[Aitken, A., & Paton, R. A. (2017). The ‘t-shaped buyer’: A transactional perspective on supply chain relationships. Journal of Purchasing and Supply Management, 23(4), pp. 280-289. doi: 10.1016/j.pursup.2017.03.001.]Search in Google Scholar
[Asgari, S., Awwad, R., Kandil, A., & Odeh, I. (2016). Impact of considering need for work and risk on performance of construction contractors: An agent-based approach. Automation in Construction, 65, pp. 9-20. doi: 10.1016/j. autcon.2016.01.004.]Search in Google Scholar
[Asim, M., Deep, S., & Ahmad, S. A. (2017a). Time impact study of real estate sector construction projects post application of lean principles for delay resolutions. Indian Journal of Science and Technology, 8(82), pp. 89-99.]Search in Google Scholar
[Asim, M., Deep, S., & Ahmad, S. A. (2017b). Time impact study of real estate sector construction projects post application of lean principles for delay resolutions. International Journal of Civil Engineering and Technology, 8(2), pp. 89-99.]Search in Google Scholar
[Bai, C., Rezaei, J., & Sarkis, J. (2017). Multicriteria green supplier segmentation. IEEE Transactions on Engineering Management, 64(4), pp. 515-528.10.1109/TEM.2017.2723639]Search in Google Scholar
[Chang, J.-R. (2015). Performance records system for public construction contractors-application of smooth roads project. Journal of Performance of Constructed Facilities, 30(3), p. 06015004.]Search in Google Scholar
[Chang, J.-R. (2016). Performance records system for public construction contractors—application of smooth roads project. Journal of Performance of Constructed Facilities, 30(3), doi: 10.1061/(ASCE)CF.1943-5509.0000793.]Search in Google Scholar
[Chang, J. (2017). The effects of buyer-supplier’s collaboration on knowledge and product innovation. Industrial Marketing Management, 65, pp. 129-143. doi: 10.1016/j. indmarman.2017.04.003.]Search in Google Scholar
[Damoah, I. S., & Akwei, C. (2017). Government project failure in Ghana: A multidimensional approach. International Journal of Managing Projects in Business, 10(1), pp. 32-59.10.1108/IJMPB-02-2016-0017]Search in Google Scholar
[Deep, S., Asim, M., & Ahmad, S. A. (2017a). Earned value based liability calculation algorithm for schedule delays in construction projects. Indian Journal of Science and Technology, 10(15), pp. 1-10.10.17485/ijst/2017/v10i15/110324]Search in Google Scholar
[Deep, S., Asim, M., & Khan, M. K. (2017b). Review of various delay causing factors and their resolution by application of lean principles in India. Baltic Journal of Real Estate Economics and Construction Management, 5(1), pp. 101-117.10.1515/bjreecm-2017-0008]Search in Google Scholar
[Deep, S., Jefferies, M., & Gajendran, T. (2017c). Resolving constraints in collaborative procurement through the lens of a portfolio purchasing model: A traditional literature review. Paper presented at the International Symposium on Frontiers of Infrastructure Finance, Indian Institute of Technology, Kharagpur.]Search in Google Scholar
[Deep, S., Khan, M. B., Ahmad, S., & Saeed, A. (2017d). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), pp. 28-33.]Search in Google Scholar
[Deep, S., Singh, D., & Ahmad, S. (2017e). A review of contract awards to lowest bidder in Indian construction projects via case based approach. Open Journal of Business and Management, 5(1), pp. 159-168.10.4236/ojbm.2017.51015]Search in Google Scholar
[Dixit, V., Chaudhuri, A., & Srivastava, R. K. (2017). Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18, pp. 1-18. doi: 10.1080/15623599.2017.1314750.]Search in Google Scholar
[Doğan, S. Z., Çalğici, P. K., Arditi, D., & Günaydin, H. M. (2016). Critical success factors of partnering in the building design process. METU Journal of the Faculty of Architecture, 32(2).10.4305/METU.JFA.2015.2.4]Search in Google Scholar
[Dražić, J., Peško, I., Mučenski, V., Dejić, A., & Romanovich, M. (2016). Evaluating contractors and offered structural solution. Procedia Engineering, 165, pp. 898-905. doi: 10.1016/j. proeng.2016.11.790.]Search in Google Scholar
[Elyamany, A., & Abdelrahman, M. (2010). Contractor performance evaluation for the best value of superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. doi: 10.1061/(ASCE)CO.1943-7862.0000158.]Search in Google Scholar
[Elzomor, M., & Parrish, K. (2016). Investigating building construction process and developing a performance index. Procedia Engineering, 145, pp. 211-218. doi: 10.1016/j. proeng.2016.04.063.]Search in Google Scholar
[Erdogan, S. A., Šaparauskas, J., & Turskis, Z. (2017). Decision making in construction management: AHP and expert choice approach. Procedia Engineering, 172, pp. 270-276. doi: 10.1016/j.proeng.2017.02.111.]Search in Google Scholar
[Eriksson, P. E. (2010). Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917.10.1080/01446190903536422]Search in Google Scholar
