This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Abdellatif, M. A., & Othman, A. A. E. (2006). Improving the sustainability of low-income housing projects: The case of residential buildings in Musaffah Commercial City in Abu Dhabi. Emirates Journal for Engineering Research, 11(2), pp. 47–58.AbdellatifM. A.OthmanA. A. E.2006Improving the sustainability of low-income housing projects: The case of residential buildings in Musaffah Commercial City in Abu Dhabi1124758Search in Google Scholar
Addis, B., & Talbot, R. (2001). Sustainable construction procurement: A guide to delivering environmentally responsible projects. CIRIA C571, London, CIRIA.AddisB.TalbotR.2001CIRIA C571,LondonCIRIASearch in Google Scholar
Aeck, R. C., & Ruby, D. I. (2006). “Consider constructability”, modern steel construction. [Online]. Available at https://www.rubyandassociates.com/user_area/content_media/raw/2006v04_consider_constructability_m(1)m.pdf [accessed 23 November, 2019].AeckR. C.RubyD. I.2006Available at https://www.rubyandassociates.com/user_area/content_media/raw/2006v04_consider_constructability_m(1)m.pdf [accessed 23 November, 2019].Search in Google Scholar
Akadiri, P. O., Chinyio, E. A., & Olomolaiye, P. O. (2012). Design of a sustainable building: A conceptual framework for implementing sustainability in the building sector. Buildings, 2, pp. 126–152.AkadiriP. O.ChinyioE. A.OlomolaiyeP. O.2012Design of a sustainable building: A conceptual framework for implementing sustainability in the building sector212615210.3390/buildings2020126Search in Google Scholar
AlNassar, N., Othman, A. A. E., & Elsaay, H. (2018). Investigating the architect’s role towards enhancing the sustainability of the construction supply chain in developing countries. In: Proceedings of the Green Heritage: Chance – Change – Challenge, the British University In Egypt, Cairo, 6–8 March 2018, pp. 82–114, ISBN:978-977-490-500-1.AlNassarN.OthmanA. A. E.ElsaayH.2018In:Proceedings of the Green Heritage: Chance – Change – Challengethe British University In Egypt, Cairo6–8 March 201882114ISBN:978-977-490-500-1.Search in Google Scholar
Al-Werikat, G. (2017). Supply chain management in construction. International Journal of Scientific & Technology Research, 6(3), pp. 106–110.Al-WerikatG.2017Supply chain management in construction63106110Search in Google Scholar
Anink, D., Boodtra, C., & Mark, J. (1996). Handbook of sustainable development. James and James, London.AninkD.BoodtraC.MarkJ.1996James and JamesLondonSearch in Google Scholar
Arbulu, R. J., & Tommelein, I. D. (2002). Alternative supply-chain configurations for engineered or catalogued made-to-order components: case study on pipe supports used in power plants. Proceedings IGLC-10, Aug. 2002, Gramado, Brazil.ArbuluR. J.TommeleinI. D.2002Proceedings IGLC-10Aug. 2002Gramado, BrazilSearch in Google Scholar
Aring, M. (2012). Skills gaps throughout the world: An analysis for UNESCO. Global Monitoring, Report 2012. Available at http://unesdoc.unesco.org/images/0021/002178/217874e.pdf [accessed 15 September, 2018].AringM.2012Available at http://unesdoc.unesco.org/images/0021/002178/217874e.pdf [accessed 15 September, 2018].Search in Google Scholar
Azhar, N., Kang, Y., & Ahmad, I. U. (2014). Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective. Procedia Engineering, 77, pp. 213–221.AzharN.KangY.AhmadI. U.2014Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective7721322110.1016/j.proeng.2014.07.019Search in Google Scholar
Baker, T. L. (1994). Doing Social Research, 2nd edn. McGraw-Hill, New York, NY.BakerT. L.19942nd edn.McGraw-HillNew York, NYSearch in Google Scholar
Baloyi, L., & Bekker, M. (2011). Causes of construction cost and time overruns: The 2010 FIFA world cup stadia in South Africa. Acta Structilia, 18(1), pp. 51–67.BaloyiL.BekkerM.2011Causes of construction cost and time overruns: The 2010 FIFA world cup stadia in South Africa1815167Search in Google Scholar
