Identification of Delay Causing Actor in the Indian Real Estate Project: an AHP-Based Approach


Zacytuj

Aitken, A., & Paton, R. A. (2017). The “T-Shaped Buyer”: A transactional perspective on supply chain relationships. Journal of Purchasing and Supply Management, 23(4), 280-289. https://doi.org/10.1016/j.pursup.2017.03.00110.1016/j.pursup.2017.03.001Open DOISearch in Google Scholar

Akintoye, A., & Main, J. (2007). Collaborative relationships in construction: the UK contractors’ perception. Engineering, Construction and Architectural Management, 14(6), 597-617. https://doi.org/10.1108/0969998071082904910.1108/09699980710829049Open DOISearch in Google Scholar

Ali Kazmi, S. (2017). Impact of Natural, Man-made Risks and Stakeholders Relationship on effectiveness of Supply Chain Management in Developing Countries. KTH Royal Institute of Technology. Retrieved from http://www.diva-portal.se/smash/get/diva2:1084790/FULLTEXT01.pdfSearch in Google Scholar

Arantes, A., Ferreira, L. M. D. F., & Costa, A. A. (2015). Is the construction industry aware of supply chain management? The Portuguese contractors’ perspective. Supply Chain Management: An International Journal, 20(4), 404-414. https://doi.org/10.1108/SCM-06-2014-020710.1108/SCM-06-2014-0207Open DOISearch in Google Scholar

Arantes, A., Ferreira, L. M. D. F., & Kharlamov, A. A. (2014). Application of a Purchasing Portfolio Model in a Construction Company in Two Distinct Markets. Journal of Management in Engineering, 30(5), 04014020. https://doi.org/10.1061/(ASCE)ME.1943-5479.000029010.1061/(ASCE)ME.1943-5479.0000290Open DOISearch in Google Scholar

Ardeshir, A., Amiri, M., Ghasemi, Y., & Errington, M. (2014). Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis. International Journal of Civil Engineering, 12(4), 396-412. Retrieved from http://ijce.iust.ac.ir/article-1-878-en.pdfSearch in Google Scholar

Babaeian Jelodar, M., Yiu, T. W., & Wilkinson, S. (2017). Assessing Contractual Relationship Quality: Study of Judgment Trends among Construction Industry Participants. Journal of Management in Engineering, 33(1), 04016028. https://doi.org/10.1061/(ASCE)ME.1943-5479.000046110.1061/(ASCE)ME.1943-5479.0000461Open DOISearch in Google Scholar

Barman, A., & Charoenngam, C. (2017). Decisional Uncertainties in Construction Projects as a Cause of Disputes and Their Formal Legal Interpretation by the Courts: Review of Legal Cases in the United Kingdom. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(3), 04517011. https://doi.org/10.1061/(ASCE)LA.1943-4170.000022210.1061/(ASCE)LA.1943-4170.0000222Search in Google Scholar

Burger, P., & Hawkesworth, I. (2011). How to Attain Value for Money. Comparing PPP and traditional infrastructure public procurement. OECD Journal on Budgeting, 11(1), 91-146. https://doi.org/10.1787/budget-11-5kg9zc0pvq6j10.1787/budget-11-5kg9zc0pvq6jOpen DOISearch in Google Scholar

Caridi, M., Moretto, A., Perego, A., & Tumino, A. (2014). The benefits of supply chain visibility: A value assessment model. International Journal of Production Economics, 151, 1-19. https://doi.org/10.1016/j.ijpe.2013.12.02510.1016/j.ijpe.2013.12.025Open DOISearch in Google Scholar

Cerchione, R., & Esposito, E. (2016). A systematic review of supply chain knowledge management research: State of the art and research opportunities. International Journal of Production Economics, 182, 276-292. https://doi.org/10.1016/j.ijpe.2016.09.00610.1016/j.ijpe.2016.09.006Open DOISearch in Google Scholar

Dang, C. N., & Le-Hoai, L. (2016). Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), 17-32. https://doi.org/10.1108/JEDT-04-2013-002910.1108/JEDT-04-2013-0029Open DOISearch in Google Scholar

