This work is licensed under the Creative Commons Attribution 4.0 International License.
Yu Haotian. Design and Implementation of BIM-based Construction Engineering Quality Supervision and Management System [J]. Engineering Technology Research, 2019, 4(18):128–129.(in Chinese)Search in Google Scholar
C. S. Kamal. Quantitative Risk Analysis of Water Project Investment under the Current Valuation Models of Engineering Quantity Bill[J]. Journal of Yangtze River Scientific Research Institute, 2013, 27(23):267–276.Search in Google Scholar
M. Kociecki, H. Adeli. Two-phase genetic algorithm for size optimization of free-form steel space frame roof structures[J]. Journal of Constructional Steel Research, 2013, 90:283–296.Search in Google Scholar
Gao Bin. Application analysis of BIM technology in prefabricated building construction quality management [J]. China Strategic Emerging Industry, 2019 (30):110. (in Chinese)Search in Google Scholar
Zhang Ailin, Zhang Xiuying, Li Lu. Research on the application of information integration dynamic management system in the construction stage of prefabricated buildings based on BIM technology [J]. Manufacturing Automation, 2019(10):157–161. (in Chinese)Search in Google Scholar
M. Mangal, J. Cheng. Automated optimization of steel reinforcement in RC building frames usingbuilding information modeling and hybrid genetic algorithm[J]. Automation in Construction, 2018(90):39–57.Search in Google Scholar
Chen Lingyu, Zhang Chaobi, Jiang Guanqiu. Life cycle management of assembled buildings based on BIM and RFID technology [J]. Chongqing Architecture, 2020, 19(3): 18–19. (in Chinese)Search in Google Scholar
M. E. Mostafa, Y. F. Rashed, W. Elhaddad. BIM Standards for Automated BEM Structural Analysis and Design of RC Plates[J]. Journal of Computing in Civil Engineering, 2016, 30(4):356–360.Search in Google Scholar
Liu Jian, Xu Haoqi. Application analysis of BIM technology in the whole life cycle of green buildings [J]. China Management Informatization, 2019, 22(20):154–155. (in Chinese)Search in Google Scholar
H. Hofmeyer, J. M. Delgado. Automated design studies: Topology versus One-Step Evolutionary Structural Optimisation[J]. Advanced Engineering Informatics. IET Digital Library, 2014, 27(4):27–43.Search in Google Scholar
Sun Peng. Application practice of BIM technology in prefabricated building construction [J]. Changjiang Technology and Economy, 2021, 5(S1):31 ∼ 33 (in Chinese)Search in Google Scholar
A. Ra Ko, J. H. Lee, H. S. Jang, et al. Development of Automatic Reinforcement Bar Placementfor RC Walls Based on Structural Building Information Modeling (S-BIM)[J]. Advanced Materials Research, 2013(71):623–628.Search in Google Scholar
M. E. Mostafa, Y. F. Rashed, W. Elhaddad. BIM Standards for Automated BEM Structural Analysis and Design of RC Plates[J]. Journal of Computing in Civil Engineering, 2016, 30(4):356–360.Search in Google Scholar
Zhao Guanghui. Exploring the application of BIM technology in prefabricated buildings [J]. Sichuan Building Materials, 2021, 47(2):119 ∼ 120, 122 (in Chinese)Search in Google Scholar
Sungyol Song, Jeongsam Yang, Namhyuk Kim. Development of a BIM-based structural framework optimization and construction[J]. Computers in Industry, 2015(63)9:895–912.Search in Google Scholar
M. Mangal, J. Cheng. Automated optimization of steel reinforcement in RC building frames using building information modeling and hybrid genetic algorithm[J]. Automation in Construction, 2018(90):39–57.Search in Google Scholar
Li Bo. Analysis and application of influencing factors of cost optimization of different structural forms in design stage [D]. Ganzhou: Jiangxi University of Science and Technology, 2015. (in Chinese)Search in Google Scholar
Bellenguez O, Emmanuel Néron. Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills[M]//Practice and Theory of Automated Timetabling V. Springer Berlin Heidelberg, 2004.Search in Google Scholar
Anulark Naber, Rainer Kolisch. MIP models for resource-constrained project scheduling with flexible resource profiles. 2014, 239(2):335–348.Search in Google Scholar
Jia Yan, Wang Zhimin, Zhang Yuegang. Heuristic solution of flexible resource-constrained project scheduling problem [J]. Computer Integrated Manufacturing System, 2015, 21(07):1846–1855. (in Chinese)Search in Google Scholar
Liu Yichuan, Liu Guiwen, Fu Yan, Mao Chao, Xu Pengpeng, Hong Jingke, Li Kaijian. Literature review on production scheduling of prefabricated building components [J]. Project management technology, 2019, 17(04):20-25. (in Chinese)Search in Google Scholar