INFORMAZIONI SU QUESTO ARTICOLO

Cita

Abdul-Rahman, H., Takim, R. & Min, W. S. (2009) Financial-Related Causes Contributing to Project Delays. Journal of Retail & Leisure Property, 8, 225-238. doi: 10.1057/rlp.2009.11 Open DOISearch in Google Scholar

Al-Joburi, K., Al-Aomar, R., & Bahri, M. (2012). Analyzing the Impact of Negative Cash Flow on Construction Performance in 2 the Dubai Area. Journal of Management in Engineering, 15(2), 1-28. Search in Google Scholar

AL-Nassafi, N. M., (2022) The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait. Journal of Asian Finance, Economics and Business, 9(3), 0053-0063. Search in Google Scholar

Al-Subaie, A. A., Faisal, M. N., Aouni, B., & Jabeen, F. (2021). Investigating the role of leadership styles and governance on project performance in mega-projects. Polish Journal of Management Studies, 23(1), 45-58. Search in Google Scholar

Bassioni, H. (2004). A Framework for Measuring Business Performance in Construction Contracting Organizations. Published PhD thesis. Loghborough, UK: Loughborough University. Search in Google Scholar

Djatmiko, B. (2017). Modelling of Project Cash Flow on Construction Projects in Malang City. AIP Conference Proceedings, 1887, 020014. Search in Google Scholar

Elazouni M. A., & Gab-Allah, A. A. (2004). Finance-based scheduling of construction project using integer programming. Journal of Construction Engineering and Management, 130(1), 15-24. Search in Google Scholar

Guracanli, E., Turkoglu, H., & Bilir, S. (2017). Heavy Equipment Scheduling for Horizontal Construction Projects. Procedia Engineering, 182(1), 265-273. Search in Google Scholar

Ho, D. C. P., Ahmed, S. M., Kwan, J. C., & Ming, F. Y. W. (2000). Site Safety Management in Hong Kong. Journal of Management in Engineering, 16, 34-42. doi: 10.1061/(ASCE)0742-597X(2000)16:6(34) Open DOISearch in Google Scholar

Iyer, K. C., Chaphalkar, N. B., Joshi, G. A. (2008). Understanding time delay disputes in construction contracts. International Journal of Project Management, 26(2), 174-184. doi: 10.1016/j.ijproman.2007.05.002 Open DOISearch in Google Scholar

Koehn, E., & Datta, N. (2003). Quality, Environmental, and Health and Safety Management Systems for Construction Engineering. Journal of Construction Engineering and Management, 129(5), 562-569. Search in Google Scholar

Koelmans, R. G. (2004). Project success and performance evaluation. In Proceedings of the International Platinum Conference “Platinum Adding Value”. The South African Institute of Mining and Metallurgy, Read, Swatman and Voigt (Pty) Limited. Search in Google Scholar

Koopman, K., & Cumberlege, R. (2021). Cash flow management by contractors. IOP Conf. Series: Earth and Environmental Science, 654, 012028. Search in Google Scholar

Liang, Y., Ashuri, B., & Li, M. (2021). Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 147(6), 12-31. Search in Google Scholar

Liberzon, V., & Souza Mello, B. P. (2011). Success Driven Project Management (SDPM) Approach to Project Planning and Performance Analysis. The 8th Annual PMI College of Scheduling, San Francisco. Search in Google Scholar

Mahmoud, H., Ahmed, V., & Beheiry, S. (2021). Construction Cash Flow Risk Index. Journal of Risk and Financial Management, 14(1), 1-17. Search in Google Scholar

Makulwasaatudom, A., Emsley, M., & Sinthawanarong, K. (2003). Critical Factors Influencing Construction Productivity in Thailand. In Second International Conference on Construction in the 21st Century (CITC-II). Sustainability and Innovation in Management and Technology. Hong Kong. Search in Google Scholar

McInnis, J., & Collins, D. W. (2011). The effect of cash flow forecasts on accrual quality and benchmark beating. Journal of Accounting and Economics, 51(3), 219-239. Search in Google Scholar

Michael, W. (2018). Cash flow duration and the term structure of equity returns. Journal of Financial Economics, 128(1), 486-503. Search in Google Scholar

Moore, D., McCabe, G., & Craig, B. (2006). Introduction to the Practice of Statistics. Sixth edition. USA: W. H. Freeman and Company. Search in Google Scholar

Parfitt, M. K., & Sanvido, V. E. (1993). Checklist of Critical Success Factors for Building Projects. Journal of Management in Engineering, 9(3), 243-249. Search in Google Scholar

Purnus, A., & Bodea, C. N. (2015). Financial management of the construction projects: a proposed cash flow analysis model at project portfolio level. Organization, Technology and Management in Construction: An International Journal, 7(1), 1217-1227. Search in Google Scholar

Purnus, A., & Bodea, C. N. (2016). Multi-criteria Cash Flow Analysis in Construction Projects. Procedia Engineering, 164(1), 98-105. Search in Google Scholar

Sarrireh, M., & Tarawneh, S. (2014). Safety Concept, Value and Cost in Construction Projects in Jordan. Civil and Environmental Research, 6(5), 2224-5790. Search in Google Scholar

Sekaran, U. (2010) Research Methods for Business: A Skill-Building Approach. 4th Edition. John Wiley and Sons, UK. Search in Google Scholar

Sharifi, M., & Bagherpour, M. (2016). Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach. Periodica Polytechnica Civil Engineering, 60(3), 337-344. Search in Google Scholar

Shash, A. A., & Qarra, A. A. (2018). Cash Flow Management of Construction Projects in Saudi Arabia. Project Management Journal, 49(5), 48-63. doi: 10.1177/8756972818787976 Open DOISearch in Google Scholar

Sinesilassie, E. G., Tabish, S. Z. S., Jha, K. N. (2017). Critical factors affecting schedule performance: A case of Ethiopian public construction projects – engineers’ perspective. Engineering, Construction and Architectural Management, 24(5), 757-773. doi: 10.1108/ECAM-03-2016-0062 Open DOISearch in Google Scholar

Sinesilassiea, E. G., Tabishb, S. Z. S., & Jhaa, K. N. (2017). Critical factors affecting cost performance: a case of Ethiopian public construction projects”. Search in Google Scholar

Sinesilassiea, E. G., Tabishb, S. Z. S., & Jhaa, K. N. (2017). Critical factors affecting cost performance: a case of Ethiopian public construction projects. International Journal of Construction Management, 17 (1), 24-49. doi: 10.1061/(ASCE)CO.1943-7862.0001280 Open DOISearch in Google Scholar

Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665-674. Search in Google Scholar

Tarawneh S. A., Sarireh M., & Radi, E. (2020). Time and Cost Overruns in Jordanian Building Construction Projects. Mu’tah Lil-Buhuth wad-Dirasat, Natural and Applied Sciences Series, 35(1), 53-73. Search in Google Scholar

Tunji-Olayeni, P., Mosaku, T., Fagbenle, O., Omuh, I., & Joshua, O. (2016). Evaluating Construction Project Performance: A Case of Construction SMEs in Lagos, Nigeria. Journal of Innovation and Business Best Practices, 2016, 482398. doi: 10.5171/2016.482398 Open DOISearch in Google Scholar

Windapo, A., & Cattel, K. (2013). The South African construction industry: perceptions of key challenges facing its performance, development and growth. Journal of Construction in Developing Countries, 18(2), 65-79. Search in Google Scholar

Zayed, T., & Liu, Y. (2014). Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), 170-189. Search in Google Scholar