Accès libre

Unsupervised machine learning for identifying key risk factors contributing to construction delays

,  et   
08 août 2024
À propos de cet article

Citez
Télécharger la couverture

Abd Karim, N. A., Rahman, I. A., Memmon, A. H., Jamil, N., & Azis, A. A. A. (2012, December). Significant risk factors in construction projects: Contractor’s perception. In 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER). IEEE, pp. 347–350. Abd Karim N. A. Rahman I. A. Memmon A. H. Jamil N. Azis A. A. A. ( 2012 , December ). Significant risk factors in construction projects: Contractor’s perception . In 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER) . IEEE , pp. 347 350 . Search in Google Scholar

Adedokun, O., Egbelakin, T., & Omotayo, T. (2023). Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 1–9. Adedokun O. Egbelakin T. Omotayo T. ( 2023 ). Random forest and path diagram taxonomies of risks influencing higher education construction projects . International Journal of Construction Management , 24 ( 1 ), pp. 1 9 . Search in Google Scholar

Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction Delays in Florida: An Empirical Study. Final report. Department of Community Affairs, Florida, US. Ahmed S. M. Azhar S. Castillo M. Kappagantula P. ( 2002 ). Construction Delays in Florida: An Empirical Study . Final report. Department of Community Affairs , Florida, US . Search in Google Scholar

Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677. Aibinu A. A. Odeyinka H. A. ( 2006 ). Construction delays and their causative factors in Nigeria . Journal of Construction Engineering and Management , 132 ( 7 ), pp. 667 677 . Search in Google Scholar

Akomah, B. B., & Jackson, E. N. (2016). Contractors perception of factors contributing to road project delay. International Journal of Construction Engineering and Management, 5(3), pp. 79–85. Akomah B. B. Jackson E. N. ( 2016 ). Contractors perception of factors contributing to road project delay . International Journal of Construction Engineering and Management , 5 ( 3 ), pp. 79 85 . Search in Google Scholar

Al Zubaidi, H., & Al Otaibi, S. (2008). An empirical approach for identifying critical time-ovrerun risk factors in Kuwait’s construction projects. Journal of Economic and Administrative Sciences, 24(2), pp. 35–53. Al Zubaidi H. Al Otaibi S. ( 2008 ). An empirical approach for identifying critical time-ovrerun risk factors in Kuwait’s construction projects . Journal of Economic and Administrative Sciences , 24 ( 2 ), pp. 35 53 . Search in Google Scholar

Alajmi, A. M., & Ahmed Memon, Z. (2022). A review on significant factors causing delays in Saudi Arabia construction projects. Smart Cities, 5(4), pp. 1465–1487. Alajmi A. M. Ahmed Memon Z. ( 2022 ). A review on significant factors causing delays in Saudi Arabia construction projects . Smart Cities , 5 ( 4 ), pp. 1465 1487 . Search in Google Scholar

Ali, A. S., Smith, A., Pitt, M., & Choon, C. H. (2010). Contractors’ perception of factors contributing to project delay: Case studies of commercial projects in Klang valley, Malaysia. Journal of Design and Built Environment, 7(1), pp. 1–17. Ali A. S. Smith A. Pitt M. Choon C. H. ( 2010 ). Contractors’ perception of factors contributing to project delay: Case studies of commercial projects in Klang valley, Malaysia . Journal of Design and Built Environment , 7 ( 1 ), pp. 1 17 . Search in Google Scholar

Al-Momani, A. H. (2000). Construction delay: A quantitative analysis. International Journal of Project Management, 18(1), pp. 51–59. Al-Momani A. H. ( 2000 ). Construction delay: A quantitative analysis . International Journal of Project Management , 18 ( 1 ), pp. 51 59 . Search in Google Scholar

Alshihri, S., Al-Gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7), p. 902. Alshihri S. Al-Gahtani K. Almohsen A. ( 2022 ). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia . Buildings , 12 ( 7 ), p. 902 . Search in Google Scholar

