Accès libre

A framework for achieving sustainability by overcoming the challenges of the construction supply chain during the design process

À propos de cet article

Citez

Abdellatif, M. A., & Othman, A. A. E. (2006). Improving the sustainability of low-income housing projects: The case of residential buildings in Musaffah Commercial City in Abu Dhabi. Emirates Journal for Engineering Research, 11(2), pp. 47–58. AbdellatifM. A. OthmanA. A. E. 2006 Improving the sustainability of low-income housing projects: The case of residential buildings in Musaffah Commercial City in Abu Dhabi Emirates Journal for Engineering Research 11 2 47 58 Search in Google Scholar

Addis, B., & Talbot, R. (2001). Sustainable construction procurement: A guide to delivering environmentally responsible projects. CIRIA C571, London, CIRIA. AddisB. TalbotR. 2001 Sustainable construction procurement: A guide to delivering environmentally responsible projects CIRIA C571, London CIRIA Search in Google Scholar

Aeck, R. C., & Ruby, D. I. (2006). “Consider constructability”, modern steel construction. [Online]. Available at https://www.rubyandassociates.com/user_area/content_media/raw/2006v04_consider_constructability_m(1)m.pdf [accessed 23 November, 2019]. AeckR. C. RubyD. I. 2006 “Consider constructability”, modern steel construction. [Online] Available at https://www.rubyandassociates.com/user_area/content_media/raw/2006v04_consider_constructability_m(1)m.pdf [accessed 23 November, 2019]. Search in Google Scholar

Akadiri, P. O., Chinyio, E. A., & Olomolaiye, P. O. (2012). Design of a sustainable building: A conceptual framework for implementing sustainability in the building sector. Buildings, 2, pp. 126–152. AkadiriP. O. ChinyioE. A. OlomolaiyeP. O. 2012 Design of a sustainable building: A conceptual framework for implementing sustainability in the building sector Buildings 2 126 152 10.3390/buildings2020126 Search in Google Scholar

AlNassar, N., Othman, A. A. E., & Elsaay, H. (2018). Investigating the architect’s role towards enhancing the sustainability of the construction supply chain in developing countries. In: Proceedings of the Green Heritage: Chance – Change – Challenge, the British University In Egypt, Cairo, 6–8 March 2018, pp. 82–114, ISBN:978-977-490-500-1. AlNassarN. OthmanA. A. E. ElsaayH. 2018 Investigating the architect’s role towards enhancing the sustainability of the construction supply chain in developing countries In: Proceedings of the Green Heritage: Chance – Change – Challenge the British University In Egypt, Cairo 6–8 March 2018 82 114 ISBN:978-977-490-500-1. Search in Google Scholar

Al-Werikat, G. (2017). Supply chain management in construction. International Journal of Scientific & Technology Research, 6(3), pp. 106–110. Al-WerikatG. 2017 Supply chain management in construction International Journal of Scientific & Technology Research 6 3 106 110 Search in Google Scholar

Anink, D., Boodtra, C., & Mark, J. (1996). Handbook of sustainable development. James and James, London. AninkD. BoodtraC. MarkJ. 1996 Handbook of sustainable development James and James London Search in Google Scholar

Arbulu, R. J., & Tommelein, I. D. (2002). Alternative supply-chain configurations for engineered or catalogued made-to-order components: case study on pipe supports used in power plants. Proceedings IGLC-10, Aug. 2002, Gramado, Brazil. ArbuluR. J. TommeleinI. D. 2002 Alternative supply-chain configurations for engineered or catalogued made-to-order components: case study on pipe supports used in power plants Proceedings IGLC-10 Aug. 2002 Gramado, Brazil Search in Google Scholar

Aring, M. (2012). Skills gaps throughout the world: An analysis for UNESCO. Global Monitoring, Report 2012. Available at http://unesdoc.unesco.org/images/0021/002178/217874e.pdf [accessed 15 September, 2018]. AringM. 2012 Skills gaps throughout the world: An analysis for UNESCO. Global Monitoring, Report 2012 Available at http://unesdoc.unesco.org/images/0021/002178/217874e.pdf [accessed 15 September, 2018]. Search in Google Scholar

Azhar, N., Kang, Y., & Ahmad, I. U. (2014). Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective. Procedia Engineering, 77, pp. 213–221. AzharN. KangY. AhmadI. U. 2014 Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective Procedia Engineering 77 213 221 10.1016/j.proeng.2014.07.019 Search in Google Scholar

Baker, T. L. (1994). Doing Social Research, 2nd edn. McGraw-Hill, New York, NY. BakerT. L. 1994 Doing Social Research 2nd edn. McGraw-Hill New York, NY Search in Google Scholar