Barrett, P. S., & Stanley, C. (1999). Better Construction Briefing. Blackwell Science Ltd, Oxford.BarrettP. S.StanleyC.1999Blackwell Science LtdOxfordSearch in Google Scholar
Bassioni, H. A., Sarhan, A., & Zaki, A. S. (2013). Cost overrun causes related to the design phase in the Egyptian construction industry. Journal of Engineering Management Research, 1(5), pp. 138–147.BassioniH. A.SarhanA.ZakiA. S.2013Cost overrun causes related to the design phase in the Egyptian construction industry15138147Search in Google Scholar
Bernard, H. R. (2000). Social Research Methods: Qualitative and Quantitative Approaches. Sage Publishing Ltd, London.BernardH. R.2000Sage Publishing LtdLondonSearch in Google Scholar
Bowen, P. A., Pearl, R. G., & Edwards, P. J. (1999). Client briefing process and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91–104.BowenP. A.PearlR. G.EdwardsP. J.1999Client briefing process and procurement method selection: A South African study629110410.1108/eb021102Search in Google Scholar
Boyko, C. T., Cooper, R., Davey, C. L., & Wootton, A. B. (2006). Addressing sustainability early in the urban design process. International Journal of Management of Environmental Quality, 17(6), pp. 689–706.BoykoC. T.CooperR.DaveyC. L.WoottonA. B.2006Addressing sustainability early in the urban design process17668970610.1108/14777830610702520Search in Google Scholar
Broft, R., Badi, S., and Pryke, S. (2016). Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187–204.BroftR.BadiS.PrykeS.2016Towards supply chain maturity in construction6218720410.1108/BEPAM-09-2014-0050Search in Google Scholar
Building Research Establishment. (1981). Quality Control on Building Sites. Garston London, UK.Building Research Establishment1981Garston LondonUKSearch in Google Scholar
Caniato, F., & Größler, A. (2015). The moderating effect of product complexity on new product development and supply chain management integration. Production Planning & Control, 26(16), pp. 1306–1317.CaniatoF.GrößlerA.2015The moderating effect of product complexity on new product development and supply chain management integration26161306131710.1080/09537287.2015.1027318Search in Google Scholar
Chavhan, R. (2012). Supplier development: Theories and practices. IOSR Journal of Mechanical and Civil Engineering, 3(3), pp. 37–51.ChavhanR.2012Supplier development: Theories and practices33375110.9790/1684-0333751Search in Google Scholar
Chen, J. J., & Chambers, D. (1999). Sustainability and the impact of Chinese policy initiates upon construction. Construction Management and Economics, 17(5), pp. 679–687.ChenJ. J.ChambersD.1999Sustainability and the impact of Chinese policy initiates upon construction17567968710.1080/014461999371286Search in Google Scholar
Chileshe, N. (2011). Delivering sustainability through construction and project management: practices, tools and practices. In: Roetman, P. E. J., & Daniels, C. B. (eds.), Creating Sustainable Communities in a Changing World, 1st edn. Chapter: 13. Crawford House Publishing, South Australia, pp. 111–118.ChilesheN.2011In:RoetmanP. E. J.DanielsC. B.(eds.),1st edn.Chapter: 13.Crawford House PublishingSouth Australia111118Search in Google Scholar
Chin, T. A., Tat, H. H., & Sulaiman, Z. (2015). Green supply chain management, environmental collaboration and sustainability performance. Procedia CIRP, 26(2015), pp. 695–699.ChinT. A.TatH. H.SulaimanZ.2015Green supply chain management, environmental collaboration and sustainability performance26201569569910.1016/j.procir.2014.07.035Search in Google Scholar
Ching, F. D. K., and Winkel, S. R. (2016). Building Codes Illustrated: A Guide to Understanding the 2015 International Building Code, 5th edn. John Wiley & Sons, Hoboken, New Jersey, ISBN: 978-1-119-15092-3.ChingF. D. K.WinkelS. R.20165th edn.John Wiley & SonsHoboken, New JerseyISBN: 978-1-119-15092-3.Search in Google Scholar
