Accès libre

Optimisation of construction mode of residential houses based on the genetic algorithm under BIM technology

À propos de cet article

Citez

Yu Haotian. Design and Implementation of BIM-based Construction Engineering Quality Supervision and Management System [J]. Engineering Technology Research, 2019, 4(18):128–129.(in Chinese) Search in Google Scholar

C. S. Kamal. Quantitative Risk Analysis of Water Project Investment under the Current Valuation Models of Engineering Quantity Bill[J]. Journal of Yangtze River Scientific Research Institute, 2013, 27(23):267–276. Search in Google Scholar

M. Kociecki, H. Adeli. Two-phase genetic algorithm for size optimization of free-form steel space frame roof structures[J]. Journal of Constructional Steel Research, 2013, 90:283–296. Search in Google Scholar

Gao Bin. Application analysis of BIM technology in prefabricated building construction quality management [J]. China Strategic Emerging Industry, 2019 (30):110. (in Chinese) Search in Google Scholar

Zhang Ailin, Zhang Xiuying, Li Lu. Research on the application of information integration dynamic management system in the construction stage of prefabricated buildings based on BIM technology [J]. Manufacturing Automation, 2019(10):157–161. (in Chinese) Search in Google Scholar

M. Mangal, J. Cheng. Automated optimization of steel reinforcement in RC building frames usingbuilding information modeling and hybrid genetic algorithm[J]. Automation in Construction, 2018(90):39–57. Search in Google Scholar

Chen Lingyu, Zhang Chaobi, Jiang Guanqiu. Life cycle management of assembled buildings based on BIM and RFID technology [J]. Chongqing Architecture, 2020, 19(3): 18–19. (in Chinese) Search in Google Scholar

M. E. Mostafa, Y. F. Rashed, W. Elhaddad. BIM Standards for Automated BEM Structural Analysis and Design of RC Plates[J]. Journal of Computing in Civil Engineering, 2016, 30(4):356–360. Search in Google Scholar

Liu Jian, Xu Haoqi. Application analysis of BIM technology in the whole life cycle of green buildings [J]. China Management Informatization, 2019, 22(20):154–155. (in Chinese) Search in Google Scholar

H. Hofmeyer, J. M. Delgado. Automated design studies: Topology versus One-Step Evolutionary Structural Optimisation[J]. Advanced Engineering Informatics. IET Digital Library, 2014, 27(4):27–43. Search in Google Scholar

Sun Peng. Application practice of BIM technology in prefabricated building construction [J]. Changjiang Technology and Economy, 2021, 5(S1):31 ∼ 33 (in Chinese) Search in Google Scholar

A. Ra Ko, J. H. Lee, H. S. Jang, et al. Development of Automatic Reinforcement Bar Placementfor RC Walls Based on Structural Building Information Modeling (S-BIM)[J]. Advanced Materials Research, 2013(71):623–628. Search in Google Scholar

M. E. Mostafa, Y. F. Rashed, W. Elhaddad. BIM Standards for Automated BEM Structural Analysis and Design of RC Plates[J]. Journal of Computing in Civil Engineering, 2016, 30(4):356–360. Search in Google Scholar

Zhao Guanghui. Exploring the application of BIM technology in prefabricated buildings [J]. Sichuan Building Materials, 2021, 47(2):119 ∼ 120, 122 (in Chinese) Search in Google Scholar

Sungyol Song, Jeongsam Yang, Namhyuk Kim. Development of a BIM-based structural framework optimization and construction[J]. Computers in Industry, 2015(63)9:895–912. Search in Google Scholar

M. Mangal, J. Cheng. Automated optimization of steel reinforcement in RC building frames using building information modeling and hybrid genetic algorithm[J]. Automation in Construction, 2018(90):39–57. Search in Google Scholar

Li Bo. Analysis and application of influencing factors of cost optimization of different structural forms in design stage [D]. Ganzhou: Jiangxi University of Science and Technology, 2015. (in Chinese) Search in Google Scholar

Bellenguez O, Emmanuel Néron. Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills[M]//Practice and Theory of Automated Timetabling V. Springer Berlin Heidelberg, 2004. Search in Google Scholar

Anulark Naber, Rainer Kolisch. MIP models for resource-constrained project scheduling with flexible resource profiles. 2014, 239(2):335–348. Search in Google Scholar

Jia Yan, Wang Zhimin, Zhang Yuegang. Heuristic solution of flexible resource-constrained project scheduling problem [J]. Computer Integrated Manufacturing System, 2015, 21(07):1846–1855. (in Chinese) Search in Google Scholar

Liu Yichuan, Liu Guiwen, Fu Yan, Mao Chao, Xu Pengpeng, Hong Jingke, Li Kaijian. Literature review on production scheduling of prefabricated building components [J]. Project management technology, 2019, 17(04):20-25. (in Chinese) Search in Google Scholar

eISSN:
2444-8656
Langue:
Anglais
Périodicité:
Volume Open
Sujets de la revue:
Life Sciences, other, Mathematics, Applied Mathematics, General Mathematics, Physics