À propos de cet article
Catégorie d'article: Technical Paper
Publié en ligne: 27 juil. 2020
Pages: 2245 - 2255
Reçu: 25 déc. 2019
Accepté: 08 mai 2020
DOI: https://doi.org/10.2478/otmcj-2020-0020
Mots clés
© 2020 Reinhard F. Wagner, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Example of the cost breakdown for an EPC project with potential savings
Cost Element | Cost Breakdown before savings | Team integration | Productivity | Transaction costs | Schedule accel. | ||
---|---|---|---|---|---|---|---|
Owner | 13 | 50% | 30% | 20% | |||
Project Management | 6 | 50% | 30% | 20% | |||
Construction & Start-Up Management | 8 | 50% | 30% | 10% | 20% | ||
Engineering | 14 | 30% | 10% | 20% | |||
Equipment | 21 | 30% | |||||
Bulk Materials | 11 | 10% | |||||
Construction Labor | 12 | 30% | 10% | 20% | |||
Other Construction Costs (e.g. site logist.) | 2 | 10% | 20% | ||||
Contingency | 6 | 50% | |||||
Special Costs (Legal, Travel etc) | 7 | 80% | |||||
100 |