Chopra, S., & Meindl, P. (2013). Supply Chain Management - Strategy, Planning and Operation. Prentice Hall-Pearson, New York, USA.ChopraS.MeindlP.2013Prentice Hall-PearsonNew York, USASearch in Google Scholar
Christopher, M. (1998). Logistics and Supply Chain Management: Strategies for Reducing Cost and Improving Service. Financial Times Pitman Publishing, London.ChristopherM.1998Financial Times Pitman PublishingLondon10.1080/13675569908901575Search in Google Scholar
CIB. (1996). Towards a 30 per cent Productivity Improvement in Construction, (Working Group 11). Construction Industry Board, Tomas Telford, London.CIB1996Construction Industry BoardTomas Telford, LondonSearch in Google Scholar
CIC. (1994). Dispute Resolution, a Report by the Dispute Resolution Task Force of the Construction Industry Council Which Identifies the Disputes That Arise in the Construction Industry and Existing Methods of Their Resolution. Construction Industry Council, London.CIC1994Construction Industry CouncilLondonSearch in Google Scholar
Cox, A., & Townsend, M. (1998). Strategic Procurement in Construction. Thomas Telford Publishing. ISBN-10: 0727725998.CoxA.TownsendM.1998Thomas Telford PublishingISBN-10: 0727725998.10.1680/spic.25998Search in Google Scholar
Craig, N., & Sommerville, J. (2006). Information management systems on construction projects case study. Records Management Journal, 16(3), pp. 131–148.CraigN.SommervilleJ.2006Information management systems on construction projects case study16313114810.1108/09565690610713192Search in Google Scholar
Czaja, R., & Blair, J. (1996). Designing Surveys: A Guide to Decisions and Procedures. Pine Forge Press, London.CzajaR.BlairJ.1996Pine Forge PressLondonSearch in Google Scholar
De Vaus, D. A. (1990). Survey in Social Research, 2nd ed. Unwin-Hyman, London.De VausD. A.19902nd ed.Unwin-HymanLondonSearch in Google Scholar
EDMS. (2007). Framework. Engineering Data Management Service. [Online]. Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework. [Accessed 2 August, 2019].EDMS2007Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework. [Accessed 2 August, 2019].Search in Google Scholar
Edum-Fotwe, F. T., Thorpe, A., & McCaffer, R. (1999). Organisational relationships within the construction supply-chain. Proceedings of a Joint CIB Triennial Symposium. Cape Town: Sloan Management Review, 33(3), pp. 65–73.Edum-FotweF. T.ThorpeA.McCafferR.1999Organisational relationships within the construction supply-chainCape TownSloan Management Review3336573Search in Google Scholar
EES. (2018). Egyptian Engineers Syndicate. [Online]. Available at http://eea.org.eg/ [accessed 12 October, 2018].EES2018Available at http://eea.org.eg/ [accessed 12 October, 2018].Search in Google Scholar
Elfving, J. A., Tommelein, I. D., & Ballard G. (2005). Consequences of competitive bidding in project-based production. Journal of Purchasing and Supply Management, 11(4), pp. 173–181.ElfvingJ. A.TommeleinI. D.BallardG.2005Consequences of competitive bidding in project-based production11417318110.1016/j.pursup.2005.12.001Search in Google Scholar
Essam, M., & Ehab, M. (2015). Construction Supply Chain, Inter-Sectoral Linkagesand Contribution To Economic Growth: the case study Egypt. The Egyptian Center For Economic study, Working Paper No. 184. [Online]. Available at http://www.eces.org.eg/MediaFiles/Uploaded_Files/5c2eab3f.pdf [accessed 8 September, 2019].EssamM.EhabM.2015Construction Supply Chain, Inter-Sectoral Linkagesand Contribution To Economic Growth: the case study EgyptWorking Paper No. 184. [Online]. Available at http://www.eces.org.eg/MediaFiles/Uploaded_Files/5c2eab3f.pdf [accessed 8 September, 2019].Search in Google Scholar