[Gündüz, M., Nielsen, Y., & Özdemir, M. (2012). Quantification of delay factors using the relative importance index method for construction projects in turkey. Journal of Management in Engineering, 29(2), pp. 133-139.10.1061/(ASCE)ME.1943-5479.0000129]Search in Google Scholar
[Hatush, Z., & Skitmore, M. (1997). Assessment and evaluation of contractor data against client goals using pert approach. Construction Management & Economics, 15(4), pp. 327-340.10.1080/014461997372881]Search in Google Scholar
[Heesom, D., Xiao, H., and Proverbs, D.G. (2003). The development of appropriate measurements for the international comparison of contractor performance. Paper presented at the Construction Research Congress. Available at http://ascelibrary.org/doi/ abs/10.1061/40671%282003%291910.1061/40671%282003%2919]Open DOISearch in Google Scholar
[Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., & Eboreime, I. V. (2013). Analysis of non-excusable delay factors influencing contractors’ performance in Lagos state, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72.]Search in Google Scholar
[Ioannou, P. G., & Leu, S.-S. (1993). Average-bid method- competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147.10.1061/(ASCE)0733-9364(1993)119:1(131)]Search in Google Scholar
[Ishii, N., Takano, Y., & Muraki, M. (2014). An order acceptance strategy under limited engineering man-hours for cost estimation in engineering-procurement-construction projects. International Journal of Project Management, 32(3), pp. 519-528.10.1016/j.ijproman.2013.07.009]Search in Google Scholar
[Israel, G. D. (1992). Determining Sample Size. University of Florida Cooperative Extension Service, Institute of Food and Agriculture Sciences, EDIS Gainesville.]Search in Google Scholar
[Jaafar, M., Nuruddin, A. R., & Bakar, S. P. S. A. (2016). Managerial capabilities of housing developers: Building the competitive advantage of a firm. International Journal of Construction Management, 16(1), pp. 27-38.10.1080/15623599.2015.1117708]Search in Google Scholar
[Jekale, W. (2004). Performance for Public Construction Projects in Developing Countries: Federal Road and Educational Building Projects in Ethiopia. Thesis, Norwegian University of Science & Technology.]Search in Google Scholar
[Khan, A. R., Deep, S., & Asim, M. (2017a). Analysis of maintenance records of construction equipments and their importance in minimizing equipments breakdown during project execution phase to lessen time overrun. International Journal of Civil Engineering and Technology, 8(83), pp. 11-23.]Search in Google Scholar
[Khan, M. A., Deep, S., Asim, M., & Khan, Z. R. (2017b). Quantization of risks involved in supply of ready mix concrete in construction industry in Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 175-184.]Search in Google Scholar
[Khan, M. A., Srivastava, S. D., Asim, M., & Khan, Z. R. (2017c). Quantization of risks involved in supply of ready mix concrete in construction industry in Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 175-184.]Search in Google Scholar
[Kotula, M., Ho, W., Dey, P. K., & Lee, C. K. M. (2015). Strategic sourcing supplier selection misalignment with critical success factors: Findings from multiple case studies in Germany and the United Kingdom. International Journal of Production Economics, 166, pp. 238-247.10.1016/j.ijpe.2014.12.039]Search in Google Scholar
[Latham, S. M. (1994). Constructing the Team. HM Stationery Office, London.]Search in Google Scholar
[Lema, M. (2006). Alternative Project Delivery Methods for Public Constructions: Cases in Oromia Region. Addis Ababa University, Addis Ababa.]Search in Google Scholar
[Leśniak, A. (2015). Reliability assessment of research into contractors’ bidding decisions. Procedia Engineering, 122, pp. 251-257. doi: 10.1016/j.proeng.2015.10.033.]Search in Google Scholar
[Manu, E., Ankrah, N., Chinyio, E., & Proverbs, D. (2015). Trust influencing factors in main contractor and subcontractor relationships during projects. International Journal of Project Management, 33(7), pp. 1495-1508. doi: 10.1016/j. ijproman.2015.06.006.]Search in Google Scholar
[Mathivathanan, D., Kannan, D., & Haq, A. N. (2017). Sustainable supply chain management practices in Indian automotive industry: A multi-stakeholder view. Resources, Conservation and Recycling, 128(01), pp. 284-305. doi: 10.1016/j. resconrec.2017.01.003.]Search in Google Scholar
[Mishra, D., Gunasekaran, A., Papadopoulos, T., & Hazen, B. (2017). Green supply chain performance measures: A review and bibliometric analysis. Sustainable Production and Consumption, 10, pp. 85-99.10.1016/j.spc.2017.01.003]Search in Google Scholar
[Naoum, S., & Egbu, C. (2015). Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21, pp. 6-13. doi: 10.1016/s2212-5671(15)00144-6.]Search in Google Scholar
[Ng, S. T., Luu, D. T., Chen, S. E., & Lam, K. C. (2002). Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. doi: 10.1080/01446190210121288.]Search in Google Scholar
[Oduro-Owusu, K., Fugar, F., & Manteau, K. (2010). Factors influencing construction worker job satisfaction in the Ghanaian construction industry. Unpublished MSc thesis, KNUST.]Search in Google Scholar
