This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Abdi, H. (2010), Coefficient of variation, in: N. Salkind, (Ed), Encyclopedia of research design, Sage, Thousand Oaks, pp. 1-5.AbdiH(2010),Coefficient of variation, in:SalkindN, (Ed),Encyclopedia of research design,Sage,Thousand Oaks, pp.1–5.Search in Google Scholar
Aczel, A.D., Sounderpandian, J. (2009), Complete business statistics, McGraw Hill Education, New York.AczelA.D.SounderpandianJ(2009),Complete business statistics,McGraw Hill Education,New York.Search in Google Scholar
Banihashemi, S.A., Khalilzadeh, M., Antucheviciene, J., Saparauskas, J. (2021), Trading off time-cost-quality in construction project scheduling problems with fuzzy SWARA-TOPSIS approach, Buildings, Vol. 11, p. 387.BanihashemiS.A.KhalilzadehM.AntuchevicieneJ.SaparauskasJ(2021),Trading off time–cost–quality in construction project scheduling problems with fuzzy SWARA-TOPSIS approach,Buildings, Vol.11, p.387.Search in Google Scholar
Befani, B. (2010), Criteria and theory in the evaluation of organizations, Evaluation, Vol. 16, No. 3, pp. 249-262.BefaniB(2010),Criteria and theory in the evaluation of organizations,Evaluation, Vol.16, No.3, pp.249–262.Search in Google Scholar
Belout, A., Gauvreau, C. (2003), Factors influencing project success: The impact of human resource management, International Journal of Project Management, Vol. 22, pp. 1-11.BeloutA.GauvreauC(2003),Factors influencing project success: The impact of human resource management,International Journal of Project Management, Vol.22, pp.1–11.Search in Google Scholar
Bhote, K., Bhote, A.K. (2000), World class quality. Using design of experiments to make it happen, AMACOM, New York.BhoteK.BhoteA.K.(2000),World class quality.Using design of experiments to make it happen,AMACOM,New York.Search in Google Scholar
Breese, R., Jenner, S., Serra, C.E.M., Thorp J. (2015), Benefits management: Lost and found in translation, International Journal of Project Management, Vol. 33, pp. 1438-1451.BreeseR.JennerS.SerraC.E.M.ThorpJ(2015),Benefits management: Lost and found in translation,International Journal of Project Management, Vol.33, pp.1438–1451.Search in Google Scholar
Caccamese, A., Bragantini, D. (2013), Beyond the iron triangle: Year zero, PM World Journal Vol. II, Iss. XII, December 2013, https://pmworldlibrary.net/wp-content/uploads/2013/12/pmwj17-dec2013-caccamese-bragantini-beyond-iron-triangle-year-zero-ipma-SecondEdition.pdf.CaccameseA.BragantiniD(2013),Beyond the iron triangle: Year zero,PM World JournalVol.II, Iss.XII,December2013,https://pmworldlibrary.net/wp-content/uploads/2013/12/pmwj17-dec2013-caccamese-bragantini-beyond-iron-triangle-year-zero-ipma-SecondEdition.pdf.Search in Google Scholar
Faten Albtoush, A.M., Doh, S.I., Abdul, B.B., Abdul, R., Ja’far, A.A. (2020), Factors effecting the cost management in construction projects, International Journal of Civil Engineering and Technology, Vol. 11, No. 1, pp. 105-111.Faten AlbtoushA.M.DohS.I.AbdulB.B.AbdulR.Ja’farA.A(2020),Factors effecting the cost management in construction projects,International Journal of Civil Engineering and Technology, Vol.11, No.1, pp.105–111.Search in Google Scholar
Gałecka, M., Smolny, K. (2018), Evaluation of theater activity using Hellwig’s method, Optimum Economic Studies, Vol. 2, No. 92, pp. 38-50.GałeckaM.SmolnyK(2018),Evaluation of theater activity using Hellwig’s method,Optimum Economic Studies, Vol.2, No.92, pp.38–50.Search in Google Scholar
Geoff, N. (2010), Likkert scales, levels of measurement and the “laws” of statistics, Advances in Health Science Education, Vol. 15, pp. 625-632.GeoffN(2010),Likkert scales, levels of measurement and the “laws” of statistics,Advances in Health Science Education, Vol.15, pp.625–632.Search in Google Scholar