Baloyi, L., & Bekker, M. (2011). Causes of construction cost and time overruns: The 2010 FIFA world cup stadia in South Africa. Acta Structilia, 18(1), pp. 51–67. BaloyiL. BekkerM. 2011 Causes of construction cost and time overruns: The 2010 FIFA world cup stadia in South Africa Acta Structilia 18 1 51 67 Search in Google Scholar

Barrett, P. S., & Stanley, C. (1999). Better Construction Briefing. Blackwell Science Ltd, Oxford. BarrettP. S. StanleyC. 1999 Better Construction Briefing Blackwell Science Ltd Oxford Search in Google Scholar

Bassioni, H. A., Sarhan, A., & Zaki, A. S. (2013). Cost overrun causes related to the design phase in the Egyptian construction industry. Journal of Engineering Management Research, 1(5), pp. 138–147. BassioniH. A. SarhanA. ZakiA. S. 2013 Cost overrun causes related to the design phase in the Egyptian construction industry Journal of Engineering Management Research 1 5 138 147 Search in Google Scholar

Bernard, H. R. (2000). Social Research Methods: Qualitative and Quantitative Approaches. Sage Publishing Ltd, London. BernardH. R. 2000 Social Research Methods: Qualitative and Quantitative Approaches Sage Publishing Ltd London Search in Google Scholar

Bowen, P. A., Pearl, R. G., & Edwards, P. J. (1999). Client briefing process and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91–104. BowenP. A. PearlR. G. EdwardsP. J. 1999 Client briefing process and procurement method selection: A South African study Engineering, Construction and Architectural Management 6 2 91 104 10.1108/eb021102 Search in Google Scholar

Boyko, C. T., Cooper, R., Davey, C. L., & Wootton, A. B. (2006). Addressing sustainability early in the urban design process. International Journal of Management of Environmental Quality, 17(6), pp. 689–706. BoykoC. T. CooperR. DaveyC. L. WoottonA. B. 2006 Addressing sustainability early in the urban design process International Journal of Management of Environmental Quality 17 6 689 706 10.1108/14777830610702520 Search in Google Scholar

Broft, R., Badi, S., and Pryke, S. (2016). Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187–204. BroftR. BadiS. PrykeS. 2016 Towards supply chain maturity in construction Built Environment Project and Asset Management 6 2 187 204 10.1108/BEPAM-09-2014-0050 Search in Google Scholar

Building Research Establishment. (1981). Quality Control on Building Sites. Garston London, UK. Building Research Establishment 1981 Quality Control on Building Sites Garston London UK Search in Google Scholar

Caniato, F., & Größler, A. (2015). The moderating effect of product complexity on new product development and supply chain management integration. Production Planning & Control, 26(16), pp. 1306–1317. CaniatoF. GrößlerA. 2015 The moderating effect of product complexity on new product development and supply chain management integration Production Planning & Control 26 16 1306 1317 10.1080/09537287.2015.1027318 Search in Google Scholar

Chavhan, R. (2012). Supplier development: Theories and practices. IOSR Journal of Mechanical and Civil Engineering, 3(3), pp. 37–51. ChavhanR. 2012 Supplier development: Theories and practices IOSR Journal of Mechanical and Civil Engineering 3 3 37 51 10.9790/1684-0333751 Search in Google Scholar

Chen, J. J., & Chambers, D. (1999). Sustainability and the impact of Chinese policy initiates upon construction. Construction Management and Economics, 17(5), pp. 679–687. ChenJ. J. ChambersD. 1999 Sustainability and the impact of Chinese policy initiates upon construction Construction Management and Economics 17 5 679 687 10.1080/014461999371286 Search in Google Scholar

Chileshe, N. (2011). Delivering sustainability through construction and project management: practices, tools and practices. In: Roetman, P. E. J., & Daniels, C. B. (eds.), Creating Sustainable Communities in a Changing World, 1st edn. Chapter: 13. Crawford House Publishing, South Australia, pp. 111–118. ChilesheN. 2011 Delivering sustainability through construction and project management: practices, tools and practices In: RoetmanP. E. J. DanielsC. B. (eds.), Creating Sustainable Communities in a Changing World 1st edn. Chapter: 13. Crawford House Publishing South Australia 111 118 Search in Google Scholar

Chin, T. A., Tat, H. H., & Sulaiman, Z. (2015). Green supply chain management, environmental collaboration and sustainability performance. Procedia CIRP, 26(2015), pp. 695–699. ChinT. A. TatH. H. SulaimanZ. 2015 Green supply chain management, environmental collaboration and sustainability performance Procedia CIRP 26 2015 695 699 10.1016/j.procir.2014.07.035 Search in Google Scholar

