This work is licensed under the Creative Commons Attribution 4.0 International License.
HASAN, M.F. – MOHAMMED, S.R.: Factors affecting time and cost trade-off in multiple construction projects. Archives of Civil Engineering. 2022;68(2). https://doi.org/10.24425/ace.2022.140658Search in Google Scholar
MELIK, S.: Cash flow analysis of construction projects using fuzzy set theory. (Master’s thesis, Middle East Technical University), 2010.Search in Google Scholar
RASHED, S.M – MAHJOOB, A.M.: Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model, Journal of Engineering. 2014;20(09):10-29.Search in Google Scholar
TATAR, B.V. – PATIL, R.S.: Optimization tools for time cost trade off applicable in construction project management. International Journal of Science, Technology and Management. 2015;4(1):181-187.Search in Google Scholar
HASAN, M.F.: Financial Resource Optimization for Budget Deficit in Multi-Construction Projects (PhD thesis, University of Baghdad, Civil Engineering Department), 2023.Search in Google Scholar
ALGHAZI, A. – ELAZOUNI, A. – SELIM, S.: Improved genetic algorithm for finance-based scheduling. Journal of Computing in Civil Engineering. 2013;27(4):379 -394. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000227Search in Google Scholar
AZIZ, R.F.: Optimizing strategy for repetitive construction projects within multi-mode resources. Alexandria Engineering Journal. 2013;52(1):67-81. https://doi.org/10.1016/j.aej.2012.11.003Search in Google Scholar
BASHA, I.M. – IBRAHIM, A.H. – ABD EL-AZIM, A.N.: Profitability optimization of construction project using genetic algorithm cash flow model. American Journal of Civil Engineering and Architecture. 2016;4(1):17-27. https://doi.org/10.12691/ajcea-4-1-3Search in Google Scholar
TOĞAN, V. – EIRGASH, M.A.: Time-cost trade-off optimization of construction projects using teaching learning based optimization. KSCE Journal of Civil Engineering. 2019;23(1):10-20. https://doi.org/10.1007/s12205-018-1670-6Search in Google Scholar
CAJZEK, R. – KLANŠEK, U.: Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management. 2019;26(10):2474 -2508. https://doi.org/10.1108/ECAM-01-2019-0013Search in Google Scholar
ALAVIPOUR, S.R – ARDITI, D.: Time-cost tradeoff analysis with minimized project financing cost. Automation in Construction. 2019;98:110-121. https://doi.org/10.1016/j.autcon.2018.09.009Search in Google Scholar
HE, W. – SHI, Y. – KONG, D.: Optimization model calculation of construction cost and time based on genetic algorithm. IOP Conference Series: Earth and Environmental Science; 2019;242(6):1-7. https://doi.org/10.1088/1755-1315/242/6/062044Search in Google Scholar
AYMAN ABDELRAHMAN MOSTAFA HUSSEIN, S.: Optimization of Cash Flow and Financing Costs in Construction Projects (Master’s thesis, The American University in Cairo. AUC Knowledge Fountain), 2021.Search in Google Scholar
HASAN, M.F – MOHAMMED, S.R.: Time and finance optimization model for multiple construction projects using genetic algorithm. Journal of the Mechanical Behavior of Materials. 2022;31(1):267-281. https://doi.org/10.1515/jmbm-2022-0032Search in Google Scholar
ELAZOUNI, A – ABIDO, M.: Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio. Automation in Construction. 2011; 20(7):755-766. https://doi.org/10.1016/j.autcon.2011.03.010Search in Google Scholar
SHIHA, A. – HOSNY, O.: A multi-objective model for enterprise cash flow management. In CSCE Annual Conference. 2019:1-10.Search in Google Scholar
NELLES, O.: Nonlinear Local Optimization. In: Nonlinear System Identification. Springer, Cham. 2020: 93-128 https://doi.org/10.1007/978-3-030-47439-3_4Search in Google Scholar
BOGGS, P. T– TOLLE, J. W.: Sequential Quadratic Programming. Acta Numerica. 1995; (4):1-51. https://doi.org/10.1017/S0962492900002518Search in Google Scholar
GILL, P. E – MURRAY, W – SAUNDERS, M. A.: SNOPT: An SQP Algorithm for Large-scale Constrained Optimization. SIAM Review. 2005; 47(1):99-131. https://doi.org/10.1137/S003614450444609Search in Google Scholar
YENGUI, F. – LABRAK, L. – FRANTZ F, – DAVIOT, R. – ABOUCHI, N. – O’CONNOR, I.: A hybrid GA-SQP algorithm for analog circuits sizing. Circuits and Systems Journal. 2012;3(2);146-152. https://doi.org/10.4236/cs.2012.32019Search in Google Scholar
DEHDARI, V. – OLIVER, D.S.: Sequential quadratic programming for solving constrained production optimization–case study from Brugge field. SPE journal. 2012;17(3):874-884. https://doi.org/10.2118/141589-PASearch in Google Scholar