Buertey, J. I. T., Miezah, A. K., & Adjei-Kumi, T. (2013, August). Delays to large construction projects in Ghana: A risk overview. In Proceedings: 5th West Africa Built Environment Research (WABER) Conference. Accra, Ghana: WABER Conference, (pp. 367–380). Buertey J. I. T. Miezah A. K. Adjei-Kumi T. ( 2013 , August ). Delays to large construction projects in Ghana: A risk overview . In Proceedings: 5th West Africa Built Environment Research (WABER) Conference . Accra, Ghana : WABER Conference , (pp. 367 380 ). Search in Google Scholar

Chen, Z. J., Hsieh, T. S., & Mousavi Davoudi, S. M. (2022). Analysis of factors affecting the success of sustainable development projects with the help of machine learning tools. Discrete Dynamics in Nature and Society, 2022, pp. 1–9. Chen Z. J. Hsieh T. S. Mousavi Davoudi S. M. ( 2022 ). Analysis of factors affecting the success of sustainable development projects with the help of machine learning tools . Discrete Dynamics in Nature and Society , 2022 , pp. 1 9 . Search in Google Scholar

Cheng, M. Y., & Darsa, M. H. (2021). Construction schedule risk assessment and management strategy for foreign general contractors working in the Ethiopian construction industry. Sustainability, 13(14), p. 7830. Cheng M. Y. Darsa M. H. ( 2021 ). Construction schedule risk assessment and management strategy for foreign general contractors working in the Ethiopian construction industry . Sustainability , 13 ( 14 ), p. 7830 . Search in Google Scholar

Choudhry, R. M., Aslam, M. A., Hinze, J. W., & Arain, F. M. (2014). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7), p. 04014020. Choudhry R. M. Aslam M. A. Hinze J. W. Arain F. M. ( 2014 ). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines . Journal of Construction Engineering and Management , 140 ( 7 ), p. 04014020 . Search in Google Scholar

Do, S. T., Nguyen, V. T., Tran, C. N., & Aung, Z. M. (2023). Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999–2011. Do S. T. Nguyen V. T. Tran C. N. Aung Z. M. ( 2023 ). Identifying and evaluating the key claim causes leading to construction delays . International Journal of Construction Management , 23 ( 12 ), pp. 1999 2011 . Search in Google Scholar

Egwim, C. N., Alaka, H., Toriola-Coker, L. O., Balogun, H., & Sunmola, F. (2021). Applied artificial intelligence for predicting construction projects delay. Machine Learning with Applications, 6, p. 100166. Egwim C. N. Alaka H. Toriola-Coker L. O. Balogun H. Sunmola F. ( 2021 ). Applied artificial intelligence for predicting construction projects delay . Machine Learning with Applications , 6 , p. 100166 . Search in Google Scholar

Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), pp. 1–9. Fashina A. A. Omar M. A. Sheikh A. A. Fakunle F. F. ( 2021 ). Exploring the significant factors that influence delays in construction projects in Hargeisa . Heliyon , 7 ( 4 ), pp. 1 9 . Search in Google Scholar

Gardezi, S. S. S., Manarvi, I. A., & Gardezi, S. J. S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77, pp. 196–204. Gardezi S. S. S. Manarvi I. A. Gardezi S. J. S. ( 2014 ). Time extension factors in construction industry of Pakistan . Procedia Engineering , 77 , pp. 196 204 . Search in Google Scholar

Hossen, M. M., Kang, S., & Kim, J. (2015). Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project. Nuclear Engineering and Technology, 47(3), pp. 362–379. Hossen M. M. Kang S. Kim J. ( 2015 ). Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project . Nuclear Engineering and Technology , 47 ( 3 ), pp. 362 379 . Search in Google Scholar

Hung, M. S., & Wang, J. (2016). Research on delay risks of EPC hydropower construction projects in Vietnam. Journal of Power and Energy Engineering, 4(4), pp. 9–16. Hung M. S. Wang J. ( 2016 ). Research on delay risks of EPC hydropower construction projects in Vietnam . Journal of Power and Energy Engineering , 4 ( 4 ), pp. 9 16 . Search in Google Scholar