Ching, F. D. K., and Winkel, S. R. (2016). Building Codes Illustrated: A Guide to Understanding the 2015 International Building Code, 5th edn. John Wiley & Sons, Hoboken, New Jersey, ISBN: 978-1-119-15092-3. ChingF. D. K. WinkelS. R. 2016 Building Codes Illustrated: A Guide to Understanding the 2015 International Building Code 5th edn. John Wiley & Sons Hoboken, New Jersey ISBN: 978-1-119-15092-3. Search in Google Scholar

Chopra, S., & Meindl, P. (2013). Supply Chain Management - Strategy, Planning and Operation. Prentice Hall-Pearson, New York, USA. ChopraS. MeindlP. 2013 Supply Chain Management - Strategy, Planning and Operation Prentice Hall-Pearson New York, USA Search in Google Scholar

Christopher, M. (1998). Logistics and Supply Chain Management: Strategies for Reducing Cost and Improving Service. Financial Times Pitman Publishing, London. ChristopherM. 1998 Logistics and Supply Chain Management: Strategies for Reducing Cost and Improving Service Financial Times Pitman Publishing London 10.1080/13675569908901575 Search in Google Scholar

CIB. (1996). Towards a 30 per cent Productivity Improvement in Construction, (Working Group 11). Construction Industry Board, Tomas Telford, London. CIB 1996 Towards a 30 per cent Productivity Improvement in Construction, (Working Group 11) Construction Industry Board Tomas Telford, London Search in Google Scholar

CIC. (1994). Dispute Resolution, a Report by the Dispute Resolution Task Force of the Construction Industry Council Which Identifies the Disputes That Arise in the Construction Industry and Existing Methods of Their Resolution. Construction Industry Council, London. CIC 1994 Dispute Resolution, a Report by the Dispute Resolution Task Force of the Construction Industry Council Which Identifies the Disputes That Arise in the Construction Industry and Existing Methods of Their Resolution Construction Industry Council London Search in Google Scholar

Cox, A., & Townsend, M. (1998). Strategic Procurement in Construction. Thomas Telford Publishing. ISBN-10: 0727725998. CoxA. TownsendM. 1998 Strategic Procurement in Construction Thomas Telford Publishing ISBN-10: 0727725998. 10.1680/spic.25998 Search in Google Scholar

Craig, N., & Sommerville, J. (2006). Information management systems on construction projects case study. Records Management Journal, 16(3), pp. 131–148. CraigN. SommervilleJ. 2006 Information management systems on construction projects case study Records Management Journal 16 3 131 148 10.1108/09565690610713192 Search in Google Scholar

Czaja, R., & Blair, J. (1996). Designing Surveys: A Guide to Decisions and Procedures. Pine Forge Press, London. CzajaR. BlairJ. 1996 Designing Surveys: A Guide to Decisions and Procedures Pine Forge Press London Search in Google Scholar

De Vaus, D. A. (1990). Survey in Social Research, 2nd ed. Unwin-Hyman, London. De VausD. A. 1990 Survey in Social Research 2nd ed. Unwin-Hyman London Search in Google Scholar

EDMS. (2007). Framework. Engineering Data Management Service. [Online]. Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework. [Accessed 2 August, 2019]. EDMS 2007 Framework. Engineering Data Management Service. [Online] Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework. [Accessed 2 August, 2019]. Search in Google Scholar

Edum-Fotwe, F. T., Thorpe, A., & McCaffer, R. (1999). Organisational relationships within the construction supply-chain. Proceedings of a Joint CIB Triennial Symposium. Cape Town: Sloan Management Review, 33(3), pp. 65–73. Edum-FotweF. T. ThorpeA. McCafferR. 1999 Organisational relationships within the construction supply-chain Proceedings of a Joint CIB Triennial Symposium Cape Town Sloan Management Review 33 3 65 73 Search in Google Scholar

EES. (2018). Egyptian Engineers Syndicate. [Online]. Available at http://eea.org.eg/ [accessed 12 October, 2018]. EES 2018 Egyptian Engineers Syndicate. [Online] Available at http://eea.org.eg/ [accessed 12 October, 2018]. Search in Google Scholar

Elfving, J. A., Tommelein, I. D., & Ballard G. (2005). Consequences of competitive bidding in project-based production. Journal of Purchasing and Supply Management, 11(4), pp. 173–181. ElfvingJ. A. TommeleinI. D. BallardG. 2005 Consequences of competitive bidding in project-based production Journal of Purchasing and Supply Management 11 4 173 181 10.1016/j.pursup.2005.12.001 Search in Google Scholar

