Abd Karim, N. A., Rahman, I. A., Memmon, A. H., Jamil, N., & Azis, A. A. A. (2012, December). Significant risk factors in construction projects: Contractor’s perception. In 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER). IEEE, pp. 347–350.Abd KarimN. A.RahmanI. A.MemmonA. H.JamilN.AzisA. A. A. (2012, December). Significant risk factors in construction projects: Contractor’s perception. In 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER). IEEE, pp. 347–350.Search in Google Scholar
Adedokun, O., Egbelakin, T., & Omotayo, T. (2023). Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 1–9.AdedokunO.EgbelakinT.OmotayoT. (2023). Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 1–9.Search in Google Scholar
Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction Delays in Florida: An Empirical Study. Final report. Department of Community Affairs, Florida, US.AhmedS. M.AzharS.CastilloM.KappagantulaP. (2002). Construction Delays in Florida: An Empirical Study. Final report. Department of Community Affairs, Florida, US.Search in Google Scholar
Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677.AibinuA. A.OdeyinkaH. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677.Search in Google Scholar
Akomah, B. B., & Jackson, E. N. (2016). Contractors perception of factors contributing to road project delay. International Journal of Construction Engineering and Management, 5(3), pp. 79–85.AkomahB. B.JacksonE. N. (2016). Contractors perception of factors contributing to road project delay. International Journal of Construction Engineering and Management, 5(3), pp. 79–85.Search in Google Scholar
Al Zubaidi, H., & Al Otaibi, S. (2008). An empirical approach for identifying critical time-ovrerun risk factors in Kuwait’s construction projects. Journal of Economic and Administrative Sciences, 24(2), pp. 35–53.Al ZubaidiH.Al OtaibiS. (2008). An empirical approach for identifying critical time-ovrerun risk factors in Kuwait’s construction projects. Journal of Economic and Administrative Sciences, 24(2), pp. 35–53.Search in Google Scholar
Alajmi, A. M., & Ahmed Memon, Z. (2022). A review on significant factors causing delays in Saudi Arabia construction projects. Smart Cities, 5(4), pp. 1465–1487.AlajmiA. M.Ahmed MemonZ. (2022). A review on significant factors causing delays in Saudi Arabia construction projects. Smart Cities, 5(4), pp. 1465–1487.Search in Google Scholar
Ali, A. S., Smith, A., Pitt, M., & Choon, C. H. (2010). Contractors’ perception of factors contributing to project delay: Case studies of commercial projects in Klang valley, Malaysia. Journal of Design and Built Environment, 7(1), pp. 1–17.AliA. S.SmithA.PittM.ChoonC. H. (2010). Contractors’ perception of factors contributing to project delay: Case studies of commercial projects in Klang valley, Malaysia. Journal of Design and Built Environment, 7 (1), pp. 1–17.Search in Google Scholar
Al-Momani, A. H. (2000). Construction delay: A quantitative analysis. International Journal of Project Management, 18(1), pp. 51–59.Al-MomaniA. H. (2000). Construction delay: A quantitative analysis. International Journal of Project Management, 18 (1), pp. 51–59.Search in Google Scholar
Alshihri, S., Al-Gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7), p. 902.AlshihriS.Al-GahtaniK.AlmohsenA. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12 (7), p. 902.Search in Google Scholar
Buertey, J. I. T., Miezah, A. K., & Adjei-Kumi, T. (2013, August). Delays to large construction projects in Ghana: A risk overview. In Proceedings: 5th West Africa Built Environment Research (WABER) Conference. Accra, Ghana: WABER Conference, (pp. 367–380).BuerteyJ. I. T.MiezahA. K.Adjei-KumiT. (2013, August). Delays to large construction projects in Ghana: A risk overview. In Proceedings: 5th West Africa Built Environment Research (WABER) Conference. Accra, Ghana: WABER Conference, (pp. 367–380).Search in Google Scholar
Chen, Z. J., Hsieh, T. S., & Mousavi Davoudi, S. M. (2022). Analysis of factors affecting the success of sustainable development projects with the help of machine learning tools. Discrete Dynamics in Nature and Society, 2022, pp. 1–9.ChenZ. J.HsiehT. S.Mousavi DavoudiS. M. (2022). Analysis of factors affecting the success of sustainable development projects with the help of machine learning tools. Discrete Dynamics in Nature and Society, 2022, pp. 1–9.Search in Google Scholar
