Cost Element | Cost Breakdown before savings | Team integration | Productivity | Transaction costs | Schedule accel. | ||
---|---|---|---|---|---|---|---|
Owner | 13 | 50% | 30% | 20% | |||
Project Management | 6 | 50% | 30% | 20% | |||
Construction & Start-Up Management | 8 | 50% | 30% | 10% | 20% | ||
Engineering | 14 | 30% | 10% | 20% | |||
Equipment | 21 | 30% | |||||
Bulk Materials | 11 | 10% | |||||
Construction Labor | 12 | 30% | 10% | 20% | |||
Other Construction Costs (e.g. site logist.) | 2 | 10% | 20% | ||||
Contingency | 6 | 50% | |||||
Special Costs (Legal, Travel etc) | 7 | 80% | |||||