Ivanović, M. Z., Nedeljković, Đ., Stojadinović, Z., Marinković, D., Ivanišević, N., & Simić, N. (2022). Detection and in-depth analysis of causes of delay in construction projects: Synergy between machine learning and expert knowledge. Sustainability, 14(22), p. 14927. Ivanović M. Z. Nedeljković Đ. Stojadinović Z. Marinković D. Ivanišević N. Simić N. ( 2022 ). Detection and in-depth analysis of causes of delay in construction projects: Synergy between machine learning and expert knowledge . Sustainability , 14 ( 22 ), p. 14927 . Search in Google Scholar

Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165–194. Jarkas A. M. Haupt T. C. ( 2015 ). Major construction risk factors considered by general contractors in Qatar . Journal of Engineering, Design and Technology , 13 ( 1 ), pp. 165 194 . Search in Google Scholar

Jarkas, A. M., & Younes, J. H. (2014). Principle factors contributing to construction delays in the State of Qatar. International Journal of Construction Project Management, 6(1), p. 39. Jarkas A. M. Younes J. H. ( 2014 ). Principle factors contributing to construction delays in the State of Qatar . International Journal of Construction Project Management , 6 ( 1 ), p. 39 . Search in Google Scholar

Kassem, M., Khoiry, M. A., & Hamzah, N. (2020). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14(3), pp. 527–546. Kassem M. Khoiry M. A. Hamzah N. ( 2020 ). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen . International Journal of Energy Sector Management , 14 ( 3 ), pp. 527 546 . Search in Google Scholar

Kesavan, M., Gobidan, N. N., & Dissanayake, P. B. G. (2015). Analysis of factors contributing civil engineering project delays in Sri Lanka. In 6th International Conference on Structural Engineering and Construction Management 2015, pp. 40–46. Kesavan M. Gobidan N. N. Dissanayake P. B. G. ( 2015 ). Analysis of factors contributing civil engineering project delays in Sri Lanka . In 6th International Conference on Structural Engineering and Construction Management 2015 , pp. 40 46 . Search in Google Scholar

Mahamid, I. (2016). Factors contributing to poor performance in construction projects: Studies of Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12(1), pp. 27–38. Mahamid I. ( 2016 ). Factors contributing to poor performance in construction projects: Studies of Saudi Arabia . Australian Journal of Multi-Disciplinary Engineering , 12 ( 1 ), pp. 27 38 . Search in Google Scholar

Melaku Belay, S., Tilahun, S., Yehualaw, M., Matos, J., Sousa, H., & Workneh, E. T. (2021). Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: Case studies in Ethiopia. Advances in Civil Engineering, 2021, pp. 1–15. Melaku Belay S. Tilahun S. Yehualaw M. Matos J. Sousa H. Workneh E. T. ( 2021 ). Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: Case studies in Ethiopia . Advances in Civil Engineering , 2021 , pp. 1 15 . Search in Google Scholar

Mpofu, B., Ochieng, E. G., Moobela, C., & Pretorius, A. (2017). Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), pp. 346–376. Mpofu B. Ochieng E. G. Moobela C. Pretorius A. ( 2017 ). Profiling causative factors leading to construction project delays in the United Arab Emirates . Engineering, Construction and Architectural Management , 24 ( 2 ), pp. 346 376 . Search in Google Scholar

Prateepasen, A., & Aumpiem, A. (2021). Problems causing delays and risk factors in welding construction projects of Thailand. Engineering Journal, 25(5), pp. 33–44. Prateepasen A. Aumpiem A. ( 2021 ). Problems causing delays and risk factors in welding construction projects of Thailand . Engineering Journal , 25 ( 5 ), pp. 33 44 . Search in Google Scholar