Cheng, M. Y., & Darsa, M. H. (2021). Construction schedule risk assessment and management strategy for foreign general contractors working in the Ethiopian construction industry. Sustainability, 13(14), p. 7830.ChengM. Y.DarsaM. H. (2021). Construction schedule risk assessment and management strategy for foreign general contractors working in the Ethiopian construction industry. Sustainability, 13(14), p. 7830.Search in Google Scholar
Choudhry, R. M., Aslam, M. A., Hinze, J. W., & Arain, F. M. (2014). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7), p. 04014020.ChoudhryR. M.AslamM. A.HinzeJ. W.ArainF. M. (2014). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7), p. 04014020.Search in Google Scholar
Do, S. T., Nguyen, V. T., Tran, C. N., & Aung, Z. M. (2023). Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999–2011.DoS. T.NguyenV. T.TranC. N.AungZ. M. (2023). Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999–2011.Search in Google Scholar
Egwim, C. N., Alaka, H., Toriola-Coker, L. O., Balogun, H., & Sunmola, F. (2021). Applied artificial intelligence for predicting construction projects delay. Machine Learning with Applications, 6, p. 100166.EgwimC. N.AlakaH.Toriola-CokerL. O.BalogunH.SunmolaF. (2021). Applied artificial intelligence for predicting construction projects delay. Machine Learning with Applications, 6, p. 100166.Search in Google Scholar
Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), pp. 1–9.FashinaA. A.OmarM. A.SheikhA. A.FakunleF. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), pp. 1–9.Search in Google Scholar
Gardezi, S. S. S., Manarvi, I. A., & Gardezi, S. J. S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77, pp. 196–204.GardeziS. S. S.ManarviI. A.GardeziS. J. S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77, pp. 196–204.Search in Google Scholar
Hossen, M. M., Kang, S., & Kim, J. (2015). Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project. Nuclear Engineering and Technology, 47(3), pp. 362–379.HossenM. M.KangS.KimJ. (2015). Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project. Nuclear Engineering and Technology, 47(3), pp. 362–379.Search in Google Scholar
Hung, M. S., & Wang, J. (2016). Research on delay risks of EPC hydropower construction projects in Vietnam. Journal of Power and Energy Engineering, 4(4), pp. 9–16.HungM. S.WangJ. (2016). Research on delay risks of EPC hydropower construction projects in Vietnam. Journal of Power and Energy Engineering, 4(4), pp. 9–16.Search in Google Scholar
Ivanović, M. Z., Nedeljković, Đ., Stojadinović, Z., Marinković, D., Ivanišević, N., & Simić, N. (2022). Detection and in-depth analysis of causes of delay in construction projects: Synergy between machine learning and expert knowledge. Sustainability, 14(22), p. 14927.IvanovićM. Z.NedeljkovićĐ.StojadinovićZ.MarinkovićD.IvaniševićN.SimićN. (2022). Detection and in-depth analysis of causes of delay in construction projects: Synergy between machine learning and expert knowledge. Sustainability, 14(22), p. 14927.Search in Google Scholar
Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165–194.JarkasA. M.HauptT. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165–194.Search in Google Scholar
Jarkas, A. M., & Younes, J. H. (2014). Principle factors contributing to construction delays in the State of Qatar. International Journal of Construction Project Management, 6(1), p. 39.JarkasA. M.YounesJ. H. (2014). Principle factors contributing to construction delays in the State of Qatar. International Journal of Construction Project Management, 6(1), p. 39.Search in Google Scholar
Kassem, M., Khoiry, M. A., & Hamzah, N. (2020). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14(3), pp. 527–546.KassemM.KhoiryM. A.HamzahN. (2020). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14 (3), pp. 527–546.Search in Google Scholar
Kesavan, M., Gobidan, N. N., & Dissanayake, P. B. G. (2015). Analysis of factors contributing civil engineering project delays in Sri Lanka. In 6th International Conference on Structural Engineering and Construction Management 2015, pp. 40–46.KesavanM.GobidanN. N.DissanayakeP. B. G. (2015). Analysis of factors contributing civil engineering project delays in Sri Lanka. In 6th International Conference on Structural Engineering and Construction Management 2015, pp. 40–46.Search in Google Scholar
Mahamid, I. (2016). Factors contributing to poor performance in construction projects: Studies of Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12(1), pp. 27–38.MahamidI. (2016). Factors contributing to poor performance in construction projects: Studies of Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12 (1), pp. 27–38.Search in Google Scholar