Essam, M., & Ehab, M. (2015). Construction Supply Chain, Inter-Sectoral Linkagesand Contribution To Economic Growth: the case study Egypt. The Egyptian Center For Economic study, Working Paper No. 184. [Online]. Available at http://www.eces.org.eg/MediaFiles/Uploaded_Files/5c2eab3f.pdf [accessed 8 September, 2019]. EssamM. EhabM. 2015 Construction Supply Chain, Inter-Sectoral Linkagesand Contribution To Economic Growth: the case study Egypt The Egyptian Center For Economic study Working Paper No. 184. [Online]. Available at http://www.eces.org.eg/MediaFiles/Uploaded_Files/5c2eab3f.pdf [accessed 8 September, 2019]. Search in Google Scholar

Field, B., & Ofori, G. (1988). Construction and economic development – a case study. Third World Planning Review, 10(1), pp. 41–50. FieldB. OforiG. 1988 Construction and economic development – a case study Third World Planning Review 10 1 41 50 10.3828/twpr.10.1.63h4v2427v96132q Search in Google Scholar

FluidSurveys Team. (2014). Calculating the Right Survey Sample Size. [Online]. Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/ [accessed 2 April, 2018]. FluidSurveys Team 2014 Calculating the Right Survey Sample Size. [Online] Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/ [accessed 2 April, 2018]. Search in Google Scholar

Friends of the Earth. (1995). Prescription for Change: Health and the Environment. Friend of the Earth, Brussels. Friends of the Earth 1995 Prescription for Change: Health and the Environment Friend of the Earth Brussels Search in Google Scholar

Goral, J. (2007). Risk management in the conceptual design phase of building projects. Master’s thesis in the International Master’s Programme Structural Engineering 2007, Chalmers University of Technology, Göteborg. GoralJ. 2007 Risk management in the conceptual design phase of building projects Master’s thesis in the International Master’s Programme Structural Engineering 2007, Chalmers University of Technology Göteborg Search in Google Scholar

Greenwood, D. J. (2004). The North Tyneside Partnering Agreement: a study of Strategic Partnering in the Public Sector. Research Report carried out for the Department of Trade and Industry by Northumbria University. GreenwoodD. J. 2004 The North Tyneside Partnering Agreement: a study of Strategic Partnering in the Public Sector Research Report carried out for the Department of Trade and Industry by Northumbria University. Search in Google Scholar

Guo, L., Li, H., & Zhang, C. (2016). Transaction costs in construction projects under uncertainty. Kybernetes, 45(6), pp. 866–883, 20. GuoL. LiH. ZhangC. 2016 Transaction costs in construction projects under uncertainty Kybernetes 45 6 866 883 20 10.1108/K-10-2014-0206 Search in Google Scholar

Hannagan, T. J. (1986). Mastering Statistics, 2nd edn. Macmillan Education Ltd, London. HannaganT. J. 1986 Mastering Statistics 2nd edn. Macmillan Education Ltd London Search in Google Scholar

ICE. (1996a). Design and Practice Guide: Creating Value in Engineering. The Institute of Civil Engineers, Thomas Telford, London. ICE 1996a Design and Practice Guide: Creating Value in Engineering The Institute of Civil Engineers Thomas Telford, London Search in Google Scholar

ICE. (1996b). Civil Engineering Procedure, 5th edn. The Institute of Civil Engineers, Thomas Telford, London. ICE 1996b Civil Engineering Procedure 5th edn. The Institute of Civil Engineers, Thomas Telford London Search in Google Scholar

Karlsson, I. (2009). Social and Economic Aspects of Sustainable Development. Uppsala University, Sweden: The Baltic University Programme, Uppsala Centre for Sustainable Development. KarlssonI. 2009 Social and Economic Aspects of Sustainable Development Uppsala University Sweden The Baltic University Programme, Uppsala Centre for Sustainable Development. Search in Google Scholar

Katunzi, T. M. (2011). Obstacles to process integration along the supply chain: Manufacturing firms perspective international. Journal of Business and Management, 6(5), 105–113. KatunziT. M. 2011 Obstacles to process integration along the supply chain: Manufacturing firms perspective international Journal of Business and Management 6 5 105 113 10.5539/ijbm.v6n5p105 Search in Google Scholar

Khan, R. A. (2008). Role of construction sector in economic growth: Empirical evidence from Pakistan economy. In: Proceedings of the First International Conference on Construction in Developing Countries (ICCIDC), Karachi, Pakistan, August 2008, pp. 279–290. KhanR. A. 2008 Role of construction sector in economic growth: Empirical evidence from Pakistan economy In: Proceedings of the First International Conference on Construction in Developing Countries (ICCIDC) Karachi, Pakistan August 2008 279 290 Search in Google Scholar

Khan, S. A. (2019). Global Perspectives on Green Business Administration and Sustainable Supply Chain Management. ISBN: 9781799821731, IGI Global Publisher USA. KhanS. A. 2019 Global Perspectives on Green Business Administration and Sustainable Supply Chain Management ISBN: 9781799821731, IGI Global Publisher USA Search in Google Scholar