Grundy, T. (1998), Strategy implementation and project management, International Journal of Project Management, Vol. 16, No. 1, pp. 43-50.GrundyT(1998),Strategy implementation and project management,International Journal of Project Management, Vol.16, No.1, pp.43–50.Search in Google Scholar
Haniff, A.P., Galloway, L. (2022), Modeling strategic alignment in project networks, International Journal of Project Management, Vol. 40, No. 5, pp. 517-530.HaniffA.P.GallowayL(2022),Modeling strategic alignment in project networks,International Journal of Project Management, Vol.40, No.5, pp.517–530.Search in Google Scholar
Helden, G.J., Johnsen, A., Vakkuri, J. (2012), The life-cycle approach to performance management: Implications for public management and evaluation, Evaluation, Vol. 18, No. 2, pp. 159-175.HeldenG.J.JohnsenA.VakkuriJ(2012),The life-cycle approach to performance management: Implications for public management and evaluation,Evaluation, Vol.18, No.2, pp.159–175.Search in Google Scholar
Hellwig, Z. (1968), On the optimal choice of predictors, in: Toward a system of quantitative indicators of components of human resources development, COM/WS/95, retrieved from https://unesdoc.unesco.org/ark:/48223/pf0000158559 [ 19th May 2023].HellwigZ(1968),On the optimal choice of predictors, in: Toward a system of quantitative indicators of components of human resources development,COM/WS/95,Retrieved from https://unesdoc.unesco.org/ark:/48223/pf0000158559[19th May 2023.Search in Google Scholar
Ika, L.A. (2009), Project success as a topic in project management journals, Project Management Journal, Vol. 37, No. 4, pp. 31-41.IkaL.A.(2009),Project success as a topic in project management journals,Project Management Journal, Vol.37, No.4, pp.31–41.Search in Google Scholar
Kafle, S.D. (2019), Correlation and regression analysis using SPSS, OECM Journal of Management, Technology & Social Sciences, Vol. 1, Iss. 1, pp. 126-132.KafleS.D.(2019),Correlation and regression analysis using SPSS,OECM Journal of Management, Technology & Social Sciences, Vol.1, Iss.1, pp.126–132.Search in Google Scholar
Kozien, E. (2018), Using the risk-list method for risk assessment in the project, 31st International Scientific Conference on Economic and Social Development - Legal Challenges of Modern World: Economic and Social Development, Split, pp. 152-158.KozienE(2018),Using the risk-list method for risk assessment in the project,31st International Scientific Conference on Economic and Social Development - Legal Challenges of Modern World: Economic and Social Development,Split, pp.152–158.Search in Google Scholar
Kozien, E. (2019), Ocena sprawnosci realizcji projektow, Wydawnictwo Uniwersytetu Ekonomicznego w Krakowie, Krakow.KozienE(2019),Ocena sprawnosci realizcji projektów,Wydawnictwo Uniwersytetu Ekonomicznego w Krakówie,Krakow.Search in Google Scholar
Kozien, E., Kozien, M.S. (2017), Interval analysis as a method of measurement of uncertainity in the check-list method applied to identification of stage phase of companies, 26th International Scientific Conference on Economic and Social Development - Building Resilient Society: Economic and Social Development, Zagreb, pp. 210-215.KozienE.KozienM.S.(2017),Interval analysis as a method of measurement of uncertainity in the check-list method applied to identification of stage phase of companies,26th International Scientific Conference on Economic and Social Development - Building Resilient Society: Economic and Social Development,Zagreb, pp.210–215.Search in Google Scholar
Kozien, E., Kozien, M.S. (2018), Using the fuzzy logic description for the ex ante risk assessment in the project, 35th International Scientific Conference on Economic and Social Development - Sustainability from an Economic and Social Perspective: Economic and Social Development, Lisbon, pp. 224-231.KozienE.KozienM.S.(2018),Using the fuzzy logic description for the ex ante risk assessment in the project,35th International Scientific Conference on Economic and Social Development - Sustainability from an Economic and Social Perspective: Economic and Social Development,Lisbon, pp.224–231.Search in Google Scholar
