Zacytuj

Adjei, E. A., Fugar, F. D. K., Adinyira, E., Edwards, D. J., & Parn, E. A. (2018). Exploring the Significant Cash Flow Factors Influencing Building Projects Profitability in Ghana. International Journal of Construction Engineering and Management, 7(1), 35–46. Search in Google Scholar

Alshebani, M. N. & Wedawatta, G. (2014). Making the Construction Industry Resilient to Extreme Weather: Lessons from Construction in Hot Weather Conditions. Procedia Economics and Finance, 18, 635–642. https://doi.org/10.1016/s2212-5671(14)00985-x Search in Google Scholar

Atout, M. M. (2020). Importance of Project Management Implications in Construction Industry Projects. BULMIM Journal of Management and Research, 5(1), 17–27. https://doi.org/10.5958/2455-3298.2020.00003.3 Search in Google Scholar

Bayhan, H. G., Demirkesen, S., & Jayamanne, E. (2019). Enablers and Barriers of Lean Implementation in Construction Projects. IOP Conference Series: Materials Science and Engineering, 471(2), 02202. https://doi.org/10.1088/1757-899X/471/2/022002 Search in Google Scholar

Buba, S., & Tanko, B. (2017). Project Leadership and Quality Performance of Construction Projects. International Journal of Built Environment and Sustainability, 4(2). https://doi.org/10.11113/ijbes.v4.n2.177 Search in Google Scholar

Doloi, H. (2013). Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of Construction Engineering and Management, 139(3), 267–279. https://doi.org/10.1061/(asce)co.1943-7862.0000621 Search in Google Scholar

El-Sawalhi, N., & Mahdi, M. (2015). Influence of Climate Change on the Lifecycle of Construction Projects at Gaza Strip. Journal of Construction Engineering and Project Management, 5(2), 1–10. https://doi.org/10.6106/jcepm.2015.5.2.001 Search in Google Scholar

Enshassi, A., Saleh, N., & Mohamed, S. (2021). Barriers to the application of lean construction techniques concerning safety improvement in construction projects. International Journal of Construction Management, 21(10), 1044–1060. https://doi.org/10.1080/15623599.2019.1602583 Search in Google Scholar

Gasik, S. (2015). An Analysis of Knowledge Management in PMBOK® Guide. PM World Journal, IV(I), 1–13. http://www.pmworldjournal.net/ Search in Google Scholar

Jadhav, O. U.,& Bhirud, A. N. (2015). An Analysis Of Causes and Effects Of Change Orders On Construction Projects In Pune. International Journal of Engineering Research and General Science, 3(6), 795–799. Search in Google Scholar

Nawaz, A., Chen, J., & Su, X. (2023). Factors in critical management practices for construction projects waste predictors to C&DW minimization and maximization. Journal of King Saud University – Science, 35(2), 102512. https://doi.org/10.1016/j.jksus.2022.102512 Search in Google Scholar

Olsson, N. O. E., Sørensen, A. Ø., & Leikvam, G. (2015). On the Need for Iterative Real Estate Project Models – Applying Agile Methods in Real Estate Developments. Procedia Economics and Finance, 21, 524–531. https:/doi.org/10.1016/s2212-5671(15)00208-7 Search in Google Scholar

Oppong, G. D., Chan, A. P. C., & Dansoh, A. (2017). A review of stakeholder management performance attributes in construction projects. International Journal of Project Management, 35(6), 1037–1051. https:/doi.org/10.1016/j.ijproman.2017.04.015 Search in Google Scholar

Markute, M., Pradit, P., Rishikesh, P., & Bhagatsing, R. (2016). Study of the Leadership skill in Construction Project. International Journal of Science Technology and Management, 5(3), 507–515. https:/doi.org/10.13140/RG.2.2.14669.97761 Search in Google Scholar

Pheng, L. S., & Chuan, Q. T. (2006). Environmental factors and work performance of project managers in the construction industry. International Journal of Project Management, 24(1), 24–37. https:/doi.org/10.1016/j.ijproman.2005.06.001 Search in Google Scholar

Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371–381. https:/doi.org/10.1080/15623599.2018.1435234 Search in Google Scholar

Salunkhe, A. A., & Patil, R. S. (2014). Effect of Construction Delays on Project Time Overrun: Indian Scenario. International Journal of Research in Engineering and Technology, 3(1), 543–547. https:/doi.org/10.15623/ijret.2014.0301091 Search in Google Scholar

Sanchaniya, R. J., Kundziņa, A., Thomas, C. G., Geipele, I., & Naimavičienė, J. (2023a). The effect of external and internal factors on management effectiveness within Indian construction companies. Baltic Journal of Real Estate Economics and Construction Management, 11(1), 270–288. https://doi.org/10.2478/bjreecm-2023-0017 Search in Google Scholar

Sanchaniya, R. J., Asif, S. A. S., & Geipele, I. (2023b). Role of Real Estate Management Firms Toward Sustainability in India. Civil and Environmental Engineering, 19(2), 511–519. https:/doi.org/10.2478/cee-2023-0046 Search in Google Scholar

Sanchaniya, R., Somrajan, N., & Geipele, I. (2023c). Problems and Possible Solutions of Post-Disaster Housing Reconstruction Projects in India. Baltic Journal of Real Estate Economics and Construction Management, 11(1), 37–47. https://doi.org/10.2478/bjreecm-2023-0004 Search in Google Scholar

Shrivas, A., & Singla, H. K. (2022). Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), 1455–1463. https://doi.org/10.1080/15623599.2020.1728486 Search in Google Scholar

Suleiman, A., Almasaeid, H., Hussein, N., & Abahre, J. (2023). Addressing the causes and effects of poor communication in the Jordanian construction industry: A study on Improving project performance. Civil and Environmental Engineering, 19(1), 156–166. https://doi.org/10.2478/cee-2023-0014 Search in Google Scholar

Tabassi, A. A., Ramli, M., & Abu Bakar, A. H. (2011). Training and Development of Workforces in Construction Industry. International Journal of Academic Research, 3(4), 509–516. Search in Google Scholar

Thanappan, S., Solomon, M. T., Tariku, S., Abdulahi, T., & Abede S. (2020). Stabilization on expansive soil for civil engineering projects. International Journal of Scientific and Technology Research, 9(2), 5714–5718. Search in Google Scholar

Tupenaite, L., Lill, I., Geipele, I., & Naimaviciene, J. (2017). Ranking of Sustainability Indicators for assessment of the new housing development Projects: Case of the Baltic States. Resources, 6(4), 55. https://doi.org/10.3390/resources6040055 Search in Google Scholar

Zimon, G., Nakonieczny, J., Chudy-Laskowska, K., Wójcik-Jurkiewicz, M., & Kochański, K. (2021). An analysis of the financial liquidity management strategy in construction companies operating in the Podkarpackie province. Risks, 10(1), 5. https://doi.org/10.3390/risks10010005 Search in Google Scholar