Kim, J. (1998). Sustainable Architecture Module: Introduction to Sustainable Design. National Pollution Prevention Centre for Higher Education, University Ave., Ann Arbor, MI 48109-1115. KimJ. 1998 Sustainable Architecture Module: Introduction to Sustainable Design National Pollution Prevention Centre for Higher Education, University Ave. Ann Arbor, MI 48109-1115 Search in Google Scholar

Kubal, M. T. (1994). Engineering Quality in Construction. McGraw-Hill, New York, NY. KubalM. T. 1994 Engineering Quality in Construction McGraw-Hill New York, NY Search in Google Scholar

Lawson, B., Krause, D., & Potter, A. (2014). Improving supplier new product development performance: The role of supplier development. Journal of Product Innovation Management, 32(5), pp. 777–792. LawsonB. KrauseD. PotterA. 2014 Improving supplier new product development performance: The role of supplier development Journal of Product Innovation Management 32 5 777 792 10.1111/jpim.12231 Search in Google Scholar

Love, P. E. D., & Edwards, D. J. (2004). Forensic project management: the underlying causes of rework in construction projects. Civil Environmental Engineering Systems, 12(3), pp. 207–228. LoveP. E. D. EdwardsD. J. 2004 Forensic project management: the underlying causes of rework in construction projects Civil Environmental Engineering Systems 12 3 207 228 10.1080/10286600412331295955 Search in Google Scholar

Love, P. E. D., & Li, H. (2000). Quantifying the causes and costs of rework in construction. Construction Management Economics, 18(4), 479–490. LoveP. E. D. LiH. 2000 Quantifying the causes and costs of rework in construction Construction Management Economics 18 4 479 490 10.1080/01446190050024897 Search in Google Scholar

Marquez, A. C. (2010). Dynamic modelling for supply chain management: dealing with front-end, back-end and integration issues. Springer, ISBN-13: 978-1848826809. MarquezA. C. 2010 Dynamic modelling for supply chain management: dealing with front-end, back-end and integration issues Springer ISBN-13: 978-1848826809. 10.1007/978-1-84882-681-6 Search in Google Scholar

Marshall, R. D., Pfrang, E. O., Leyendecker, E. V., Woodward, K. A., Reed, R. P., Kasen, M. B., et al. (1982). Investigation of the Kansas City Hyatt Regency walkways collapse. Building Science Series. 143. U.S. Dept. of Commerce, National Bureau of Standards. Retrieved 17 February, 2018. MarshallR. D. PfrangE. O. LeyendeckerE. V. WoodwardK. A. ReedR. P. KasenM. B. 1982 Investigation of the Kansas City Hyatt Regency walkways collapse Building Science Series. 143. U.S. Dept. of Commerce, National Bureau of Standards Retrieved 17 February, 2018. Search in Google Scholar

MaSC. (2002). Managing sustainable construction – Profiting from sustainability. Available at www.bre.co.uk [accessed 9 September 2019]. MaSC 2002 Managing sustainable construction – Profiting from sustainability Available at www.bre.co.uk [accessed 9 September 2019]. Search in Google Scholar

Mentzer, J. T., Dewitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., et al. (2001). What is supply chain management? In: Mentzer, J. T. (ed.), Supply Chain Management. Sage Publications, Inc, California, Michigan, pp. 1–25. MentzerJ. T. DewittW. KeeblerJ. S. MinS. NixN. W. SmithC. D. 2001 What is supply chain management? In: MentzerJ. T. (ed.), Supply Chain Management Sage Publications, Inc California, Michigan 1 25 Search in Google Scholar

Kometa, S. T., & Olomolaiye, P. O. (1997). Evaluation of factors influencing construction clients’ decision to build. Journal of Management in Engineering, 3(2), pp. 77–86. KometaS. T. OlomolaiyeP. O. 1997 Evaluation of factors influencing construction clients’ decision to build Journal of Management in Engineering 3 2 77 86 10.1061/(ASCE)0742-597X(1997)13:2(77) Search in Google Scholar

Northey, G. (2018). An Introduction to Early Supplier Involvement in the Construction Industry. Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry [Retrieved 20 November, 2019, from CRH Americas, Inc.]. NortheyG. 2018 An Introduction to Early Supplier Involvement in the Construction Industry Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry [Retrieved 20 November, 2019, from CRH Americas, Inc.]. Search in Google Scholar

Norton, B. R., & McElligott, W. C. (1995). Value Management in Construction: A Practical Guide. Macmillan, London. NortonB. R. McElligottW. C. 1995 Value Management in Construction: A Practical Guide Macmillan London 10.1007/978-1-349-13350-5 Search in Google Scholar

O’Brien, J. J. (1998). Construction Change Orders. McGraw-Hill, New York, NY. O’BrienJ. J. 1998 Construction Change Orders McGraw-Hill New York, NY Search in Google Scholar

