Accès libre

Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study

À propos de cet article

Citez

This article aims to analyze productivity issues during the implementation of plastering works on the case study of a residential complex. The results of the study revealed that establishing a proper work schedule and adhering to the Takt schedule resulted in a 19% increase in plastering productivity compared to non-Takt schedules. Furthermore, the study identified the existence of waste, which had a negative impact on the progress of the plastering work and could have been prevented through better project planning during the initial project phases.

eISSN:
1338-7278
Langue:
Anglais
Périodicité:
2 fois par an
Sujets de la revue:
Engineering, Introductions and Overviews, other