Uneingeschränkter Zugang

An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario


Zitieren

Aitken, A., & Paton, R. A. (2017). The ‘t-shaped buyer’: A transactional perspective on supply chain relationships. Journal of Purchasing and Supply Management, 23(4), pp. 280-289. doi: 10.1016/j.pursup.2017.03.001.Search in Google Scholar

Asgari, S., Awwad, R., Kandil, A., & Odeh, I. (2016). Impact of considering need for work and risk on performance of construction contractors: An agent-based approach. Automation in Construction, 65, pp. 9-20. doi: 10.1016/j. autcon.2016.01.004.Search in Google Scholar

Asim, M., Deep, S., & Ahmad, S. A. (2017a). Time impact study of real estate sector construction projects post application of lean principles for delay resolutions. Indian Journal of Science and Technology, 8(82), pp. 89-99.Search in Google Scholar

Asim, M., Deep, S., & Ahmad, S. A. (2017b). Time impact study of real estate sector construction projects post application of lean principles for delay resolutions. International Journal of Civil Engineering and Technology, 8(2), pp. 89-99.Search in Google Scholar

Bai, C., Rezaei, J., & Sarkis, J. (2017). Multicriteria green supplier segmentation. IEEE Transactions on Engineering Management, 64(4), pp. 515-528.10.1109/TEM.2017.2723639Search in Google Scholar

Chang, J.-R. (2015). Performance records system for public construction contractors-application of smooth roads project. Journal of Performance of Constructed Facilities, 30(3), p. 06015004.Search in Google Scholar

Chang, J.-R. (2016). Performance records system for public construction contractors—application of smooth roads project. Journal of Performance of Constructed Facilities, 30(3), doi: 10.1061/(ASCE)CF.1943-5509.0000793.Search in Google Scholar

Chang, J. (2017). The effects of buyer-supplier’s collab­oration on knowledge and product innovation. Industrial Marketing Management, 65, pp. 129-143. doi: 10.1016/j. indmarman.2017.04.003.Search in Google Scholar

Damoah, I. S., & Akwei, C. (2017). Government project failure in Ghana: A multidimensional approach. International Journal of Managing Projects in Business, 10(1), pp. 32-59.10.1108/IJMPB-02-2016-0017Search in Google Scholar

Deep, S., Asim, M., & Ahmad, S. A. (2017a). Earned value based liability calculation algorithm for schedule delays in construction projects. Indian Journal of Science and Technology, 10(15), pp. 1-10.10.17485/ijst/2017/v10i15/110324Search in Google Scholar

Deep, S., Asim, M., & Khan, M. K. (2017b). Review of various delay causing factors and their resolution by application of lean principles in India. Baltic Journal of Real Estate Economics and Construction Management, 5(1), pp. 101-117.10.1515/bjreecm-2017-0008Search in Google Scholar

Deep, S., Jefferies, M., & Gajendran, T. (2017c). Resolving constraints in collaborative procurement through the lens of a portfolio purchasing model: A traditional literature review. Paper presented at the International Symposium on Frontiers of Infrastructure Finance, Indian Institute of Technology, Kharagpur.Search in Google Scholar

Deep, S., Khan, M. B., Ahmad, S., & Saeed, A. (2017d). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), pp. 28-33.Search in Google Scholar

Deep, S., Singh, D., & Ahmad, S. (2017e). A review of contract awards to lowest bidder in Indian construction projects via case based approach. Open Journal of Business and Management, 5(1), pp. 159-168.10.4236/ojbm.2017.51015Search in Google Scholar

Dixit, V., Chaudhuri, A., & Srivastava, R. K. (2017). Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18, pp. 1-18. doi: 10.1080/15623599.2017.1314750.Search in Google Scholar

Doğan, S. Z., Çalğici, P. K., Arditi, D., & Günaydin, H. M. (2016). Critical success factors of partnering in the building design process. METU Journal of the Faculty of Architecture, 32(2).10.4305/METU.JFA.2015.2.4Search in Google Scholar

Dražić, J., Peško, I., Mučenski, V., Dejić, A., & Romanovich, M. (2016). Evaluating contractors and offered structural solution. Procedia Engineering, 165, pp. 898-905. doi: 10.1016/j. proeng.2016.11.790.Search in Google Scholar

Elyamany, A., & Abdelrahman, M. (2010). Contractor performance evaluation for the best value of superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. doi: 10.1061/(ASCE)CO.1943-7862.0000158.Search in Google Scholar

Elzomor, M., & Parrish, K. (2016). Investigating building construction process and developing a performance index. Procedia Engineering, 145, pp. 211-218. doi: 10.1016/j. proeng.2016.04.063.Search in Google Scholar

Erdogan, S. A., Šaparauskas, J., & Turskis, Z. (2017). Decision making in construction management: AHP and expert choice approach. Procedia Engineering, 172, pp. 270-276. doi: 10.1016/j.proeng.2017.02.111.Search in Google Scholar

Eriksson, P. E. (2010). Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917.10.1080/01446190903536422Search in Google Scholar