Rauzana, A., & Dharma, W. (2022). Causes of delays in construction projects in the Province of Aceh, Indonesia. PLoS One, 17(1), e0263337. Rauzana A. Dharma W. ( 2022 ). Causes of delays in construction projects in the Province of Aceh, Indonesia . PLoS One , 17 ( 1 ), e0263337 . Search in Google Scholar

Salem, Z. T. A., & Suleiman, A. (2020). Risk factors causing time delay in the Jordanian construction sector. International Journal of Engineering Research and Technology, 13(2), pp. 307–315. Salem Z. T. A. Suleiman A. ( 2020 ). Risk factors causing time delay in the Jordanian construction sector . International Journal of Engineering Research and Technology , 13 ( 2 ), pp. 307 315 . Search in Google Scholar

Shoar, S., Chileshe, N., & Edwards, J. D. (2022). Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression. Journal of Building Engineering, 50, p. 104102. Shoar S. Chileshe N. Edwards J. D. ( 2022 ). Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression . Journal of Building Engineering , 50 , p. 104102 . Search in Google Scholar

Uddin, S., Ong, S., & Lu, H. (2022). Machine learning in project analytics: A data-driven framework and case study. Scientific Reports, 12(1), pp. 15252. Uddin S. Ong S. Lu H. ( 2022 ). Machine learning in project analytics: A data-driven framework and case study . Scientific Reports , 12 ( 1 ), pp. 15252 . Search in Google Scholar

Van, T. N., & Quoc, T. N. (2021). Research trends on machine learning in construction management: A scientometric analysis. Journal of Applied Science and Technology Trends, 2(03), pp. 96–104. Van T. N. Quoc T. N. ( 2021 ). Research trends on machine learning in construction management: A scientometric analysis . Journal of Applied Science and Technology Trends , 2 ( 03 ), pp. 96 104 . Search in Google Scholar

Wuni, I. Y., Shen, G. Q., & Mahmud, A. T. (2022). Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133–147. Wuni I. Y. Shen G. Q. Mahmud A. T. ( 2022 ). Critical risk factors in the application of modular integrated construction: A systematic review . International Journal of Construction Management , 22 ( 2 ), pp. 133 147 . Search in Google Scholar

Yu, B., Guo, Z., Asian, S., Wang, H., & Chen, G. (2019). Flight delay prediction for commercial air transport: A deep learning approach. Transportation Research Part E: Logistics and Transportation Review, 125, pp. 203–221. Yu B. Guo Z. Asian S. Wang H. Chen G. ( 2019 ). Flight delay prediction for commercial air transport: A deep learning approach . Transportation Research Part E: Logistics and Transportation Review , 125 , pp. 203 221 . Search in Google Scholar

Zafar, I., Yousaf, T., & Ahmed, D. S. (2016). Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan–a case study. KSCE Journal of Civil Engineering, 20, pp. 1613–1620. Zafar I. Yousaf T. Ahmed D. S. ( 2016 ). Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan–a case study . KSCE Journal of Civil Engineering , 20 , pp. 1613 1620 . Search in Google Scholar

Zhao, Y., Chen, W., Arashpour, M., Yang, Z., Shao, C., & Li, C. (2022b). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753–1776. Zhao Y. Chen W. Arashpour M. Yang Z. Shao C. Li C. ( 2022b ). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption . Engineering, Construction and Architectural Management , 29 ( 4 ), pp. 1753 1776 . Search in Google Scholar

Zhao, Y., Chen, W., Yang, Z., Li, Z., & Wang, Y. (2022a). Analysis on risk factors related delay in PCPs. Engineering, Construction and Architectural Management, 30(10), pp. 4609–4644. Zhao Y. Chen W. Yang Z. Li Z. Wang Y. ( 2022a ). Analysis on risk factors related delay in PCPs . Engineering, Construction and Architectural Management , 30 ( 10 ), pp. 4609 4644 . Search in Google Scholar

Langue:
Anglais
Périodicité:
1 fois par an
Sujets de la revue:
Ingénierie, Présentations et aperçus, Ingénierie, autres