Field, B., & Ofori, G. (1988). Construction and economic development – a case study. Third World Planning Review, 10(1), pp. 41–50.FieldB.OforiG.1988Construction and economic development – a case study101415010.3828/twpr.10.1.63h4v2427v96132qSearch in Google Scholar
FluidSurveys Team. (2014). Calculating the Right Survey Sample Size. [Online]. Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/ [accessed 2 April, 2018].FluidSurveys Team2014Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/ [accessed 2 April, 2018].Search in Google Scholar
Friends of the Earth. (1995). Prescription for Change: Health and the Environment. Friend of the Earth, Brussels.Friends of the Earth1995Friend of the EarthBrusselsSearch in Google Scholar
Goral, J. (2007). Risk management in the conceptual design phase of building projects. Master’s thesis in the International Master’s Programme Structural Engineering 2007, Chalmers University of Technology, Göteborg.GoralJ.2007Master’s thesis in the International Master’s Programme Structural Engineering 2007,Chalmers University of TechnologyGöteborgSearch in Google Scholar
Greenwood, D. J. (2004). The North Tyneside Partnering Agreement: a study of Strategic Partnering in the Public Sector. Research Report carried out for the Department of Trade and Industry by Northumbria University.GreenwoodD. J.2004Research Report carried out for the
Department of Trade and Industry by Northumbria University.Search in Google Scholar
Guo, L., Li, H., & Zhang, C. (2016). Transaction costs in construction projects under uncertainty. Kybernetes, 45(6), pp. 866–883, 20.GuoL.LiH.ZhangC.2016Transaction costs in construction projects under uncertainty4568668832010.1108/K-10-2014-0206Search in Google Scholar
Hannagan, T. J. (1986). Mastering Statistics, 2nd edn. Macmillan Education Ltd, London.HannaganT. J.19862nd edn.Macmillan Education LtdLondonSearch in Google Scholar
ICE. (1996a). Design and Practice Guide: Creating Value in Engineering. The Institute of Civil Engineers, Thomas Telford, London.ICE1996aThe Institute of Civil EngineersThomas Telford, LondonSearch in Google Scholar
ICE. (1996b). Civil Engineering Procedure, 5th edn. The Institute of Civil Engineers, Thomas Telford, London.ICE1996b5th edn.The Institute of Civil Engineers, Thomas TelfordLondonSearch in Google Scholar
Karlsson, I. (2009). Social and Economic Aspects of Sustainable Development. Uppsala University, Sweden: The Baltic University Programme, Uppsala Centre for Sustainable Development.KarlssonI.2009Uppsala UniversitySwedenThe Baltic University Programme, Uppsala Centre for Sustainable Development.Search in Google Scholar
Katunzi, T. M. (2011). Obstacles to process integration along the supply chain: Manufacturing firms perspective international. Journal of Business and Management, 6(5), 105–113.KatunziT. M.2011Obstacles to process integration along the supply chain: Manufacturing firms perspective international6510511310.5539/ijbm.v6n5p105Search in Google Scholar
Khan, R. A. (2008). Role of construction sector in economic growth: Empirical evidence from Pakistan economy. In: Proceedings of the First International Conference on Construction in Developing Countries (ICCIDC), Karachi, Pakistan, August 2008, pp. 279–290.KhanR. A.2008In:Proceedings of the First International Conference on Construction in Developing Countries (ICCIDC)Karachi, PakistanAugust 2008279290Search in Google Scholar
Khan, S. A. (2019). Global Perspectives on Green Business Administration and Sustainable Supply Chain Management. ISBN: 9781799821731, IGI Global Publisher USA.KhanS. A.2019ISBN: 9781799821731,IGI Global Publisher USASearch in Google Scholar
Kim, J. (1998). Sustainable Architecture Module: Introduction to Sustainable Design. National Pollution Prevention Centre for Higher Education, University Ave., Ann Arbor, MI 48109-1115.KimJ.1998National Pollution Prevention Centre for Higher Education, University Ave.Ann Arbor, MI 48109-1115Search in Google Scholar