O’Brien, W. J., & Fischer, M. A. (1993). Construction supply-chain management: a research framework. In: Proceedings of CIVIL-COMP-’93, Information Technology for Civil and Structural Engineers, The Third International Conference on the Application of Artificial Intelligence to Civil and Structural Engineers, Edinburgh, Scotland, 17–19 August, pp. 61–64. O’BrienW. J. FischerM. A. 1993 Construction supply-chain management: a research framework In: Proceedings of CIVIL-COMP-’93, Information Technology for Civil and Structural Engineers, The Third International Conference on the Application of Artificial Intelligence to Civil and Structural Engineers Edinburgh, Scotland 17–19 August 61 64 Search in Google Scholar

O’Leary, A. (1992). Construction Administration in Architectural Practice, 1st ed., McGraw-Hill, New York, NY. O’LearyA. 1992 Construction Administration in Architectural Practice 1st ed. McGraw-Hill New York, NY Search in Google Scholar

Olomolaiye, P. O., Price, A. D. F., & Wahab, K. A. (1987). Problems influencing craftsmen’s productivity in Nigeria build. Environment, 22(4), pp. 317–323. OlomolaiyeP. O. PriceA. D. F. WahabK. A. 1987 Problems influencing craftsmen’s productivity in Nigeria build Environment 22 4 317 323 Search in Google Scholar

Othman, A. A. E. (2008). Building the effective architectural team in design firms: The case of the United Arab Emirates. Emirates Journal for Engineering Research, 13(1), pp. 1–11. OthmanA. A. E. 2008 Building the effective architectural team in design firms: The case of the United Arab Emirates Emirates Journal for Engineering Research 13 1 1 11 Search in Google Scholar

Othman, A. A. E., & Abdelwahab, N. M. (2016). A field study investigating the role of integrating risk management into the architectural design process as an approach towards delivering sustainable construction projects. In: Proceedings of the 10th Built Environment Conference, Port Elizabeth, 31 July–2 August, pp. 261–272, ISBN number: 978-0-620-71904-9. OthmanA. A. E. AbdelwahabN. M. 2016 A field study investigating the role of integrating risk management into the architectural design process as an approach towards delivering sustainable construction projects In: Proceedings of the 10th Built Environment Conference Port Elizabeth 31 July–2 August 261 272 ISBN number: 978-0-620-71904-9. Search in Google Scholar

Othman, A. A. E., & El-Gendawy, A. H. S. (2010). Improving construction sustainability through integrating suppliers and manufacturers in the design process. In: Proceedings of the 2nd International Conference on Construction In Developing Countries (ICCDC–II) “Advancing and Integrating Construction Education, Research & Practice” 3–5 August 2010, Cairo, Egypt, pp. 119–134. OthmanA. A. E. El-GendawyA. H. S. 2010 Improving construction sustainability through integrating suppliers and manufacturers in the design process In: Proceedings of the 2nd International Conference on Construction In Developing Countries (ICCDC–II) “Advancing and Integrating Construction Education, Research & Practice” 3–5 August 2010 Cairo, Egypt 119 134 Search in Google Scholar

Othman, A. A. E., & Nadim, W. (2010). Towards establishing an international sustainability index for the construction industry: A literature review. In: Proceedings of the First International Conference on Sustainability and the Future, The British University, Cairo, 23–25 November, pp. 222–235. OthmanA. A. E. NadimW. 2010 Towards establishing an international sustainability index for the construction industry: A literature review In: Proceedings of the First International Conference on Sustainability and the Future The British University, Cairo 23–25 November 222 235 Search in Google Scholar

Othman, A. A. E., & Sokkar, D. A. (2019). Enhancing the performance of architectural design firms through addressing the gap of workforce skills in developing countries: A good-to-great approach. Organisation, Technology and Management in Construction: An International Journal, 11(1), pp. 1911–1924. OthmanA. A. E. SokkarD. A. 2019 Enhancing the performance of architectural design firms through addressing the gap of workforce skills in developing countries: A good-to-great approach Organisation, Technology and Management in Construction: An International Journal 11 1 1911 1924 10.2478/otmcj-2018-0016 Search in Google Scholar

Othman, A. A. E., Ghaly, M., & ZainulAbidin, N. (2014). Lean principles: An innovative approach for achieving sustainability in the egyptian construction industry. Organisation, Technology and Management in Construction: An International Journal, 6(1), pp. 917–932. OthmanA. A. E. GhalyM. ZainulAbidinN. 2014 Lean principles: An innovative approach for achieving sustainability in the egyptian construction industry Organisation, Technology and Management in Construction: An International Journal 6 1 917 932 10.5592/otmcj.2014.1.2 Search in Google Scholar

