Anchorage length of patented wire cables in prestressed bridge girders
, , , , oraz
30 gru 2021
O artykule
Data publikacji: 30 gru 2021
Zakres stron: 92 - 96
DOI: https://doi.org/10.2478/kom-2021-0012
Słowa kluczowe
© 2021 A. Svoboda et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Svoboda, A.
Brno University of Technology, Faculty of Civil Engineering, Institute of Concrete and Masonry StructuresBrno
Klusáček, L.
Brno University of Technology, Faculty of Civil Engineering, Institute of Concrete and Masonry StructuresBrno
Nečas, R.
Brno University of Technology, Faculty of Civil Engineering, Institute of Concrete and Masonry StructuresBrno
Koláček, J.
Brno University of Technology, Faculty of Civil Engineering, Institute of Concrete and Masonry StructuresBrno
Strnad, J.
Brno University of Technology, Faculty of Civil Engineering, Institute of Concrete and Masonry StructuresBrno
Olšák, M.
Brno University of Technology, Faculty of Civil Engineering, Institute of Concrete and Masonry StructuresBrno