[
Abdul-Rahman, H., Takim, R. & Min, W. S. (2009) Financial-Related Causes Contributing to Project Delays. Journal of Retail & Leisure Property, 8, 225-238. doi: 10.1057/rlp.2009.11
]Open DOISearch in Google Scholar
[
Al-Joburi, K., Al-Aomar, R., & Bahri, M. (2012). Analyzing the Impact of Negative Cash Flow on Construction Performance in 2 the Dubai Area. Journal of Management in Engineering, 15(2), 1-28.
]Search in Google Scholar
[
AL-Nassafi, N. M., (2022) The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait. Journal of Asian Finance, Economics and Business, 9(3), 0053-0063.
]Search in Google Scholar
[
Al-Subaie, A. A., Faisal, M. N., Aouni, B., & Jabeen, F. (2021). Investigating the role of leadership styles and governance on project performance in mega-projects. Polish Journal of Management Studies, 23(1), 45-58.
]Search in Google Scholar
[
Bassioni, H. (2004). A Framework for Measuring Business Performance in Construction Contracting Organizations. Published PhD thesis. Loghborough, UK: Loughborough University.
]Search in Google Scholar
[
Djatmiko, B. (2017). Modelling of Project Cash Flow on Construction Projects in Malang City. AIP Conference Proceedings, 1887, 020014.
]Search in Google Scholar
[
Elazouni M. A., & Gab-Allah, A. A. (2004). Finance-based scheduling of construction project using integer programming. Journal of Construction Engineering and Management, 130(1), 15-24.
]Search in Google Scholar
[
Guracanli, E., Turkoglu, H., & Bilir, S. (2017). Heavy Equipment Scheduling for Horizontal Construction Projects. Procedia Engineering, 182(1), 265-273.
]Search in Google Scholar
[
Ho, D. C. P., Ahmed, S. M., Kwan, J. C., & Ming, F. Y. W. (2000). Site Safety Management in Hong Kong. Journal of Management in Engineering, 16, 34-42. doi: 10.1061/(ASCE)0742-597X(2000)16:6(34)
]Open DOISearch in Google Scholar
[
Iyer, K. C., Chaphalkar, N. B., Joshi, G. A. (2008). Understanding time delay disputes in construction contracts. International Journal of Project Management, 26(2), 174-184. doi: 10.1016/j.ijproman.2007.05.002
]Open DOISearch in Google Scholar
[
Koehn, E., & Datta, N. (2003). Quality, Environmental, and Health and Safety Management Systems for Construction Engineering. Journal of Construction Engineering and Management, 129(5), 562-569.
]Search in Google Scholar
[
Koelmans, R. G. (2004). Project success and performance evaluation. In Proceedings of the International Platinum Conference “Platinum Adding Value”. The South African Institute of Mining and Metallurgy, Read, Swatman and Voigt (Pty) Limited.
]Search in Google Scholar
[
Koopman, K., & Cumberlege, R. (2021). Cash flow management by contractors. IOP Conf. Series: Earth and Environmental Science, 654, 012028.
]Search in Google Scholar
[
Liang, Y., Ashuri, B., & Li, M. (2021). Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 147(6), 12-31.
]Search in Google Scholar
[
Liberzon, V., & Souza Mello, B. P. (2011). Success Driven Project Management (SDPM) Approach to Project Planning and Performance Analysis. The 8th Annual PMI College of Scheduling, San Francisco.
]Search in Google Scholar
[
Mahmoud, H., Ahmed, V., & Beheiry, S. (2021). Construction Cash Flow Risk Index. Journal of Risk and Financial Management, 14(1), 1-17.
]Search in Google Scholar
[
Makulwasaatudom, A., Emsley, M., & Sinthawanarong, K. (2003). Critical Factors Influencing Construction Productivity in Thailand. In Second International Conference on Construction in the 21st Century (CITC-II). Sustainability and Innovation in Management and Technology. Hong Kong.
