Otwarty dostęp

Application of BIM technology in dynamic management and control of construction project costs


Zacytuj

Ye, D. (2021). An algorithm for construction project cost forecast based on particle swarm optimization-guided bp neural network. Scientific programming(Pt.9), 2021. Search in Google Scholar

Lin, X., & Lu, Y. (2020). Research on mathematical model of cost budget in the early stage of assembly construction project based on improved neural network algorithm. Mathematical Problems in Engineering, 2020, 1-7. Search in Google Scholar

Ugur, L. O., Kanit, R., Erdal, H., Namli, E., Erdal, H. I., & Baykan, U. N., et al. (2019). Enhanced predictive models for construction costs: a case study of turkish mass housing sector. Computational Economics, 53(4), 1403-1419. Search in Google Scholar

He, L., & Zhang, L. (2017). Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project. Journal of the Operational Research Society. Search in Google Scholar

Karlsson, I., Johan Rootzén, & Johnsson, F. (2020). Reaching net-zero carbon emissions in construction supply chains – analysis of a swedish road construction project. Renewable and Sustainable Energy Reviews, 120, 109651-. Search in Google Scholar

Pilger, J. D., Machado, N. L., Lawisch-Rodriguez, A. D. A., Ana Letícia Zappe, & Rodriguez-Lopez, D. Search in Google Scholar

A. (2020). Environmental impacts and cost overrun derived from adjustments of a road construction project setting. Journal of Cleaner Production, 256, 120731. Search in Google Scholar

Daopeng, W., Jifei, F., Hanliang, F., & Bing, Z. (2018). Research on optimization of big data construction engineering quality management based on rnn-lstm. Complexity, 2018, 1-16. Search in Google Scholar

Han, C., Tang, F., Ma, T., Gu, L., & Tong, Z. (2022). Construction quality evaluation of asphalt pavement based on bim and gis. Automation in construction. Search in Google Scholar

Zhang, K., & Tsai, J. S. (2021). Identification of critical factors influencing prefabricated construction quality and their mutual relationship. Sustainability, 13. Search in Google Scholar

Kim, J., Lim, J., Lim, H. C., & Kim, D. Y. (2022). Improving sustainable project success strategies focused on cost and schedule for electrical construction project management. Sustainability, 14. Search in Google Scholar

Arthur, L., C., Antoine, Keith, & R., et al. (2018). Timing of cost certainty in highway construction project delivery: perceptions versus empirical results. Transportation research record, 2672(26), 88-95. Search in Google Scholar

Ferraioli, M., & Mandara, A. (2017). Base isolation for seismic retrofitting of a multiple building structure: design, construction, and assessment. Mathematical Problems in Engineering, 2017, 1-24. Search in Google Scholar

Prayogo, D., Cheng, M. Y., Wu, Y. W., Herdany, A. A., & Prayogo, H. (2018). Differential big bang - big crunch algorithm for construction-engineering design optimization. Automation in Construction, 85(JAN.), 290-304. Search in Google Scholar

Adhikari, P., Ng, K. W., Gebreslasie, Y. Z., Wulff, S. S., & Sullivan, T. A. (2020). Geomaterial classification criteria for design and construction of driven steel h-piles. Canadian Geotechnical Journal, 57. Search in Google Scholar

Hong, S. H., Lee, S. K., & Yu, J. H. (2019). Automated management of green building material information using web crawling and ontology. Automation in Construction, 102(JUN.), 230-244. Search in Google Scholar

Zahedi, L., & Lu, M. (2022). Generating labour cost budget for a construction-oriented fabrication facility: simulation-based resource scheduling approach. Canadian Journal of Civil Engineering(6), 49. Search in Google Scholar

Galagali, A. A. (2017). Time-cost-quality trade-off in construction project management. International Journal of Civil Engineering, 4(8), 24-31. Search in Google Scholar

Reynoso, OF, de, la, Rosa, & AB, et al. (2017). Wood frame house construction project in mexico. REV CONSTR, 2017,16(2)(-), 307-322. Search in Google Scholar

Gaur, S., & Tawalare, A. (2022). Investigating the role of bim in stakeholder management: evidence from a metro-rail project. Journal of management in engineering(1), 38. Search in Google Scholar

Yin, Y., Choi, K., Jeong, H. D., & Touran, A. (2022). Integration of schedule, cost, traffic, and risk into the determination of construction contract times. Journal of management in engineering. Search in Google Scholar

Lin, T., Yi, T., Zhang, C., & Liu, J. (2019). Intelligent prediction of the construction cost of substation projects using support vector machine optimized by particle swarm optimization. Mathematical Problems in Engineering, 2019. Search in Google Scholar

Plebankiewicz, E., & Wieczorek, D. (2020). Prediction of cost overrun risk in construction projects. Sustainability, 12(22), 9341. Search in Google Scholar

Yang, K., Kim, K., & Go, S. (2021). Towards effective safety cost budgeting for apartmentconstruction: a case study of occupational safety and health expenses in south korea. Sustainability, 13(3), 1335. Search in Google Scholar

Abdul Nabi, M., & El-Adaway, I. H. (2021). Understanding the key risks affecting cost and schedule performance of modular construction projects. Journal of management in engineering(4), 37. Search in Google Scholar

Ding, X., & Lu, Q. (2020). Construction cost management strategy based on bim technology and neural network model. Journal of Intelligent and Fuzzy Systems(6), 1-13. Search in Google Scholar

Huang, L., Pradhan, R., Dutta, S., & Cai, Y. (2022). Bim4d-based scheduling for assembling and lifting in precast-enabled construction. Automation in construction(Jan.), 133. Search in Google Scholar

Collinge, W. H., Farghaly, K., Mosleh, M. H., Manu, P., Cheung, C. M., & Osorio-Sandoval, C. A. (2022). Bim-based construction safety risk library. Automation in construction. Search in Google Scholar

eISSN:
2444-8656
Język:
Angielski
Częstotliwość wydawania:
Volume Open
Dziedziny czasopisma:
Life Sciences, other, Mathematics, Applied Mathematics, General Mathematics, Physics