Kubal, M. T. (1994). Engineering Quality in Construction. McGraw-Hill, New York, NY.KubalM. T.1994McGraw-HillNew York, NYSearch in Google Scholar
Lawson, B., Krause, D., & Potter, A. (2014). Improving supplier new product development performance: The role of supplier development. Journal of Product Innovation Management, 32(5), pp. 777–792.LawsonB.KrauseD.PotterA.2014Improving supplier new product development performance: The role of supplier development32577779210.1111/jpim.12231Search in Google Scholar
Love, P. E. D., & Edwards, D. J. (2004). Forensic project management: the underlying causes of rework in construction projects. Civil Environmental Engineering Systems, 12(3), pp. 207–228.LoveP. E. D.EdwardsD. J.2004Forensic project management: the underlying causes of rework in construction projects12320722810.1080/10286600412331295955Search in Google Scholar
Love, P. E. D., & Li, H. (2000). Quantifying the causes and costs of rework in construction. Construction Management Economics, 18(4), 479–490.LoveP. E. D.LiH.2000Quantifying the causes and costs of rework in construction18447949010.1080/01446190050024897Search in Google Scholar
Marquez, A. C. (2010). Dynamic modelling for supply chain management: dealing with front-end, back-end and integration issues. Springer, ISBN-13: 978-1848826809.MarquezA. C.2010SpringerISBN-13: 978-1848826809.10.1007/978-1-84882-681-6Search in Google Scholar
Marshall, R. D., Pfrang, E. O., Leyendecker, E. V., Woodward, K. A., Reed, R. P., Kasen, M. B., et al. (1982). Investigation of the Kansas City Hyatt Regency walkways collapse. Building Science Series. 143. U.S. Dept. of Commerce, National Bureau of Standards. Retrieved 17 February, 2018.MarshallR. D.PfrangE. O.LeyendeckerE. V.WoodwardK. A.ReedR. P.KasenM. B.1982Investigation of the Kansas City Hyatt Regency walkways collapseRetrieved 17 February, 2018.Search in Google Scholar
MaSC. (2002). Managing sustainable construction – Profiting from sustainability. Available at www.bre.co.uk [accessed 9 September 2019].MaSC2002Available at www.bre.co.uk [accessed 9 September 2019].Search in Google Scholar
Mentzer, J. T., Dewitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., et al. (2001). What is supply chain management? In: Mentzer, J. T. (ed.), Supply Chain Management. Sage Publications, Inc, California, Michigan, pp. 1–25.MentzerJ. T.DewittW.KeeblerJ. S.MinS.NixN. W.SmithC. D.2001What is supply chain management?In:MentzerJ. T.(ed.),Sage Publications, IncCalifornia, Michigan125Search in Google Scholar
Kometa, S. T., & Olomolaiye, P. O. (1997). Evaluation of factors influencing construction clients’ decision to build. Journal of Management in Engineering, 3(2), pp. 77–86.KometaS. T.OlomolaiyeP. O.1997Evaluation of factors influencing construction clients’ decision to build32778610.1061/(ASCE)0742-597X(1997)13:2(77)Search in Google Scholar
Northey, G. (2018). An Introduction to Early Supplier Involvement in the Construction Industry. Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry [Retrieved 20 November, 2019, from CRH Americas, Inc.].NortheyG.2018Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry [Retrieved 20 November, 2019, from CRH Americas, Inc.].Search in Google Scholar
Norton, B. R., & McElligott, W. C. (1995). Value Management in Construction: A Practical Guide. Macmillan, London.NortonB. R.McElligottW. C.1995MacmillanLondon10.1007/978-1-349-13350-5Search in Google Scholar
O’Brien, J. J. (1998). Construction Change Orders. McGraw-Hill, New York, NY.O’BrienJ. J.1998McGraw-HillNew York, NYSearch in Google Scholar