Daniel, E. I., Pasquire, C., Dickens, G., & Ballard, H. G. (2017). The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), 407-425. https://doi.org/10.1108/ECAM-07-2015-010910.1108/ECAM-07-2015-0109Open DOISearch in Google Scholar

Dawson, B. (2008). The new world of value transfer ppps. Infrastructure: Policy, Finance and Investment, 12-13.Search in Google Scholar

Deep, S., Asim, M., & Ahmad, S. A. (2017a). Earned Value based Liability Calculation Algorithm for Schedule Delays in Construction Projects. Indian Journal of Science and Technology, 10(15), 1-10. https://doi.org/10.17485/ijst/2017/v10i15/11032410.17485/ijst/2017/v10i15/110324Open DOISearch in Google Scholar

Deep, S., Asim, M., & Khan, M. K. (2017b). Review of Various Delay Causing Factors and Their Resolution by Application of Lean Principles in India. Baltic Journal of Real Estate Economics and Construction Management, 5(1), 101-117. https://doi.org/10.1515/bjreecm-2017-000810.1515/bjreecm-2017-0008Open DOISearch in Google Scholar

Deep, S., Gajendran, T., Jefferies, M., & Davis, P. (2018, April). An analytical literature review of risks in collaborative procurement. Paper presented at the The Royal Institution of Chartered Surveyors - Annual Construction, Building and Real Estate Research Conference, London, UK. Retrieved from http://www.rics.org/Documents/COBRA%202018/128-Deep-AN_ANALYTICAL_LITERATURE_REVIEW_OF_RISKS_IN_COLLABORATIVE_PROCUREMENT-220418-kp.pdfSearch in Google Scholar

Deep, S., Jefferies, M., & Gajendran, T. (2017). Resolving constraints in collaborative procurement through the lens of a portfolio purchasing model: A traditional literature review. Paper presented at the International Symposium on Frontiers of Infrastructure Finance, Indian Institute of Technology, Kharagpur, India.Search in Google Scholar

Deep, S., Khan, M. B., Ahmad, S., & Saeed, A. (2017e). A study of various factors affecting contractor's performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), 28-33. Retrieved from http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=2Search in Google Scholar

Deep, S., Singh, D., & Ahmad, S. A. (2017). A Review of Contract Awards to Lowest Bidder in Indian Construction Projects via Case Based Approach. Open Journal of Business and Management, 05(01), 159-168. https://doi.org/10.4236/ojbm.2017.5101510.4236/ojbm.2017.51015Open DOISearch in Google Scholar

Dixit, V., Chaudhuri, A., & Srivastava, R. K. (2017). Procurement scheduling in engineer procure construct projects: a comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), 189-206. https://doi.org/10.1080/15623599.2017.131475010.1080/15623599.2017.1314750Open DOISearch in Google Scholar

Donato, M., Ahsan, K., & Shee, H. (2015). Resource dependency and collaboration in construction supply chain: literature review and development of a conceptual framework. International Journal of Procurement Management, 8(3), 344-364. https://doi.org/10.1504/IJPM.2015.06915710.1504/IJPM.2015.069157Open DOISearch in Google Scholar

Dubois, A., & Gadde, L.-E. (2002). The construction industry as a loosely coupled system: implications for productivity and innovation. Construction Management and Economics, 20(7), 621-631. https://doi.org/10.1080/0144619021016354310.1080/01446190210163543Open DOISearch in Google Scholar

Edwards, D. J., Owusu-Manu, D.-G., Baiden, B., Badu, E., & Love, P. E. (2017). Financial distress and highway infrastructure delays. Journal of Engineering, Design and Technology, 15(1), 118-132. https://doi.org/10.1108/JEDT-02-2016-000610.1108/JEDT-02-2016-0006Open DOISearch in Google Scholar

Egan, J. (2014). Rethinking construction, construction task force report for department of the environment, transport and the regions. ed: HMSO, London.Search in Google Scholar

Fearne, A., & Fowler, N. (2006). Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation. Supply Chain Management: An International Journal, 11(4), 283-287. https://doi.org/10.1108/1359854061067172510.1108/13598540610671725Open DOISearch in Google Scholar