Melaku Belay, S., Tilahun, S., Yehualaw, M., Matos, J., Sousa, H., & Workneh, E. T. (2021). Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: Case studies in Ethiopia. Advances in Civil Engineering, 2021, pp. 1–15.Melaku BelayS.TilahunS.YehualawM.MatosJ.SousaH.WorknehE. T. (2021). Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: Case studies in Ethiopia. Advances in Civil Engineering, 2021, pp. 1–15.Search in Google Scholar
Mpofu, B., Ochieng, E. G., Moobela, C., & Pretorius, A. (2017). Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), pp. 346–376.MpofuB.OchiengE. G.MoobelaC.PretoriusA. (2017). Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24 (2), pp. 346–376.Search in Google Scholar
Prateepasen, A., & Aumpiem, A. (2021). Problems causing delays and risk factors in welding construction projects of Thailand. Engineering Journal, 25(5), pp. 33–44.PrateepasenA.AumpiemA. (2021). Problems causing delays and risk factors in welding construction projects of Thailand. Engineering Journal, 25(5), pp. 33–44.Search in Google Scholar
Rauzana, A., & Dharma, W. (2022). Causes of delays in construction projects in the Province of Aceh, Indonesia. PLoS One, 17(1), e0263337.RauzanaA.DharmaW. (2022). Causes of delays in construction projects in the Province of Aceh, Indonesia. PLoS One, 17(1), e0263337.Search in Google Scholar
Salem, Z. T. A., & Suleiman, A. (2020). Risk factors causing time delay in the Jordanian construction sector. International Journal of Engineering Research and Technology, 13(2), pp. 307–315.SalemZ. T. A.SuleimanA. (2020). Risk factors causing time delay in the Jordanian construction sector. International Journal of Engineering Research and Technology, 13 (2), pp. 307–315.Search in Google Scholar
Shoar, S., Chileshe, N., & Edwards, J. D. (2022). Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression. Journal of Building Engineering, 50, p. 104102.ShoarS.ChilesheN.EdwardsJ. D. (2022). Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression. Journal of Building Engineering, 50, p. 104102.Search in Google Scholar
Uddin, S., Ong, S., & Lu, H. (2022). Machine learning in project analytics: A data-driven framework and case study. Scientific Reports, 12(1), pp. 15252.UddinS.OngS.LuH. (2022). Machine learning in project analytics: A data-driven framework and case study. Scientific Reports, 12(1), pp. 15252.Search in Google Scholar
Van, T. N., & Quoc, T. N. (2021). Research trends on machine learning in construction management: A scientometric analysis. Journal of Applied Science and Technology Trends, 2(03), pp. 96–104.VanT. N.QuocT. N. (2021). Research trends on machine learning in construction management: A scientometric analysis. Journal of Applied Science and Technology Trends, 2 (03), pp. 96–104.Search in Google Scholar
Wuni, I. Y., Shen, G. Q., & Mahmud, A. T. (2022). Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133–147.WuniI. Y.ShenG. Q.MahmudA. T. (2022). Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133–147.Search in Google Scholar
Yu, B., Guo, Z., Asian, S., Wang, H., & Chen, G. (2019). Flight delay prediction for commercial air transport: A deep learning approach. Transportation Research Part E: Logistics and Transportation Review, 125, pp. 203–221.YuB.GuoZ.AsianS.WangH.ChenG. (2019). Flight delay prediction for commercial air transport: A deep learning approach. Transportation Research Part E: Logistics and Transportation Review, 125, pp. 203–221.Search in Google Scholar
Zafar, I., Yousaf, T., & Ahmed, D. S. (2016). Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan–a case study. KSCE Journal of Civil Engineering, 20, pp. 1613–1620.ZafarI.YousafT.AhmedD. S. (2016). Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan–a case study. KSCE Journal of Civil Engineering, 20, pp. 1613–1620.Search in Google Scholar
Zhao, Y., Chen, W., Arashpour, M., Yang, Z., Shao, C., & Li, C. (2022b). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753–1776.ZhaoY.ChenW.ArashpourM.YangZ.ShaoC.LiC. (2022b). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29 (4), pp. 1753–1776.Search in Google Scholar
Zhao, Y., Chen, W., Yang, Z., Li, Z., & Wang, Y. (2022a). Analysis on risk factors related delay in PCPs. Engineering, Construction and Architectural Management, 30(10), pp. 4609–4644.ZhaoY.ChenW.YangZ.LiZ.WangY. (2022a). Analysis on risk factors related delay in PCPs. Engineering, Construction and Architectural Management, 30(10), pp. 4609–4644.Search in Google Scholar