[Palaneeswaran, E., & Kumaraswamy, M. (2001). Recent advances and proposed improvements in contractor prequalification methodologies. Building and Environment, 36(1), pp. 73-87.10.1016/S0360-1323(99)00069-4]Search in Google Scholar
[Palaneeswaran, E., & Kumaraswamy, M. M. (2000). Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339.10.1061/(ASCE)0733-9364(2000)126:5(331)]Search in Google Scholar
[Safa, M., Shahi, A., Haas, C. T., Fiander-McCann, D., Safa, M., Hipel, K., et al. (2015). Competitive intelligence (CI) for evaluation of construction contractors. Automation in Construction, 59, pp. 149-157. doi: 10.1016/j.autcon.2015.02.009.]Search in Google Scholar
[Sanderson, M., Allen, P., Gill, R., & Garnett, E. (2018) New models of contracting in the public sector: A review of alliance contracting, prime contracting and outcome‐based contracting literature. Social Policy & Administration, 52, pp. 1060-1083. https://doi.org/10.1111/spol.12322.10.1111/spol.12322]Open DOISearch in Google Scholar
[Sarker, B. R., Egbelu, P. J., Liao, T. W., & Yu, J. (2012). Planning and design models for construction industry: A critical survey. Automation in Construction, 22, pp. 123-134.10.1016/j.autcon.2011.09.011]Search in Google Scholar
[Setiawan, H., Erdogan, B., & Ogunlana, S. O. (2015). Proactiveness of contractors: A study of Indonesia. Procedia Engineering, 125, pp. 60-67. doi: 10.1016/j.proeng.2015.11.010.]Search in Google Scholar
[Shehu, Z., & Akintoye, A. (2010). Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis. International Journal of Project Management, 28(1), pp. 26-39. doi: 10.1016/j.ijproman.2009.02.004.]Search in Google Scholar
[Sinčić Ćorić, D., Anić, I.-D., Piri Rajh, S., Rajh, E., & Kurnoga, N. (2017). Organizational buying decision approaches in manufacturing industry: Developing measures and typology. Journal of Business & Industrial Marketing, 32(2), pp. 227-237.10.1108/JBIM-10-2014-0214]Search in Google Scholar
[Singh, M. K., Deep, S., & Banerjee, R. (2017a). Risk management in construction projects as per Indian scenario. International Journal of Civil Engineering and Technology, 8(83), pp. 127-136.]Search in Google Scholar
[Singh, M. K., Deep, S., & Banerjee, R. (2017b). Risk management in construction projects as per Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 127-136.]Search in Google Scholar
[Suprapto, M., Bakker, H. L. M., & Mooi, H. G. (2015a). Relational factors in owner-contractor collaboration: The mediating role of teamworking. International Journal of Project Management, 33(6), pp. 1347-1363. doi: 10.1016/j.ijproman.2015.03.015.]Search in Google Scholar
[Suprapto, M., Bakker, H. L. M., Mooi, H. G., & Moree, W. (2015b). Sorting out the essence of owner-contractor collaboration in capital project delivery. International Journal of Project Management, 33(3), pp. 664-683. doi: 10.1016/j. ijproman.2014.05.001.]Search in Google Scholar
[Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017a). A study of project success and procurement frameworks in Indian construction industry. International Journal of Civil Engineering and Technology, 8(3), pp. 167-174.]Search in Google Scholar
[Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017b). A study of project success and procurement frameworks in Indian construction industry. International Journal of Civil Engineering and Technology, 8(83), pp. 167-174.]Search in Google Scholar
[Walker, D. H., Hampson, K., & Peters, R. (2002). Project alliancing vs project partnering: A case study of the Australian national museum project. Supply Chain Management: An International Journal, 7(2), pp. 83-91.10.1108/13598540210425830]Search in Google Scholar
[Wang, C. M., Xu, B. B., Zhang, S. J., & Chen, Y. Q. (2016). Influence of personality and risk propensity on risk perception of Chinese construction project managers. International Journal of Project Management, 34(7), pp. 1294-1304. doi: 10.1016/j. ijproman.2016.07.004.]Search in Google Scholar
[Wang, T., Tang, W., Qi, D., Shen, W., & Huang, M. (2015). Enhancing design management by partnering in delivery of international epc projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4), p. 04015099.10.1061/(ASCE)CO.1943-7862.0001082]Search in Google Scholar
[Winch, G. M. (2000). Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155.10.1080/096132100369046]Search in Google Scholar
[Wong, C. H. (2004). Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. doi: 10.1061/(ASCE)0733- 9364(2004)130:5(691).]Search in Google Scholar
[Xiao, H., & Proverbs, D. (2003). Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332.10.1108/09699980310502937]Search in Google Scholar
[Yang, W., Gao, Y., Li, Y., Shen, H., & Zheng, S. (2017). Different roles of control mechanisms in buyer-supplier conflict: An empirical study from China. Industrial Marketing Management, 65, pp. 144-156. doi: 10.1016/j.indmarman.2017.04.002.]Search in Google Scholar