Ferreira, L. M. D. F., Arantes, A., & Kharlamov, A. A. (2015). Development of a purchasing portfolio model for the construction industry: an empirical study. Production Planning & Control, 26(5), 377-392. https://doi.org/10.1080/09537287.2014.90667910.1080/09537287.2014.906679Open DOISearch in Google Scholar

Fulford, R., & Standing, C. (2014). Construction industry productivity and the potential for collaborative practice. International Journal of Project Management, 32(2), 315-326. https://doi.org/10.1016/j.ijproman.2013.05.00710.1016/j.ijproman.2013.05.007Open DOISearch in Google Scholar

Ghadge, A., Dani, S., Ojha, R., & Caldwell, N. (2017). Using risk sharing contracts for supply chain risk mitigation: A buyer-supplier power and dependence perspective. Computers & Industrial Engineering, 103, 262-270. https://doi.org/10.1016/j.cie.2016.11.03410.1016/j.cie.2016.11.034Open DOISearch in Google Scholar

Hampton, G., Baldwin, A. N., & Holt, G. (2012). Project delays and cost: stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), 73-91. https://doi.org/10.1108/1366438121121105510.1108/13664381211211055Open DOISearch in Google Scholar

Janipha, N. A. I., Ahmad, N., & Ismail, F. (2015). Clients’ Involvement in Purchasing Process for Quality Construction Environment. Procedia - Social and Behavioral Sciences, 168, 30-40. https://doi.org/10.1016/j.sbspro.2014.10.20710.1016/j.sbspro.2014.10.207Open DOISearch in Google Scholar

Ju, Q., Ding, L., & Skibniewski, M. J. (2017). Optimization strategies to eliminate interface conflicts in complex supply chains of construction projects. Journal of Civil Engineering and Management, 23(6), 712-726. https://doi.org/10.3846/13923730.2016.123230510.3846/13923730.2016.1232305Open DOISearch in Google Scholar

Kale, S., & Karaman, E. A. (2012). A diagnostic model for assessing the knowledge management practices of construction firms. KSCE Journal of Civil Engineering, 16(4), 526-537. https://doi.org/10.1007/s12205-012-1468-x10.1007/s12205-012-1468-xOpen DOISearch in Google Scholar

Khan, M. A., Deep, S., Asim, M., & Khan, Z. R. (2017). Quantization of risks involved in supply of ready mix concrete in construction industry in indian scenario. International Journal of Civil Engineering and Technology, 8(3), 175-184.Search in Google Scholar

Komurlu, R., & Arditi, D. (2017). The role of general conditions relative to claims and disputes in building construction contracts. New Arch-International Journal of Contemporary Architecture, 4(2), 27-36.Search in Google Scholar

Kornelius, L., & Wamelink, J. (1998). The virtual corporation: Learning from construction. Supply Chain Management: An International Journal, 3(4), 193-202. Kornelius, L., & Wamelink, J. W. F. (1998). The virtual corporation: learning from construction. Supply Chain Management: An International Journal, 3(4), 193-202. https://doi.org/10.1108/1359854981024427810.1108/13598549810244278Open DOISearch in Google Scholar

Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2004). Benchmarking design‐build procurement systems in construction. Benchmarking: An International Journal, 11(3), 287-302. https://doi.org/10.1108/1463577041053876310.1108/14635770410538763Open DOISearch in Google Scholar

Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), 367-377. https://doi.org/10.1007/s12205-008-0367-710.1007/s12205-008-0367-7Open DOISearch in Google Scholar

Lessing, J., & Brege, S. (2015). Business models for product-oriented house-building companies - experience from two Swedish case studies. Construction Innovation, 15(4), 449-472. https://doi.org/10.1108/CI-02-2015-000910.1108/CI-02-2015-0009Open DOISearch in Google Scholar

Lloyd-walker, B. M., Mills, A. J., & Walker, D. H. T. (2014). Enabling construction innovation: the role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(3), 229-245. https://doi.org/10.1080/01446193.2014.89262910.1080/01446193.2014.892629Open DOISearch in Google Scholar

