Uneingeschränkter Zugang

Risk Assessment Model Based on Fuzzy Logic for Residential Buildings


Zitieren

Abd El Khalek, - Hamada M. Kamel (2016)Risk and uncertainty assessment model in construction projects using fuzzy logic.” American Journal of Civil Engineering, pp. 24-39.10.11648/j.ajce.20160401.13Search in Google Scholar

Al-Bahar, Jamal F., - Keith C. Crandall (1990)Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, pp. 533-546.10.1061/(ASCE)0733-9364(1990)116:3(533)Search in Google Scholar

Ayyub, Bilal M., - Achintya Haldar (1984)Project scheduling using fuzzy set concepts.” Journal of Construction Engineering and Management, pp. 189-204.10.1061/(ASCE)0733-9364(1984)110:2(189)Search in Google Scholar

Banaitiene, Nerija, - Audrius Banaitis (2012)Risk management in construction projects.” Risk Management–Current Issues and Challenges. In N. Banaitiene (Ed.), Risk Management–Current Issues and Challenges, pp. 429-448.10.5772/51460Search in Google Scholar

Bannerman, Paul L. (2008)Risk and risk management in software projects: A reassessment.” Journal of Systems and Software, pp. 2118-2133.10.1016/j.jss.2008.03.059Search in Google Scholar

Bennett, Joanna C., et al. (1996)Risk analysis techniques and their application to software development.” European Journal of Operational Research, pp. 467-475.10.1016/S0377-2217(96)00171-3Search in Google Scholar

Bojadziev, George, - Maria Bojadziev (2007) Fuzzy logic for business, finance, and management. Vol. 23. World Scientific, pp. 252.10.1142/6451Search in Google Scholar

BS ISO 31000 (2018) “Risk management – Guidelines”. The British Standards Institute.Search in Google Scholar

Bu-Qammaz, - M. Talat Birgonul (2009)Risk assessment of international construction projects using the analytic network process.” Canadian Journal of Civil Engineering, pp. 1170-1181.10.1139/L09-061Search in Google Scholar

Cho, Yoon-Bae Kim (2002) “A risk assessment methodology for incorporating uncertainties using fuzzy concepts.” Reliability Engineering & System Safety, pp. 173-183.10.1016/S0951-8320(02)00158-8Search in Google Scholar

El-Sayegh, Sameh Monir (2008)Risk assessment and allocation in the UAE construction industry.” International journal of project management, pp. 431-438.10.1016/j.ijproman.2007.07.004Search in Google Scholar

Fuzzy Logic ToolboxTM (2015) 2 user’s guides, MATLAB. The Math Works, Inc., Natick.Search in Google Scholar

Gunduz, - Mustafa Ozdemir (2015)Fuzzy assessment model to estimate the probability of delay in Turkish construction projects.” Journal of Management in Engineering, pp. 01-32.10.1061/(ASCE)ME.1943-5479.0000261Search in Google Scholar

Hubbard, Douglas W. (2020) The failure of risk management: Why it’s broken and how to fix it. John Wiley & Sons.10.1002/9781119521914Search in Google Scholar

Kangari, - Leland S. Riggs (1989)Construction risk assessment by linguistics.” IEEE transactions on engineering management, pp. 126-131.10.1109/17.18829Search in Google Scholar

Karimi Azari – Amir Reza, et al. (2011)Risk assessment model selection in construction industry.” Expert Systems with Applications, pp. 9105-9111.Search in Google Scholar

Koehn, E. (1984)Fuzzy sets in construction engineering.” Proc. CIB W-65.Search in Google Scholar

Krane, Nils OE Olsson (2010)Categorising risks in seven large projects—Which risks do the projects focus on?” Project management journal, pp. 81-86.10.1002/pmj.20154Search in Google Scholar

Mamdani - Sedrak Assilian (1975)An experiment in linguistic synthesis with a fuzzy logic controller.” International journal of man-machine studies, pp. 1-13.Search in Google Scholar

Manoliadis, Odysseas (2018)The assessment of construction project risks with the use of fuzzy Delphi methodology—case study photovoltaic project in Greece.” International Journal of Management and Fuzzy Systems, pp. 7-14.10.11648/j.ijmfs.20180401.12Search in Google Scholar

Nicholas, John M., - Herman Steyn (2008) Project management for business, engineering, and technology: principles and practice. Elsevier.Search in Google Scholar

Nieto-Morote, - Francisco Ruz-Vila (2011) “A fuzzy approach to construction project risk assessment.” International Journal of Project Management, pp. 220-231.10.1016/j.ijproman.2010.02.002Search in Google Scholar

PMI A guide to the project management body of knowledge (2004) PMBOK Guide, 3rd edn. Project Management Institute Inc., Newtown Square.Search in Google Scholar

Rainer Jr, - Houston H. Carr (1991)Risk analysis for information technology.” Journal of Management information systems, pp. 129-147.Search in Google Scholar

Shang, Huiping, et al. (2005) “An intelligent risk assessment system for distributed construction teams.” Engineering, Construction and Architectural Management Vol. 12 Issue 4, pp. 391 - 409.10.1108/09699980510608839Search in Google Scholar

Subramanyan, - Vandana Bhatt (2012)Construction project risk assessment: development of model based on investigation of opinion of construction project experts from India.” Journal of construction engineering and management, pp. 409-421.10.1061/(ASCE)CO.1943-7862.0000435Search in Google Scholar

Tah, Joseph HM, - V. Carr (2000) “A proposal for construction project risk assessment using fuzzy logic.” Construction Management & Economics, pp. 491-500.10.1080/01446190050024905Search in Google Scholar

Tah, Joseph HM, - V. Carr (2001)Knowledge-based approach to construction project risk management.” Journal of computing in civil engineering, pp. 170-177.10.1061/(ASCE)0887-3801(2001)15:3(170)Search in Google Scholar

V. T. Covello, - J. Mumpower (1986) Risk Evaluation and Management. New York: Plenum.10.1007/978-1-4613-2103-3Search in Google Scholar

White, Diana (1995)Application of systems thinking to risk management.” Management Decision Vol. 33 No. 10, pp. 35-45.10.1108/EUM0000000003918Search in Google Scholar

Yeung, - Daniel WM Chan (2012)Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia.” Journal of management in engineering, pp. 181-192.10.1061/(ASCE)ME.1943-5479.0000083Search in Google Scholar

Yong, - Nur Emma Mustaffa (2012)Analysis of factors critical to construction project success in Malaysia.” Engineering, construction and architectural management.Search in Google Scholar

Zadeh, L.A. (1965) Fuzzy sets. Inf. Control 8(3), pp. 338–353.10.1016/S0019-9958(65)90241-XSearch in Google Scholar

Zadeh, L.A. (2007)Application of a fuzzy based decision-making methodology to construction project risk assessment.” International journal of project management, pp. 589-600.Search in Google Scholar

eISSN:
1338-3973
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
4 Hefte pro Jahr
Fachgebiete der Zeitschrift:
Technik, Einführungen und Gesamtdarstellungen, andere