O’Brien, W. J., & Fischer, M. A. (1993). Construction supply-chain management: a research framework. In: Proceedings of CIVIL-COMP-’93, Information Technology for Civil and Structural Engineers, The Third International Conference on the Application of Artificial Intelligence to Civil and Structural Engineers, Edinburgh, Scotland, 17–19 August, pp. 61–64.O’BrienW. J.FischerM. A.1993In:Proceedings of CIVIL-COMP-’93, Information Technology for Civil and Structural Engineers, The Third International Conference on the Application of Artificial Intelligence to Civil and Structural EngineersEdinburgh, Scotland17–19 August6164Search in Google Scholar
O’Leary, A. (1992). Construction Administration in Architectural Practice, 1st ed., McGraw-Hill, New York, NY.O’LearyA.19921st ed.McGraw-HillNew York, NYSearch in Google Scholar
Olomolaiye, P. O., Price, A. D. F., & Wahab, K. A. (1987). Problems influencing craftsmen’s productivity in Nigeria build. Environment, 22(4), pp. 317–323.OlomolaiyeP. O.PriceA. D. F.WahabK. A.1987Problems influencing craftsmen’s productivity in Nigeria build224317323Search in Google Scholar
Othman, A. A. E. (2008). Building the effective architectural team in design firms: The case of the United Arab Emirates. Emirates Journal for Engineering Research, 13(1), pp. 1–11.OthmanA. A. E.2008Building the effective architectural team in design firms: The case of the United Arab Emirates131111Search in Google Scholar
Othman, A. A. E., & Abdelwahab, N. M. (2016). A field study investigating the role of integrating risk management into the architectural design process as an approach towards delivering sustainable construction projects. In: Proceedings of the 10th Built Environment Conference, Port Elizabeth, 31 July–2 August, pp. 261–272, ISBN number: 978-0-620-71904-9.OthmanA. A. E.AbdelwahabN. M.2016In:Proceedings of the 10th Built Environment ConferencePort Elizabeth31 July–2 August261272ISBN number: 978-0-620-71904-9.Search in Google Scholar
Othman, A. A. E., & El-Gendawy, A. H. S. (2010). Improving construction sustainability through integrating suppliers and manufacturers in the design process. In: Proceedings of the 2nd International Conference on Construction In Developing Countries (ICCDC–II) “Advancing and Integrating Construction Education, Research & Practice” 3–5 August 2010, Cairo, Egypt, pp. 119–134.OthmanA. A. E.El-GendawyA. H. S.2010In:Proceedings of the 2nd International Conference on Construction In Developing Countries (ICCDC–II) “Advancing and Integrating Construction Education, Research & Practice”3–5 August 2010Cairo, Egypt119134Search in Google Scholar
Othman, A. A. E., & Nadim, W. (2010). Towards establishing an international sustainability index for the construction industry: A literature review. In: Proceedings of the First International Conference on Sustainability and the Future, The British University, Cairo, 23–25 November, pp. 222–235.OthmanA. A. E.NadimW.2010In:Proceedings of the First International Conference on Sustainability and the FutureThe British University, Cairo23–25 November222235Search in Google Scholar
Othman, A. A. E., & Sokkar, D. A. (2019). Enhancing the performance of architectural design firms through addressing the gap of workforce skills in developing countries: A good-to-great approach. Organisation, Technology and Management in Construction: An International Journal, 11(1), pp. 1911–1924.OthmanA. A. E.SokkarD. A.2019Enhancing the performance of architectural design firms through addressing the gap of workforce skills in developing countries: A good-to-great approach1111911192410.2478/otmcj-2018-0016Search in Google Scholar
Othman, A. A. E., Ghaly, M., & ZainulAbidin, N. (2014). Lean principles: An innovative approach for achieving sustainability in the egyptian construction industry. Organisation, Technology and Management in Construction: An International Journal, 6(1), pp. 917–932.OthmanA. A. E.GhalyM.ZainulAbidinN.2014Lean principles: An innovative approach for achieving sustainability in the egyptian construction industry6191793210.5592/otmcj.2014.1.2Search in Google Scholar
