[Amasaka, K., 2012. Science TQM, New Quality Management Principle, The Quality Management Strategy of Toyota Introduction, Bentham Sc., U Arab Emirates.10.2174/97816080528201120101]Search in Google Scholar
[Borkowski, S., 2012. BOST Method as the Instrument of Assessment Process Functioning according to Toyota Principles, University of Maribor, Maribor.]Search in Google Scholar
[Borkowski, S., 2016. Scientific Potential of Toyotarity and BOST Method, Polish Quality Institute, Warsaw.]Search in Google Scholar
[Borkowski, S., Jagusiak-Kocik, M., Ingaldi, M., 2014. Evaluation of the Manufacturing of Components for Combine Harvesters Using Bost Method, 23nd International Conference on Metallurgy and Materials METAL, Brno.]Search in Google Scholar
[Borkowski, S., Ulewicz, R., 2009. Instruments of Production Processes Improvement, PTM, Warsaw.]Search in Google Scholar
[Fouad, R.H., Mukattash, A., 2010. Statistical Process Control Tools: A Practical guide for Jordanian Industrial Organizations, Jordan Journal of Mechanical and Industrial Engineering, Volume 4, Number 6, 693-700.]Search in Google Scholar
[Gao, S., Low, S.P., 2015. Toyota way style human resource management in large Chinese construction firms. A qualitative study, International Journal of Construction Management 15(1), 17–32.10.1080/15623599.2015.1012139]Search in Google Scholar
[Ignaszak, Z., Sika, R., 2012. Specificity of SPC Procedures Application in Foundry in Aspect of Data Acquisition and Data Exploration, Archives of Foundry Engineering, Vol. 12, Issue 4, 65-70. DOI: 10.2478/v10266-012-0108-810.2478/v10266-012-0108-8]Search in Google Scholar
[Knop, K., 2018. Statistical Control of the Production Process of Rolled Products, Production Engineering Archives, 20(2018), 26-31. DOI: 10.30657/pea.2018.20.0610.30657/pea.2018.20.06]Search in Google Scholar
[Knop, K., Mielczarek, K., 2018. Assessment of Production Processes Functioning in the Case of Air Bag Production, MATEC Web Conf. 183, 04009. DOI: 10.1051/matecconf/20181830400910.1051/matecconf/201818304009]Search in Google Scholar
[Liker, J.K., Franz, J., 2011. The Toyota Way to continuous improvement, McGraw Hill.]Search in Google Scholar
[Liker, J.K., Hoseus, M., 2008. Toyota Culture: The Heart and Soul of the Toyota Way. McGraw-Hill, New York.]Search in Google Scholar
[Mielczarek, K., 2015. Factors Describing the Concept of Plastics Company Development, Production Engineering Archives, 8/3(2015), 32-35. DOI: DOI: 10.30657/pea.2015.08.0810.30657/pea.2015.08.08]Search in Google Scholar
[Selejdak, J., 2015. Use of the Toyota Management Principles for Evaluation of the Company’s Mission, Production Engineering Archives, 1/1(2013), 13-15. DOI: 10.30657/pea.2013.01.0410.30657/pea.2013.01.04]Search in Google Scholar
[Uçurum, M., Çolak, M., Çınar, M., Dışpınar, D., 2016. Implementation of Statistical Process Control (SPC) Techniques as Quality Control in Cast Iron Part Production, Journal of Engineering Precious Research and Application, Vol. 1, Issue 3, 14-24.]Search in Google Scholar
[Wheeler, D., 2000. Understanding Variation: The Key to Managing Chaos, 2 Revised Edition, SPC Press.]Search in Google Scholar