Gündüz, M., Nielsen, Y., & Özdemir, M. (2012). Quantification of delay factors using the relative importance index method for construction projects in turkey. Journal of Management in Engineering, 29(2), pp. 133-139.10.1061/(ASCE)ME.1943-5479.0000129Search in Google Scholar

Hatush, Z., & Skitmore, M. (1997). Assessment and evaluation of contractor data against client goals using pert approach. Construction Management & Economics, 15(4), pp. 327-340.10.1080/014461997372881Search in Google Scholar

Heesom, D., Xiao, H., and Proverbs, D.G. (2003). The development of appropriate measurements for the international comparison of contractor performance. Paper presented at the Construction Research Congress. Available at http://ascelibrary.org/doi/ abs/10.1061/40671%282003%291910.1061/40671%282003%2919Open DOISearch in Google Scholar

Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., & Eboreime, I. V. (2013). Analysis of non-excusable delay factors influencing contractors’ performance in Lagos state, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72.Search in Google Scholar

Ioannou, P. G., & Leu, S.-S. (1993). Average-bid method- competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147.10.1061/(ASCE)0733-9364(1993)119:1(131)Search in Google Scholar

Ishii, N., Takano, Y., & Muraki, M. (2014). An order acceptance strategy under limited engineering man-hours for cost estimation in engineering-procurement-construction projects. International Journal of Project Management, 32(3), pp. 519-528.10.1016/j.ijproman.2013.07.009Search in Google Scholar

Israel, G. D. (1992). Determining Sample Size. University of Florida Cooperative Extension Service, Institute of Food and Agriculture Sciences, EDIS Gainesville.Search in Google Scholar

Jaafar, M., Nuruddin, A. R., & Bakar, S. P. S. A. (2016). Managerial capabilities of housing developers: Building the competitive advantage of a firm. International Journal of Construction Management, 16(1), pp. 27-38.10.1080/15623599.2015.1117708Search in Google Scholar

Jekale, W. (2004). Performance for Public Construction Projects in Developing Countries: Federal Road and Educational Building Projects in Ethiopia. Thesis, Norwegian University of Science & Technology.Search in Google Scholar

Khan, A. R., Deep, S., & Asim, M. (2017a). Analysis of maintenance records of construction equipments and their importance in minimizing equipments breakdown during project execution phase to lessen time overrun. International Journal of Civil Engineering and Technology, 8(83), pp. 11-23.Search in Google Scholar

Khan, M. A., Deep, S., Asim, M., & Khan, Z. R. (2017b). Quantization of risks involved in supply of ready mix concrete in construction industry in Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 175-184.Search in Google Scholar

Khan, M. A., Srivastava, S. D., Asim, M., & Khan, Z. R. (2017c). Quantization of risks involved in supply of ready mix concrete in construction industry in Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 175-184.Search in Google Scholar

Kotula, M., Ho, W., Dey, P. K., & Lee, C. K. M. (2015). Strategic sourcing supplier selection misalignment with critical success factors: Findings from multiple case studies in Germany and the United Kingdom. International Journal of Production Economics, 166, pp. 238-247.10.1016/j.ijpe.2014.12.039Search in Google Scholar

Latham, S. M. (1994). Constructing the Team. HM Stationery Office, London.Search in Google Scholar

Lema, M. (2006). Alternative Project Delivery Methods for Public Constructions: Cases in Oromia Region. Addis Ababa University, Addis Ababa.Search in Google Scholar

Leśniak, A. (2015). Reliability assessment of research into contractors’ bidding decisions. Procedia Engineering, 122, pp. 251-257. doi: 10.1016/j.proeng.2015.10.033.Search in Google Scholar

Manu, E., Ankrah, N., Chinyio, E., & Proverbs, D. (2015). Trust influencing factors in main contractor and subcontractor relationships during projects. International Journal of Project Management, 33(7), pp. 1495-1508. doi: 10.1016/j. ijproman.2015.06.006.Search in Google Scholar

Mathivathanan, D., Kannan, D., & Haq, A. N. (2017). Sustainable supply chain management practices in Indian automotive industry: A multi-stakeholder view. Resources, Conservation and Recycling, 128(01), pp. 284-305. doi: 10.1016/j. resconrec.2017.01.003.Search in Google Scholar

Mishra, D., Gunasekaran, A., Papadopoulos, T., & Hazen, B. (2017). Green supply chain performance measures: A review and bibliometric analysis. Sustainable Production and Consumption, 10, pp. 85-99.10.1016/j.spc.2017.01.003Search in Google Scholar

Naoum, S., & Egbu, C. (2015). Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21, pp. 6-13. doi: 10.1016/s2212-5671(15)00144-6.Search in Google Scholar

Ng, S. T., Luu, D. T., Chen, S. E., & Lam, K. C. (2002). Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. doi: 10.1080/01446190210121288.Search in Google Scholar

Oduro-Owusu, K., Fugar, F., & Manteau, K. (2010). Factors influencing construction worker job satisfaction in the Ghanaian construction industry. Unpublished MSc thesis, KNUST.Search in Google Scholar

