchy process (AHP). IOP Conference Series: Materials Science and Engineering, 712(2020), p. 012014. IOP Publishing. doi: 10.1088/1757-899X/712/1/012014, (NCWE & ISSCE).RaziP. Z.RamliN. I.AliM. I.RamadhansyahP. J. (2019). Selection of contractor by using analytical hierarchy process (AHP). , 712(2020), p. 012014.IOP Publishing. doi:10.1088/1757-899X/712/1/012014, (NCWE & ISSCE).Open DOISearch in Google Scholar
Ringnér, M. (2008). What is principal component analysis. Nature Biotechnology, 26 (3), pp. 303–304.RingnérM. (2008). What is principal component analysis. , 26(3), pp. 303–304.Search in Google Scholar
Sadeghi, M., Mahmoudi, A., & Deng, X. (2021). Adopting distributed ledger technology for the sustainable construction industry: Evaluating the barriers using ordinal priority approach. Environmental Science and Pollution Research. doi: 10.1007/s11356-021-16376-y.SadeghiM.MahmoudiA.DengX. (2021). Adopting distributed ledger technology for the sustainable construction industry: Evaluating the barriers using ordinal priority approach. . doi: 10.1007/s11356-021-16376-y.Open DOISearch in Google Scholar
Shajedul, I. (2021). Evaluation of low-carbon sustainable technologies in agriculture sector through grey ordinal priority approach. International Journal of Grey Systems, 1(1), pp. 5–26. doi: 10.52812/ijgs.3.ShajedulI. (2021). Evaluation of low-carbon sustainable technologies in agriculture sector through grey ordinal priority approach. , 1(1), pp. 5–26. doi: 10.52812/ijgs.3.Open DOISearch in Google Scholar
Sönmez, M., Yang, J. B., & Holt, G. D. (2001). Addressing the contractor selection problem using an evidential reasoning approach. Engineering. Construction and Architectural Management, 8 (3), pp. 198–210.SönmezM.YangJ. B.HoltG. D. (2001). Addressing the contractor selection problem using an evidential reasoning approach. , 8(3), pp. 198–210.Search in Google Scholar
Wainwright, P., Gallagher, A., Tompsett, H., & Atkins, C. (2010). The use of vignettes within a Delphi exercise: A useful approach in empirical ethics? Journal of Medical Ethics, 36, pp. 656–660.WainwrightP.GallagherA.TompsettH.AtkinsC. (2010). The use of vignettes within a Delphi exercise: A useful approach in empirical ethics?, 36, pp. 656–660.Search in Google Scholar
Welding, A. K. (2013). Project evaluation: Lessons learned vs. Delphi method. Thesis of 6 ECTS credits submitted to the School of Science and Engineering at Reykjavík University in partial fulfillment of the requirements for the degree of Master of Project Management in MPM.WeldingA. K. (2013). Project evaluation: Lessons learned vs. Delphi method. .Search in Google Scholar
Yongtao, T. (2008). Contractor’s competitiveness and competitive strategy in Hong Kong. The Hong Kong Polytechnic University Department of Building and Real Estate.YongtaoT. (2008). . The Hong Kong Polytechnic University Department of Building and Real Estate.Search in Google Scholar
Zagorskas, J., & Turskis, Z. (2006). Multi-attribute model for estimation of retail centres influence on the city structure. Kaunas city case study. Technological and Economic Development of Economy, 12(4), pp. 347–352.ZagorskasJ.TurskisZ. (2006). Multi-attribute model for estimation of retail centres influence on the city structure. Kaunas city case study. , 12(4), pp. 347–352.Search in Google Scholar
Zavadskas, E. K., & Kaklauskas, A. (1996). Determination of an efficient contractor by using the new method of multicriteria assessment. In: Langford, D. A., & Retik, A., CIB W 65, (eds.), International Symposium for the Organisation and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. London, Weinheim, New York, Tokyo, Melbourne, Madras. E and FN SPON 2, London, pp. 94–104.ZavadskasE. K.KaklauskasA. (1996). Determination of an efficient contractor by using the new method of multicriteria assessment. In: LangfordD. A.RetikA.CIB W 65, (eds.),. London, Weinheim, New York, Tokyo, Melbourne, Madras. E and FN SPON 2, London,pp.94–104.Search in Google Scholar
Zavadskas, E. K., Kaklauskas, A., Turskis, Z., & Tamošaitienÿe, J. (2009). Multi-attribute decision-making model by applying grey numbers. Informatica, 20 (2), pp. 305–320.ZavadskasE. K.KaklauskasA.TurskisZ.TamošaitienÿeJ. (2009). Multi-attribute decision-making model by applying grey numbers. , 20(2), pp. 305–320.Search in Google Scholar
Zavadskas, E. K., & Vilutiene, T. (2006). A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria. Building and Environment, 41(5), pp. 621–632.ZavadskasE. K.VilutieneT. (2006). A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria. , 41(5), pp. 621–632.Search in Google Scholar
Zavadskas, E. K., Vilutiene, T., Turskis, Z., & Tamosaitiene, J. (2010). Contractor selection for construction works by applying SAW-G and TOPSIS Grey techniques. Journal of Business Economics and Management, 11 (1), pp. 34–55.ZavadskasE. K.VilutieneT.TurskisZ.TamosaitieneJ. (2010). Contractor selection for construction works by applying SAW-G and TOPSIS Grey techniques. , 11(1), pp. 34–55.Search in Google Scholar