Love, P. E. D., Zhou, J., Edwards, D. J., Irani, Z., & Sing, C.-P. (2017a). Off the rails: The cost performance of infrastructure rail projects. Transportation Research Part A: Policy and Practice, 99, 14-29. https://doi.org/10.1016/j.tra.2017.02.00810.1016/j.tra.2017.02.008Open DOISearch in Google Scholar

Love, P. E. D., Davis, P. R., Sai On Cheung, & Irani, Z. (2011). Causal Discovery and Inference of Project Disputes. IEEE Transactions on Engineering Management, 58(3), 400-411. https://doi.org/10.1109/TEM.2010.204890710.1109/TEM.2010.2048907Open DOISearch in Google Scholar

Love, P. E. D., Irani, Z., Smith, J., Regan, M., & Liu, J. (2017b). Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Production Planning & Control, 28(13), 1081-1092. https://doi.org/10.1080/09537287.2017.133364710.1080/09537287.2017.1333647Open DOISearch in Google Scholar

Mahamid, I. (2017). Analysis of common factors leading to conflicts between contractors and their subcontractors in building construction projects. Australian Journal of Multi-Disciplinary Engineering, 13(1), 18-28. https://doi.org/10.1080/14488388.2017.134251510.1080/14488388.2017.1342515Open DOISearch in Google Scholar

Mathivathanan, D., Kannan, D., & Haq, A. N. (2018). Sustainable supply chain management practices in Indian automotive industry: A multi-stakeholder view. Resources, Conservation and Recycling, 128, 284-305. https://doi.org/10.1016/j.resconrec.2017.01.00310.1016/j.resconrec.2017.01.003Open DOISearch in Google Scholar

Mishra, D., Gunasekaran, A., Papadopoulos, T., & Hazen, B. (2017). Green supply chain performance measures: A review and bibliometric analysis. Sustainable Production and Consumption, 10, 85-99. https://doi.org/10.1016/j.spc.2017.01.00310.1016/j.spc.2017.01.003Search in Google Scholar

Mitkus, S., & Mitkus, T. (2014). Causes of Conflicts in a Construction Industry: A Communicational Approach. Procedia - Social and Behavioral Sciences, 110, 777-786. https://doi.org/10.1016/j.sbspro.2013.12.92210.1016/j.sbspro.2013.12.922Open DOISearch in Google Scholar

Nguyen, L., & Watanabe, T. (2017). The Impact of Project Organizational Culture on the Performance of Construction Projects. Sustainability, 9(5), 781. https://doi.org/10.3390/su905078110.3390/su9050781Open DOISearch in Google Scholar

Orangi, A., Palaneeswaran, E., & Wilson, J. (2011). Exploring Delays in Victoria-Based Astralian Pipeline Projects. Procedia Engineering, 14, 874-881. https://doi.org/10.1016/j.proeng.2011.07.11110.1016/j.proeng.2011.07.111Open DOISearch in Google Scholar

Osipova, E., & Eriksson, P. E. (2011). How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), 1149-1158. https://doi.org/10.1080/01446193.2011.63937910.1080/01446193.2011.639379Open DOISearch in Google Scholar

Palaneeswaran, E., & Kumaraswamy, M. (2001). Recent advances and proposed improvements in contractor prequalification methodologies. Building and Environment, 36(1), 73-87. https://doi.org/10.1016/S0360-1323(99)00069-410.1016/S0360-1323(99)00069-4Open DOISearch in Google Scholar

Palaneeswaran, E., Kumaraswamy, M. M., & Zhang, X. Q. (2001). Reforging construction supply chains: European Journal of Purchasing & Supply Management, 7(3), 165-178. https://doi.org/10.1016/S0969-7012(00)00025-310.1016/S0969-7012(00)00025-3Open DOISearch in Google Scholar

Palaneeswaran, E., & Kumaraswamy, M. M. (2000). Contractor Selection for Design/Build Projects. Journal of Construction Engineering and Management, 126(5), 331-339. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(331)10.1061/(ASCE)0733-9364(2000)126:5(331Open DOISearch in Google Scholar

Palaneeswaran, E., & Kumaraswamy, M. M. (2008). An integrated decision support system for dealing with time extension entitlements. Automation in Construction, 17(4), 425-438. https://doi.org/10.1016/j.autcon.2007.08.00210.1016/j.autcon.2007.08.002Open DOISearch in Google Scholar

