Otwarty dostęp

The impact of the construction of the new 400 kV transmission power lines between Slovakia and Hungary on the cross-border transmissions


Zacytuj

[1] SEPSČEPS, MAVIR, PSE, Unplanned flows in the CEE region, the case study, 2013.Search in Google Scholar

[2] Available on internet [online 28.6.2019]:.Search in Google Scholar

[3] https://www.pse.pl/documents/20182/51490/Unplanned_flows_in_the_CEE_region/.pdf/44c6534e-a30d-4f06-9f7e-cb941b0ccf40.Search in Google Scholar

[4] SEPS a.s. Ten-year network development plan for the period 2018-2027, 2019.Search in Google Scholar

[5] Available on internet [online 28.6.2019].Search in Google Scholar

[6] https://www.sepsas.sk/Dokumenty/ProgRozvoj/2018/08/DPR_PS_2018_2027_en,pdf.Search in Google Scholar

[7] SEPS a.s. SEPS Development program for the period 2019-2028, internal unpublished SEPS company document, 2018.Search in Google Scholar

[8] Z. Blahutová, “The phenomenon of unplanned flows”, Journal Slovak power engineering (Slovenská energetika), vol. 37, pp. 4-5.Search in Google Scholar

[9] L. Pavlov, L. Skurcak, J. Chovanec, and J. Altus, “Impact of impedance unbalance on the e ciency of electricity transmission distribution”, Journal of Electrical Engineering.Search in Google Scholar

[10] L. Pavlov, L. Skurcak, J. Chovanec, and J. Altus, ] vol. 68 no. 6, pp. 492-495, 2017, DOI: 10, 1515/jee-2017-0086,, ISSN: 1335-3632.10.1515/jee-2017-0086Search in Google Scholar

[11] E. Dvorský, L. Raková, and P. Hejtmánková, “Grid frequency regulation by recycling electrical energy in flywheels”, Proceedings of the 9th International Scientific Symposium on Electrical Power Engineering (ELEKTROENERGETIKA 2017), Košice: Technical University of Košice 2017, pp. 159-164, ISBN: 978-80-553-3195-9.Search in Google Scholar

[12] Z. Martínek, T. Klor, and J. Holý, “The reliability operation of the complicated networks at the electrical system”, Proceedings of the 8th International Scientific Symposium on Electrical Power Engineering (ELEKTROENERGETIKA 2015), Košice: Technical University of Košice 2015, pp. 515-518, ISBN: 978-80-553-2187-5.Search in Google Scholar

[13] Project: Power Line 2x 400 kV Gabčíkovo (SK), Gönyű(HU)-Vel’ký Ďur (SK), Available on internet [online 28.6.2019]: http://www.mhsr.sk/energetika/medzinarodna-spolupraca/projekty-spolocneho-zaujmu-pci/elektroenergetika/3161-vedenie-2-x-400-kv-gabcikovo-sk-goenyu-hu-velky-dur-sk.Search in Google Scholar

[14] Project: Power Line 2x 400 Kv Gabčíkovo (sk) and Gönyű PROJECT: Power line 2x 400 kV Rimavská Sobota (SK)-Sajóivánka (HU).Search in Google Scholar

[15] Project: Power Line 2x 400 Kv Gabčíkovo (sk) and Gönyű, Available on internet [online 28.6.2019]: http://www.mhsr.sk/energetika/medzinarodna-spolupraca/projekty-spolocneho-zaujmu-pci/elektroenergetika/317-vedenie-2-x-400-kvrimavska-sobota-sk-sajoivanka-hu.Search in Google Scholar

[16] Project: Power Line 2x 400 Kv Gabčíkovo (sk) and Gönyű SEPS a.s. Dispatching instruction no. 2/6, Procedure for realization of reconfigurations in the TS SR, internal unpublished SEPS company document, 2017.Search in Google Scholar

eISSN:
1339-309X
Język:
Angielski
Częstotliwość wydawania:
6 razy w roku
Dziedziny czasopisma:
Engineering, Introductions and Overviews, other