Othman, A., & Harinarain, N. (2009). Managing risks associated with the JBCC(principal building agreement) from theSouth African contractor’s perspective. Acta Structilia, 16(1), pp. 83–119.OthmanA.HarinarainN.2009Managing risks associated with the JBCC(principal building agreement) from theSouth African contractor’s perspective16183119Search in Google Scholar
Parkin, S., Sommer, F., & Uren, S. (2003). Sustainable development: Understanding the concept and practical challenge. Proceedings of the Institution of Civil Engineers, Engineering Sustainability, 156(1), pp. 19–26.ParkinS.SommerF.UrenS.2003Sustainable development: Understanding the concept and practical challenge1561192610.1680/ensu.2003.156.1.19Search in Google Scholar
RIBA. (2013). RIBA Plan of Work 2013. Royal Institute of British Architects, London.RIBA2013Royal Institute of British ArchitectsLondonSearch in Google Scholar
Richardson, S. (2007). What Is a skill shortage? National Centre for Vocational Education Research, Adelaide, Australia. Available at https://www.ncver.edu.au/research-and-statistics/publications/all-publications/what-is-a-skill-shortage on [Accessed 15 September, 2018].RichardsonS.2007Available at https://www.ncver.edu.au/research-and-statistics/publications/all-publications/what-is-a-skill-shortage on [Accessed 15 September, 2018].Search in Google Scholar
Rodriguez, S., Roman, M., Sturhahn, S., & Terry, E. (2002). Sustainability assessment and reporting for the University of Michigan’s Ann Arbor Campus. Master’s Thesis. University of Michigan, Ann Arbor, pp. 1–396.RodriguezS.RomanM.SturhahnS.TerryE.2002Master’s Thesis.University of MichiganAnn Arbor1396Search in Google Scholar
Roodman, D. M., & Lenssen, N. A. (1995). Building revolution: How ecology health concerns are transforming construction. Paper 124. World Watch Institute, Washington, DC.RoodmanD. M.LenssenN. A.1995World Watch InstituteWashington, DCSearch in Google Scholar
Sarkis, J. (2014). Green Supply Chain Management. Momentum Press, New York City.SarkisJ.2014Momentum PressNew York City10.1115/1.860281Search in Google Scholar
Segerstedt, A., & Olofsson, T. (2010). Supply chains in the construction industry. Supply Chain Management, 15(5), pp. 347–353.SegerstedtA.OlofssonT.2010Supply chains in the construction industry15534735310.1108/13598541011068260Search in Google Scholar
Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), pp. 111–118.ShashA. A.1993Factors considered in tendering decisions by top UK contractors11211111810.1080/01446199300000004Search in Google Scholar
Simangunsong, E., Hendry, L. C., & Stevens, M. (2016). Managing supply chain uncertainty with emerging ethical issues. International Journal of Operations & Production Management, 36(10), pp. 1272–1307.SimangunsongE.HendryL. C.StevensM.2016Managing supply chain uncertainty with emerging ethical issues36101272130710.1108/IJOPM-12-2014-0599Search in Google Scholar
Sisco, C., Chorn, B., & Pruzan, P. M. (2010). Supply Chain Sustainability A Practical Guide. UN Global Compact and Business for Social Responsibility, p. 68.SiscoC.ChornB.PruzanP. M.2010Supply Chain Sustainability A Practical Guide68Search in Google Scholar
Smith, J., & Wyatt, R. (1998). Criteria for strategic decision making at the pre-briefing stage. In: Hughes, W. (ed.), Association of Research in Construction Management (ARCOM), Proceedings of the 14th Annual. Conference, 9–11 September, Reading University, UK, pp. 300–309.SmithJ.WyattR.1998In:HughesW.(ed.),Association of Research in Construction Management (ARCOM), Proceedings of the 14th Annual. Conference9–11 SeptemberReading University, UK300309Search in Google Scholar