Othman, A., & Harinarain, N. (2009). Managing risks associated with the JBCC(principal building agreement) from theSouth African contractor’s perspective. Acta Structilia, 16(1), pp. 83–119. OthmanA. HarinarainN. 2009 Managing risks associated with the JBCC(principal building agreement) from theSouth African contractor’s perspective Acta Structilia 16 1 83 119 Search in Google Scholar

Parkin, S., Sommer, F., & Uren, S. (2003). Sustainable development: Understanding the concept and practical challenge. Proceedings of the Institution of Civil Engineers, Engineering Sustainability, 156(1), pp. 19–26. ParkinS. SommerF. UrenS. 2003 Sustainable development: Understanding the concept and practical challenge Proceedings of the Institution of Civil Engineers, Engineering Sustainability 156 1 19 26 10.1680/ensu.2003.156.1.19 Search in Google Scholar

RIBA. (2013). RIBA Plan of Work 2013. Royal Institute of British Architects, London. RIBA 2013 RIBA Plan of Work 2013 Royal Institute of British Architects London Search in Google Scholar

Richardson, S. (2007). What Is a skill shortage? National Centre for Vocational Education Research, Adelaide, Australia. Available at https://www.ncver.edu.au/research-and-statistics/publications/all-publications/what-is-a-skill-shortage on [Accessed 15 September, 2018]. RichardsonS. 2007 What Is a skill shortage? National Centre for Vocational Education Research, Adelaide, Australia Available at https://www.ncver.edu.au/research-and-statistics/publications/all-publications/what-is-a-skill-shortage on [Accessed 15 September, 2018]. Search in Google Scholar

Rodriguez, S., Roman, M., Sturhahn, S., & Terry, E. (2002). Sustainability assessment and reporting for the University of Michigan’s Ann Arbor Campus. Master’s Thesis. University of Michigan, Ann Arbor, pp. 1–396. RodriguezS. RomanM. SturhahnS. TerryE. 2002 Sustainability assessment and reporting for the University of Michigan’s Ann Arbor Campus Master’s Thesis. University of Michigan Ann Arbor 1 396 Search in Google Scholar

Roodman, D. M., & Lenssen, N. A. (1995). Building revolution: How ecology health concerns are transforming construction. Paper 124. World Watch Institute, Washington, DC. RoodmanD. M. LenssenN. A. 1995 Building revolution: How ecology health concerns are transforming construction. Paper 124 World Watch Institute Washington, DC Search in Google Scholar

Sarkis, J. (2014). Green Supply Chain Management. Momentum Press, New York City. SarkisJ. 2014 Green Supply Chain Management Momentum Press New York City 10.1115/1.860281 Search in Google Scholar

Segerstedt, A., & Olofsson, T. (2010). Supply chains in the construction industry. Supply Chain Management, 15(5), pp. 347–353. SegerstedtA. OlofssonT. 2010 Supply chains in the construction industry Supply Chain Management 15 5 347 353 10.1108/13598541011068260 Search in Google Scholar

Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), pp. 111–118. ShashA. A. 1993 Factors considered in tendering decisions by top UK contractors Construction Management and Economics 11 2 111 118 10.1080/01446199300000004 Search in Google Scholar

Simangunsong, E., Hendry, L. C., & Stevens, M. (2016). Managing supply chain uncertainty with emerging ethical issues. International Journal of Operations & Production Management, 36(10), pp. 1272–1307. SimangunsongE. HendryL. C. StevensM. 2016 Managing supply chain uncertainty with emerging ethical issues International Journal of Operations & Production Management 36 10 1272 1307 10.1108/IJOPM-12-2014-0599 Search in Google Scholar

Sisco, C., Chorn, B., & Pruzan, P. M. (2010). Supply Chain Sustainability A Practical Guide. UN Global Compact and Business for Social Responsibility, p. 68. SiscoC. ChornB. PruzanP. M. 2010 Supply Chain Sustainability A Practical Guide UN Global Compact and Business for Social Responsibility 68 Search in Google Scholar

Smith, J., & Wyatt, R. (1998). Criteria for strategic decision making at the pre-briefing stage. In: Hughes, W. (ed.), Association of Research in Construction Management (ARCOM), Proceedings of the 14th Annual. Conference, 9–11 September, Reading University, UK, pp. 300–309. SmithJ. WyattR. 1998 Criteria for strategic decision making at the pre-briefing stage In: HughesW. (ed.), Association of Research in Construction Management (ARCOM), Proceedings of the 14th Annual. Conference 9–11 September Reading University, UK 300 309 Search in Google Scholar

