[Abd El Khalek, - Hamada M. Kamel (2016) “Risk and uncertainty assessment model in construction projects using fuzzy logic.” American Journal of Civil Engineering, pp. 24-39.10.11648/j.ajce.20160401.13]Search in Google Scholar
[Al-Bahar, Jamal F., - Keith C. Crandall (1990) “Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, pp. 533-546.10.1061/(ASCE)0733-9364(1990)116:3(533)]Search in Google Scholar
[Ayyub, Bilal M., - Achintya Haldar (1984) “Project scheduling using fuzzy set concepts.” Journal of Construction Engineering and Management, pp. 189-204.10.1061/(ASCE)0733-9364(1984)110:2(189)]Search in Google Scholar
[Banaitiene, Nerija, - Audrius Banaitis (2012) “Risk management in construction projects.” Risk Management–Current Issues and Challenges. In N. Banaitiene (Ed.), Risk Management–Current Issues and Challenges, pp. 429-448.10.5772/51460]Search in Google Scholar
[Bannerman, Paul L. (2008) “Risk and risk management in software projects: A reassessment.” Journal of Systems and Software, pp. 2118-2133.10.1016/j.jss.2008.03.059]Search in Google Scholar
[Bennett, Joanna C., et al. (1996) “Risk analysis techniques and their application to software development.” European Journal of Operational Research, pp. 467-475.10.1016/S0377-2217(96)00171-3]Search in Google Scholar
[Bojadziev, George, - Maria Bojadziev (2007) Fuzzy logic for business, finance, and management. Vol. 23. World Scientific, pp. 252.10.1142/6451]Search in Google Scholar
[BS ISO 31000 (2018) “Risk management – Guidelines”. The British Standards Institute.]Search in Google Scholar
[Bu-Qammaz, - M. Talat Birgonul (2009) “Risk assessment of international construction projects using the analytic network process.” Canadian Journal of Civil Engineering, pp. 1170-1181.10.1139/L09-061]Search in Google Scholar
[Cho, Yoon-Bae Kim (2002) “A risk assessment methodology for incorporating uncertainties using fuzzy concepts.” Reliability Engineering & System Safety, pp. 173-183.10.1016/S0951-8320(02)00158-8]Search in Google Scholar
[El-Sayegh, Sameh Monir (2008) “Risk assessment and allocation in the UAE construction industry.” International journal of project management, pp. 431-438.10.1016/j.ijproman.2007.07.004]Search in Google Scholar
[Fuzzy Logic ToolboxTM (2015) 2 user’s guides, MATLAB. The Math Works, Inc., Natick.]Search in Google Scholar
[Gunduz, - Mustafa Ozdemir (2015) “Fuzzy assessment model to estimate the probability of delay in Turkish construction projects.” Journal of Management in Engineering, pp. 01-32.10.1061/(ASCE)ME.1943-5479.0000261]Search in Google Scholar
[Hubbard, Douglas W. (2020) The failure of risk management: Why it’s broken and how to fix it. John Wiley & Sons.10.1002/9781119521914]Search in Google Scholar
[Kangari, - Leland S. Riggs (1989) “Construction risk assessment by linguistics.” IEEE transactions on engineering management, pp. 126-131.10.1109/17.18829]Search in Google Scholar
[Karimi Azari – Amir Reza, et al. (2011) “Risk assessment model selection in construction industry.” Expert Systems with Applications, pp. 9105-9111.]Search in Google Scholar
[Koehn, E. (1984) “Fuzzy sets in construction engineering.” Proc. CIB W-65.]Search in Google Scholar
[Krane, Nils OE Olsson (2010) “Categorising risks in seven large projects—Which risks do the projects focus on?” Project management journal, pp. 81-86.10.1002/pmj.20154]Search in Google Scholar
[Mamdani - Sedrak Assilian (1975) “An experiment in linguistic synthesis with a fuzzy logic controller.” International journal of man-machine studies, pp. 1-13.]Search in Google Scholar
[Manoliadis, Odysseas (2018) “The assessment of construction project risks with the use of fuzzy Delphi methodology—case study photovoltaic project in Greece.” International Journal of Management and Fuzzy Systems, pp. 7-14.10.11648/j.ijmfs.20180401.12]Search in Google Scholar
[Nicholas, John M., - Herman Steyn (2008) Project management for business, engineering, and technology: principles and practice. Elsevier.]Search in Google Scholar
[Nieto-Morote, - Francisco Ruz-Vila (2011) “A fuzzy approach to construction project risk assessment.” International Journal of Project Management, pp. 220-231.10.1016/j.ijproman.2010.02.002]Search in Google Scholar
[PMI A guide to the project management body of knowledge (2004) PMBOK Guide, 3rd edn. Project Management Institute Inc., Newtown Square.]Search in Google Scholar
[Rainer Jr, - Houston H. Carr (1991) “Risk analysis for information technology.” Journal of Management information systems, pp. 129-147.]Search in Google Scholar
[Shang, Huiping, et al. (2005) “An intelligent risk assessment system for distributed construction teams.” Engineering, Construction and Architectural Management Vol. 12 Issue 4, pp. 391 - 409.10.1108/09699980510608839]Search in Google Scholar
[Subramanyan, - Vandana Bhatt (2012) “Construction project risk assessment: development of model based on investigation of opinion of construction project experts from India.” Journal of construction engineering and management, pp. 409-421.10.1061/(ASCE)CO.1943-7862.0000435]Search in Google Scholar
[Tah, Joseph HM, - V. Carr (2000) “A proposal for construction project risk assessment using fuzzy logic.” Construction Management & Economics, pp. 491-500.10.1080/01446190050024905]Search in Google Scholar
[Tah, Joseph HM, - V. Carr (2001) “Knowledge-based approach to construction project risk management.” Journal of computing in civil engineering, pp. 170-177.10.1061/(ASCE)0887-3801(2001)15:3(170)]Search in Google Scholar
[V. T. Covello, - J. Mumpower (1986) Risk Evaluation and Management. New York: Plenum.10.1007/978-1-4613-2103-3]Search in Google Scholar
[White, Diana (1995) “Application of systems thinking to risk management.” Management Decision Vol. 33 No. 10, pp. 35-45.10.1108/EUM0000000003918]Search in Google Scholar
[Yeung, - Daniel WM Chan (2012) “Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia.” Journal of management in engineering, pp. 181-192.10.1061/(ASCE)ME.1943-5479.0000083]Search in Google Scholar
[Yong, - Nur Emma Mustaffa (2012) “Analysis of factors critical to construction project success in Malaysia.” Engineering, construction and architectural management.]Search in Google Scholar
[Zadeh, L.A. (1965) Fuzzy sets. Inf. Control 8(3), pp. 338–353.10.1016/S0019-9958(65)90241-X]Search in Google Scholar
[Zadeh, L.A. (2007) “Application of a fuzzy based decision-making methodology to construction project risk assessment.” International journal of project management, pp. 589-600.]Search in Google Scholar