Subramani, T., Sruthi, P. S., & Kavitha, M. (2014). Causes of cost overrun in construction. IOSR Journal of Engineering, 4(6), pp. 1–7.SubramaniT.SruthiP. S.KavithaM.2014Causes of cost overrun in construction461710.9790/3021-04640107Search in Google Scholar
The National Economic Development Office. (1987). Achieving Quality on Building Sites. National Economic Development Office, London, pp. 18–19.The National Economic Development Office1987National Economic Development OfficeLondon1819Search in Google Scholar
Thunberg, M., Rudberg, M., & Gustavsson, T. K. (2017). Categorising on-site problems: A supply chain management perspective. Construction Innovation, 17(1), pp. 90–111.ThunbergM.RudbergM.GustavssonT. K.2017Categorising on-site problems: A supply chain management perspective1719011110.1108/CI-10-2015-0059Search in Google Scholar
USEPA. (2009). Basic Information. The United States Environmental Protection Agency (USEPA). [Online]. Available at http://www.epa.gov/sustainability/basicinfo.htm [accessed 29 August, 2019].USEPA2009[Online]. Available at http://www.epa.gov/sustainability/basicinfo.htm [accessed 29 August, 2019].Search in Google Scholar
Valdés-Rodríguez, O. A., & Pérez-Vázque, A. (2011). Sustainable livelihoods: An analysis of the methodology [Modos De Vida Sustentable: Un Análisis De Las Metodologías]. Tropical and Subtropical Agroecosystems, 14(2011), pp. 91–99.Valdés-RodríguezO. A.Pérez-VázqueA.2011Sustainable livelihoods: An analysis of the methodology [Modos De Vida Sustentable: Un Análisis De Las Metodologías]1420119199Search in Google Scholar
Veenendaal, J. (1998). Analysing the impact of change orders on a schedule. Cost Engineering, 40(9), pp. 33–39.VeenendaalJ.1998Analysing the impact of change orders on a schedule4093339Search in Google Scholar
Vrijhoef, R. (1998). Co-makership in construction: Towards construction supply chain management. MSc thesis, Delft University of Technology, Delft.VrijhoefR.1998MSc thesis,Delft University of TechnologyDelftSearch in Google Scholar
Vrijhoef, R., & Koskela, L. (2000). The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management, 6(2000), pp. 169–178.VrijhoefR.KoskelaL.2000The four roles of supply chain management in construction6200016917810.1016/S0969-7012(00)00013-7Search in Google Scholar
Wantanakorn, D., Mawdesley, M. J., & Askew, W. H. (1999). Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112–120.WantanakornD.MawdesleyM. J.AskewW. H.1999Management errors in construction6211212010.1108/eb021104Search in Google Scholar
Whyte, A., & Scott, D. (2010). Life-cycle costing analysis to assist design decisions: Beyond 3D building information modelling. In: Proceedings of the International Conference on Computing in Civil and Building Engineering, University of Nottingham.WhyteA.ScottD.2010In:Proceedings of the International Conference on Computing in Civil and Building EngineeringUniversity of NottinghamSearch in Google Scholar
Willmott Dixon Group. (2015). Willmott Dixon Group. [Online]. Available at http://www.willmottdixon.co.uk/contact [Accessed 15 March, 2019].Willmott Dixon Group2015[Online]. Available at http://www.willmottdixon.co.uk/contact [Accessed 15 March, 2019].Search in Google Scholar
World Commission on Environment and Development. (1987). Our Common Future. Oxford University Press, Oxford.World Commission on Environment and Development1987Oxford University PressOxfordSearch in Google Scholar
WS Atkins Consultants. (2001), Sustainable Construction: Company Indicator, CIRIA C563, CIRIA, London.WS Atkins Consultants2001CIRIA C563, CIRIALondonSearch in Google Scholar
Xie, C., Wu, D., & Hu, X. (2010). A case study of multi-team communications in construction design. Supply Chain Management, 15(5), pp. 363–370.XieC.WuD.HuX.2010A case study of multi-team communications in construction design15536337010.1108/13598541011068279Search in Google Scholar