Palaneeswaran, E., & Kumaraswamy, M. (2001). Recent advances and proposed improvements in contractor prequalification methodologies. Building and Environment, 36(1), pp. 73-87.10.1016/S0360-1323(99)00069-4Search in Google Scholar

Palaneeswaran, E., & Kumaraswamy, M. M. (2000). Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339.10.1061/(ASCE)0733-9364(2000)126:5(331)Search in Google Scholar

Safa, M., Shahi, A., Haas, C. T., Fiander-McCann, D., Safa, M., Hipel, K., et al. (2015). Competitive intelligence (CI) for evaluation of construction contractors. Automation in Construction, 59, pp. 149-157. doi: 10.1016/j.autcon.2015.02.009.Search in Google Scholar

Sanderson, M., Allen, P., Gill, R., & Garnett, E. (2018) New models of contracting in the public sector: A review of alliance contracting, prime contracting and outcome‐based contracting literature. Social Policy & Administration, 52, pp. 1060-1083. https://doi.org/10.1111/spol.12322.10.1111/spol.12322Open DOISearch in Google Scholar

Sarker, B. R., Egbelu, P. J., Liao, T. W., & Yu, J. (2012). Planning and design models for construction industry: A critical survey. Automation in Construction, 22, pp. 123-134.10.1016/j.autcon.2011.09.011Search in Google Scholar

Setiawan, H., Erdogan, B., & Ogunlana, S. O. (2015). Proactiveness of contractors: A study of Indonesia. Procedia Engineering, 125, pp. 60-67. doi: 10.1016/j.proeng.2015.11.010.Search in Google Scholar

Shehu, Z., & Akintoye, A. (2010). Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis. International Journal of Project Management, 28(1), pp. 26-39. doi: 10.1016/j.ijproman.2009.02.004.Search in Google Scholar

Sinčić Ćorić, D., Anić, I.-D., Piri Rajh, S., Rajh, E., & Kurnoga, N. (2017). Organizational buying decision approaches in manufacturing industry: Developing measures and typology. Journal of Business & Industrial Marketing, 32(2), pp. 227-237.10.1108/JBIM-10-2014-0214Search in Google Scholar

Singh, M. K., Deep, S., & Banerjee, R. (2017a). Risk management in construction projects as per Indian scenario. International Journal of Civil Engineering and Technology, 8(83), pp. 127-136.Search in Google Scholar

Singh, M. K., Deep, S., & Banerjee, R. (2017b). Risk management in construction projects as per Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 127-136.Search in Google Scholar

Suprapto, M., Bakker, H. L. M., & Mooi, H. G. (2015a). Relational factors in owner-contractor collaboration: The mediating role of teamworking. International Journal of Project Management, 33(6), pp. 1347-1363. doi: 10.1016/j.ijproman.2015.03.015.Search in Google Scholar

Suprapto, M., Bakker, H. L. M., Mooi, H. G., & Moree, W. (2015b). Sorting out the essence of owner-contractor collab­oration in capital project delivery. International Journal of Project Management, 33(3), pp. 664-683. doi: 10.1016/j. ijproman.2014.05.001.Search in Google Scholar

Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017a). A study of project success and procurement frameworks in Indian construction industry. International Journal of Civil Engineering and Technology, 8(3), pp. 167-174.Search in Google Scholar

Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017b). A study of project success and procurement frameworks in Indian construction industry. International Journal of Civil Engineering and Technology, 8(83), pp. 167-174.Search in Google Scholar

Walker, D. H., Hampson, K., & Peters, R. (2002). Project alliancing vs project partnering: A case study of the Australian national museum project. Supply Chain Management: An International Journal, 7(2), pp. 83-91.10.1108/13598540210425830Search in Google Scholar

Wang, C. M., Xu, B. B., Zhang, S. J., & Chen, Y. Q. (2016). Influence of personality and risk propensity on risk perception of Chinese construction project managers. International Journal of Project Management, 34(7), pp. 1294-1304. doi: 10.1016/j. ijproman.2016.07.004.Search in Google Scholar

Wang, T., Tang, W., Qi, D., Shen, W., & Huang, M. (2015). Enhancing design management by partnering in delivery of international epc projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4), p. 04015099.10.1061/(ASCE)CO.1943-7862.0001082Search in Google Scholar

Winch, G. M. (2000). Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155.10.1080/096132100369046Search in Google Scholar

Wong, C. H. (2004). Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. doi: 10.1061/(ASCE)0733- 9364(2004)130:5(691).Search in Google Scholar

Xiao, H., & Proverbs, D. (2003). Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332.10.1108/09699980310502937Search in Google Scholar

Yang, W., Gao, Y., Li, Y., Shen, H., & Zheng, S. (2017). Different roles of control mechanisms in buyer-supplier conflict: An empirical study from China. Industrial Marketing Management, 65, pp. 144-156. doi: 10.1016/j.indmarman.2017.04.002.Search in Google Scholar

eISSN:
1847-6228
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
Volume Open
Fachgebiete der Zeitschrift:
Technik, Einführungen und Gesamtdarstellungen, andere