Likert, R. (1932), A technique for the measurements of attitudes, Archives of Psychology, Vol. 140, pp. 1-55.LikertR(1932),A technique for the measurements of attitudes,Archives of Psychology, Vol.140, pp.1–55.Search in Google Scholar
Murray-Webster, R., Dalcher, D. (2019), APM Body of Knowledge, Association for Project Management.Murray-WebsterR.DalcherD(2019),APM Body of Knowledge,Association for Project Management.Search in Google Scholar
OECD. (2002), Evaluation and aid effectiveness: Glossary and key terms in evaluation and results based management, OECD Development Assistance Committee (DAC).OECD. (2002),Evaluation and aid effectiveness: Glossary and key terms in evaluation and results based management,OECD Development Assistance Committee (DAC).Search in Google Scholar
OECD. (2019), Better criteria for better evaluation. Revised evaluation criteria definitions and principles for use, OECD/DAC Network on Development Evaluation.OECD. (2019),Better criteria for better evaluation.Revised evaluation criteria definitions and principles for use,OECD/DAC Network on Development Evaluation.Search in Google Scholar
Pinto, J., Davis, K., Ika, L., Jugdev, K., Zwikael, O. (2021), Call for papers for special issue on project success, International Journal of Project Management, Vol. 39, pp. 213–215.PintoJ.DavisK.IkaL.JugdevK.ZwikaelO(2021),Call for papers for special issue on project success,International Journal of Project Management, Vol.39, pp.213–215.Search in Google Scholar
Pollack, J., Helm, J., Adler, D. (2018), What is the iron triangle, and how has it changed? International Journal of Managing Projects in Business, Vol. 11, No. 2, pp. 527–547.PollackJ.HelmJ.AdlerD(2018),What is the iron triangle, and how has it changed?International Journal of Managing Projects in Business, Vol.11, No.2, pp.527–547.Search in Google Scholar
Project Management Institute. (2020), Why Social Impact Matters: Delivering Meaningful Change Through Projects. Pulse of the Profession, retrieved from https://www.pmi.org/learning/library/pulse-indepth-4-why-social-impact-matters-12358 [19th May 2023].Project Management Institute. (2020),Why Social Impact Matters: Delivering Meaningful Change Through Projects.Pulse of the Profession,retrieved from https://www.pmi.org/learning/library/pulse-indepth-4-why-social-impact-matters-12358[19th May 2023.Search in Google Scholar
Rani, H.A. (2013), The iron triangle as the triple constraints in project management, Jurnal Teknik Sipil, Vol. 2, pp. 1–12.RaniH.A.(2013),The iron triangle as the triple constraints in project management,Jurnal Teknik Sipil, Vol.2, pp.1–12.Search in Google Scholar
Samset, K., Volden, G.H. (2016), Front-end definition of projects: The paradoxes and some reflections regarding project management and project governance, International Journal of Project Management, Vol. 34, pp. 297–313.SamsetK.VoldenG.H.(2016),Front-end definition of projects: The paradoxes and some reflections regarding project management and project governance,International Journal of Project Management, Vol.34, pp.297–313.Search in Google Scholar
Senouci, A., Ismail, A., Eldin, N. (2016), Time delay and cost overrun in Qatari public construction projects, Procedia Engineering, Vol. 164, pp. 368–375.SenouciA.IsmailA.EldinN(2016),Time delay and cost overrun in Qatari public construction projects,Procedia Engineering, Vol.164, pp.368–375.Search in Google Scholar
Shenhar, A. (2004), Strategic project leadership: Toward a strategic approach to project management, R&D Management, Vol. 34, No. 5, pp. 569–578.ShenharA(2004),Strategic project leadership: Toward a strategic approach to project management,R&D Management, Vol.34, No.5, pp.569–578.Search in Google Scholar