Qu, X., Meng, Q., Yuanita, V., & Wong, Y. H. (2011). Design and implementation of a quantitative risk assessment software tool for Singapore road tunnels. Expert Systems with Applications. 38(11), 13827-13834. https://doi.org/10.1016/j.eswa.2011.04.18610.1016/j.eswa.2011.04.186Open DOISearch in Google Scholar

Rahmani, F., Maqsood, T., & Khalfan, M. (2017). An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(4), 593-609. https://doi.org/10.1108/ECAM-03-2016-005810.1108/ECAM-03-2016-0058Open DOISearch in Google Scholar

Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83-98. https://doi.org/10.1504/IJSSCI.2008.01759010.1504/IJSSCI.2008.017590Open DOISearch in Google Scholar

Sanderson, M., Allen, P., Gill, R., & Garnett, E. (2018). New models of contracting in the public sector: A review of alliance contracting, prime contracting and outcome-based contracting literature. Social Policy & Administration. 52(5), 1060-1083. Retrieved from https://onlinelibrary.wiley.com/doi/pdf/10.1111/spol.1232210.1111/spol.12322Open DOISearch in Google Scholar

Segerstedt, A., & Olofsson, T. (2010). Supply chains in the construction industry. Supply Chain Management: An International Journal, 15(5), 347-353. https://doi.org/10.1108/1359854101106826010.1108/13598541011068260Open DOISearch in Google Scholar

Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), 1471-1480. https://doi.org/10.1016/j.ijproman.2014.04.00410.1016/j.ijproman.2014.04.004Search in Google Scholar

Shen, L., Zhang, Z., & Long, Z. (2017). Significant barriers to green procurement in real estate development. Resources, Conservation and Recycling, 116, 160-168. https://doi.org/10.1016/j.resconrec.2016.10.00410.1016/j.resconrec.2016.10.004Open DOISearch in Google Scholar

Sigmund, Z., & Radujković, M. (2014). Risk Breakdown Structure for Construction Projects on Existing Buildings. Procedia - Social and Behavioral Sciences, 119, 894-901. https://doi.org/10.1016/j.sbspro.2014.03.10010.1016/j.sbspro.2014.03.100Open DOISearch in Google Scholar

Singh, M. K., Deep, S., & Banerjee, R. (2017). Risk management in construction projects as per indian scenario. International Journal of Civil Engineering and Technology, 8(3), 127-136.Search in Google Scholar

Srivastava, S. D., & Banerjee, R. (2015). Hybrid renewable energy systems & their suitability in rural regions. IOSR Journal of Mechanical and Civil Engineering, 12(3), 117-120. Retrieved from http://www.iosrjournals.org/iosr-jmce/papers/vol12-issue3/Version-1/S01231117120.pdfSearch in Google Scholar

Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017). A study of project success and procurement frameworks in indian construction industry. International Journal of Civil Engineering and Technology, 8(3), 167-174. http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=3Search in Google Scholar

Walker, D. H. T., Davis, P. R., & Stevenson, A. (2017). Coping with uncertainty and ambiguity through team collaboration in infrastructure projects. International Journal of Project Management, 35(2), 180-190. https://doi.org/10.1016/j.ijproman.2016.11.00110.1016/j.ijproman.2016.11.001Open DOISearch in Google Scholar

Wood, P. S. (2010). Comparing cost uplift in infrastructure delivery methods: A case based approach. (A dissertation submitted as fulfilment for the Degree of Doctor of Business Administration, Queensland University of Technology, Brisbane). Available from Alliance Contracting Electronic Law Journal. http://alliancecontractingelectroniclawjournal.com/wood-p-2010-comparing-cost-uplift-in-infrastructure-delivery-methods-a-case-based-approach/Search in Google Scholar

Yeo, K., & Ning, J. (2002). Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects. International Journal of Project Management, 20(4), 253-262. https://doi.org/10.1016/S0263-7863(01)00021-7.10.1016/S0263-7863(01)00021-7Open DOISearch in Google Scholar