Subramani, T., Sruthi, P. S., & Kavitha, M. (2014). Causes of cost overrun in construction. IOSR Journal of Engineering, 4(6), pp. 1–7. SubramaniT. SruthiP. S. KavithaM. 2014 Causes of cost overrun in construction IOSR Journal of Engineering 4 6 1 7 10.9790/3021-04640107 Search in Google Scholar

The National Economic Development Office. (1987). Achieving Quality on Building Sites. National Economic Development Office, London, pp. 18–19. The National Economic Development Office 1987 Achieving Quality on Building Sites National Economic Development Office London 18 19 Search in Google Scholar

Thunberg, M., Rudberg, M., & Gustavsson, T. K. (2017). Categorising on-site problems: A supply chain management perspective. Construction Innovation, 17(1), pp. 90–111. ThunbergM. RudbergM. GustavssonT. K. 2017 Categorising on-site problems: A supply chain management perspective Construction Innovation 17 1 90 111 10.1108/CI-10-2015-0059 Search in Google Scholar

USEPA. (2009). Basic Information. The United States Environmental Protection Agency (USEPA). [Online]. Available at http://www.epa.gov/sustainability/basicinfo.htm [accessed 29 August, 2019]. USEPA 2009 Basic Information. The United States Environmental Protection Agency (USEPA) [Online]. Available at http://www.epa.gov/sustainability/basicinfo.htm [accessed 29 August, 2019]. Search in Google Scholar

Valdés-Rodríguez, O. A., & Pérez-Vázque, A. (2011). Sustainable livelihoods: An analysis of the methodology [Modos De Vida Sustentable: Un Análisis De Las Metodologías]. Tropical and Subtropical Agroecosystems, 14(2011), pp. 91–99. Valdés-RodríguezO. A. Pérez-VázqueA. 2011 Sustainable livelihoods: An analysis of the methodology [Modos De Vida Sustentable: Un Análisis De Las Metodologías] Tropical and Subtropical Agroecosystems 14 2011 91 99 Search in Google Scholar

Veenendaal, J. (1998). Analysing the impact of change orders on a schedule. Cost Engineering, 40(9), pp. 33–39. VeenendaalJ. 1998 Analysing the impact of change orders on a schedule Cost Engineering 40 9 33 39 Search in Google Scholar

Vrijhoef, R. (1998). Co-makership in construction: Towards construction supply chain management. MSc thesis, Delft University of Technology, Delft. VrijhoefR. 1998 Co-makership in construction: Towards construction supply chain management MSc thesis, Delft University of Technology Delft Search in Google Scholar

Vrijhoef, R., & Koskela, L. (2000). The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management, 6(2000), pp. 169–178. VrijhoefR. KoskelaL. 2000 The four roles of supply chain management in construction European Journal of Purchasing & Supply Management 6 2000 169 178 10.1016/S0969-7012(00)00013-7 Search in Google Scholar

Wantanakorn, D., Mawdesley, M. J., & Askew, W. H. (1999). Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112–120. WantanakornD. MawdesleyM. J. AskewW. H. 1999 Management errors in construction Engineering, Construction and Architectural Management 6 2 112 120 10.1108/eb021104 Search in Google Scholar

Whyte, A., & Scott, D. (2010). Life-cycle costing analysis to assist design decisions: Beyond 3D building information modelling. In: Proceedings of the International Conference on Computing in Civil and Building Engineering, University of Nottingham. WhyteA. ScottD. 2010 Life-cycle costing analysis to assist design decisions: Beyond 3D building information modelling In: Proceedings of the International Conference on Computing in Civil and Building Engineering University of Nottingham Search in Google Scholar

Willmott Dixon Group. (2015). Willmott Dixon Group. [Online]. Available at http://www.willmottdixon.co.uk/contact [Accessed 15 March, 2019]. Willmott Dixon Group 2015 Willmott Dixon Group [Online]. Available at http://www.willmottdixon.co.uk/contact [Accessed 15 March, 2019]. Search in Google Scholar

World Commission on Environment and Development. (1987). Our Common Future. Oxford University Press, Oxford. World Commission on Environment and Development 1987 Our Common Future Oxford University Press Oxford Search in Google Scholar

WS Atkins Consultants. (2001), Sustainable Construction: Company Indicator, CIRIA C563, CIRIA, London. WS Atkins Consultants 2001 Sustainable Construction: Company Indicator CIRIA C563, CIRIA London Search in Google Scholar

Xie, C., Wu, D., & Hu, X. (2010). A case study of multi-team communications in construction design. Supply Chain Management, 15(5), pp. 363–370. XieC. WuD. HuX. 2010 A case study of multi-team communications in construction design Supply Chain Management 15 5 363 370 10.1108/13598541011068279 Search in Google Scholar

eISSN:
1847-6228
Langue:
Anglais
Périodicité:
Volume Open
Sujets de la revue:
Engineering, Introductions and Overviews, other