Silva, G.A., Warnakulasuriya, B.N.F., Arachchige, B. (2016), Criteria for construction project success: A literature review, Thirteenth International Conference on Business Management (ICBM), Colombo, pp. 697–717.SilvaG.A.WarnakulasuriyaB.N.F.ArachchigeB(2016),Criteria for construction project success: A literature review,Thirteenth International Conference on Business Management (ICBM),Colombo, pp.697–717.Search in Google Scholar
Simushi, S., Wium, J. (2020), Time and cost overruns on large projects: Understanding the root cause, Journal of Construction in Developing Countries, Vol. 25, No. 1, pp. 129–146.SimushiS.WiumJ(2020),Time and cost overruns on large projects: Understanding the root cause,Journal of Construction in Developing Countries, Vol.25, No.1, pp.129–146.Search in Google Scholar
Stownik Języka Polskiego. (1978), Vol. 2, p. 436, PWN, Warszawa.Stownik Jⱸzyka Polskiego. (1978), Vol.2, p.436,PWN,Warszawa.Search in Google Scholar
Smith, J.W., Magnusson, F. (2015), The project management triangle: A hidden framework? A qualitative study of ERP implementations in Sweden, University of Gothenburg. Report nr. 2015:012.SmithJ.W.MagnussonF(2015),The project management triangle: A hidden framework? A qualitative study of ERP implementations in Sweden,University of Gothenburg.Report nr.2015:012.Search in Google Scholar
Stojcetovic, B., Lazarevic, D., Prlincevic, B., Stajcic, D., Miletic, S. (2014), Project management: cost, time and quality, 8th International Quality Conference, Kragujevac, pp. 345-350.StojcetovicB.LazarevicD.PrlincevicB.StajcicD.MileticS(2014),Project management: cost, time and quality,8th International Quality Conference,Kragujevac, pp.345–350.Search in Google Scholar
Tangsgaard, E., Boye, S., Nogaard, R., Winslow, M., Ostegaard-Nielsen, M. (2022), Public and private management: now, is there a difference? A systematic review, International Public Management Journal, pp. 1-34, https://doi.org/10.1080/109 67494.2022.2109787TangsgaardE.BoyeS.NogaardR.WinslowM.Ostegaard-NielsenM(2022),Public and private management: now, is there a difference? A systematic review,International Public Management Journal, pp.1–34, https://doi.org/10.1080/10967494.2022.2109787Open DOISearch in Google Scholar
Toor, S., Ogunlana, S. (2010), Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects, International Journal of Project Management, Vol. 28, pp. 228-236, https://doi.org/10.1016/jjjproman.2009.05.005.ToorS.OgunlanaS(2010),Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects,International Journal of Project Management, Vol.28, pp.228–236, https://doi.org/10.1016/ijproman.2009.05.005.Open DOISearch in Google Scholar
Volden, G.H., Welde, M. (2022), Public project success? Measuring the nuances of success through ex post evaluation, International Journal of Project Management, Vol. 40, No. 3, pp. 703-714, https://doi.org/10.1016/j. ijproman.2022.06.006.VoldenG.H.WeldeM(2022),Public project success? Measuring the nuances of success through ex post evaluation,International Journal of Project Management, Vol.40, No.3, pp.703–714, https://doi.org/10.1016/j. ijproman.2022.06.006.Open DOISearch in Google Scholar
Wyngaard, C.J., Pretorius, J.H.C., Pretorius, L. (2012), Theory of the triple constraint - a conceptual review, IEEE International Conference on Industrial Engineering and Engineering Management, https://doi.org/10.1109/IEEM.2012.6838095.WyngaardC.J.PretoriusJ.H.C.PretoriusL(2012),Theory of the triple constraint - a conceptual review,IEEE International Conference on Industrial Engineering and Engineering Management, https://doi.org/10.1109/IEEM.2012.6838095.Open DOISearch in Google Scholar
Zwikael, O., Meredith, J. (2021), Evaluating the success of projects and the performance of its leaders, IEEE Transactions on Engineering Management, Vol. 68, No. 6, pp. 1745–1757.ZwikaelO.MeredithJ(2021),Evaluating the success of projects and the performance of its leaders,IEEE Transactions on Engineering Management, Vol.68, No.6, pp.1745–1757.Search in Google Scholar