]Search in Google Scholar
[
McInnis, J., & Collins, D. W. (2011). The effect of cash flow forecasts on accrual quality and benchmark beating. Journal of Accounting and Economics, 51(3), 219-239.
]Search in Google Scholar
[
Michael, W. (2018). Cash flow duration and the term structure of equity returns. Journal of Financial Economics, 128(1), 486-503.
]Search in Google Scholar
[
Moore, D., McCabe, G., & Craig, B. (2006). Introduction to the Practice of Statistics. Sixth edition. USA: W. H. Freeman and Company.
]Search in Google Scholar
[
Parfitt, M. K., & Sanvido, V. E. (1993). Checklist of Critical Success Factors for Building Projects. Journal of Management in Engineering, 9(3), 243-249.
]Search in Google Scholar
[
Purnus, A., & Bodea, C. N. (2015). Financial management of the construction projects: a proposed cash flow analysis model at project portfolio level. Organization, Technology and Management in Construction: An International Journal, 7(1), 1217-1227.
]Search in Google Scholar
[
Purnus, A., & Bodea, C. N. (2016). Multi-criteria Cash Flow Analysis in Construction Projects. Procedia Engineering, 164(1), 98-105.
]Search in Google Scholar
[
Sarrireh, M., & Tarawneh, S. (2014). Safety Concept, Value and Cost in Construction Projects in Jordan. Civil and Environmental Research, 6(5), 2224-5790.
]Search in Google Scholar
[
Sekaran, U. (2010) Research Methods for Business: A Skill-Building Approach. 4th Edition. John Wiley and Sons, UK.
]Search in Google Scholar
[
Sharifi, M., & Bagherpour, M. (2016). Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach. Periodica Polytechnica Civil Engineering, 60(3), 337-344.
]Search in Google Scholar
[
Shash, A. A., & Qarra, A. A. (2018). Cash Flow Management of Construction Projects in Saudi Arabia. Project Management Journal, 49(5), 48-63. doi: 10.1177/8756972818787976
]Open DOISearch in Google Scholar
[
Sinesilassie, E. G., Tabish, S. Z. S., Jha, K. N. (2017). Critical factors affecting schedule performance: A case of Ethiopian public construction projects – engineers’ perspective. Engineering, Construction and Architectural Management, 24(5), 757-773. doi: 10.1108/ECAM-03-2016-0062
]Open DOISearch in Google Scholar
[
Sinesilassiea, E. G., Tabishb, S. Z. S., & Jhaa, K. N. (2017). Critical factors affecting cost performance: a case of Ethiopian public construction projects”.
]Search in Google Scholar
[
Sinesilassiea, E. G., Tabishb, S. Z. S., & Jhaa, K. N. (2017). Critical factors affecting cost performance: a case of Ethiopian public construction projects. International Journal of Construction Management, 17 (1), 24-49. doi: 10.1061/(ASCE)CO.1943-7862.0001280
]Open DOISearch in Google Scholar
[
Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665-674.
]Search in Google Scholar
[
Tarawneh S. A., Sarireh M., & Radi, E. (2020). Time and Cost Overruns in Jordanian Building Construction Projects. Mu’tah Lil-Buhuth wad-Dirasat, Natural and Applied Sciences Series, 35(1), 53-73.
]Search in Google Scholar
[
Tunji-Olayeni, P., Mosaku, T., Fagbenle, O., Omuh, I., & Joshua, O. (2016). Evaluating Construction Project Performance: A Case of Construction SMEs in Lagos, Nigeria. Journal of Innovation and Business Best Practices, 2016, 482398. doi: 10.5171/2016.482398
]Open DOISearch in Google Scholar
[
Windapo, A., & Cattel, K. (2013). The South African construction industry: perceptions of key challenges facing its performance, development and growth. Journal of Construction in Developing Countries, 18(2), 65-79.
]Search in Google Scholar
[
Zayed, T., & Liu, Y. (2014). Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), 170-189.
]Search in Google Scholar