[Chelaka, M., Abeyasinghe, L., Greenwood, D. J., Johansen, D. E. (2001). An efficient method for scheduling construction projects with resource constraints. Int. J. Proj. Manag., 19(1), 29–45. https://doi.org/10.1016/S0263-7863(00)00024-710.1016/S0263-7863(00)00024-7]Open DOISearch in Google Scholar
[Ayalew, T., Dakhli, Z., Lafhaj, Z. (2016). Assessment on Performance and Challenges of Ethiopian Construction Industry. Journal of Architecture and Civil Engineering, 2, 1–11.]Search in Google Scholar
[Bacon, R. W., Besant-Jones, J. E. (1998). Estimating construction costs and schedules: experience with power generation projects in developing countries. Energy Policy, 26(4), 317–333. https://doi.org/10.1016/S0301-4215(97)00164-X10.1016/S0301-4215(97)00164-X]Open DOISearch in Google Scholar
[Cajzek, R., Klanšek, U. (2016). Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs. Technical Gazette, 23(1), 9–18.10.17559/TV-20140108112928]Search in Google Scholar
[Christodoulou, S. E., Tezias, E. S., Galaras, K. A. (2012). Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project’s duration and cost. International Journal of Project Organisation and Management, 4(4), 322–338. https://doi.org/10.1504/IJPOM.2012.05032810.1504/IJPOM.2012.050328]Search in Google Scholar
[Del Pico, Wayne, J. (2013). Project control: integrating cost and schedule in construction. Hoboken, New Jersey: John Wiley & Sons, Inc. https://doi.org/10.1002/978111880271710.1002/9781118802717]Open DOISearch in Google Scholar
[EEA. (2008). The Current State of the Construction Industry. Addis Ababa, Ethiopia.]Search in Google Scholar
[PPA. (2010). Federal Public Procurement Directive, June 2010, Ethiopia. Retrieved from http://www.ppa.gov.et/index.php?option=com_joomdoc&task=document.download&path=legislation%2Fdirectives%2Fprocurement%2Fpublic-procurement-directive-englishpdf]Search in Google Scholar
[Franck, B., Neumann, K., Schwindt, C. (2001). Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling. OR–Spektrum 23(3), 297–324. https://doi.org/10.1007/PL0001335610.1007/PL00013356]Open DOISearch in Google Scholar
[Gebrehiwet, T., Luo, H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Eng. 196, 366–74. https://doi.org/10.1016/j.proeng.2017.07.21210.1016/j.proeng.2017.07.212]Open DOISearch in Google Scholar
[Heinz, S., Beck, J. C. (2011). Solving resource allocation/scheduling problems with constraint integer programming. Association for the Advancement of Artificial Intelligence. Retrieved from https://tidel.mie.utoronto.ca/pubs/cip-coplas11.pdf]Search in Google Scholar
[Ibrahim, M., Amund, B., Nabil, D. (2012). Causes of Delay in Road Construction Projects. Journal of Management in Engineering (ASCE), 28(3), 300–310.10.1061/(ASCE)ME.1943-5479.0000096]Search in Google Scholar
[Liu, S.-S., Wang, C.-J. (2008). Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction, 17(8), 966–974.10.1016/j.autcon.2008.04.006]Search in Google Scholar
[Ma, G., Wang, A., Li, N., Gu, L., Ai, Q. (2014). Improved Critical Chain Project Management Framework for Scheduling Construction Projects. Journal of Construction Engineering and Management, 140(12). https://doi.org/10.1061/(ASCE)CO.1943-7862.000090810.1061/(ASCE)CO.1943-7862.0000908]Open DOISearch in Google Scholar
[McTague, B. (2002). Productivity improvements on Alberta major construction projects: Phase I - Back to Basics. Alberta Economic Development.]Search in Google Scholar
[MoUD. (2013). Ministry of Urban Development and Construction. Directives for the Registration of Construction Professionals and Contractors, April 2013, Addis Ababa. Retrieved from https://www.ethioconstruction.net/sites/default/files/Law/Files/Directives%20for%20Ethiopian%20Contractors%20Registration.doc]Search in Google Scholar
[MoWUD. (1995). General Conditions of Contract, Ethiopia. Retrieved from https://www.ethioconstruction.net/sites/default/files/Law/Files/General%20Conditions%20of%20Contract%2C%20MoWUD.pdf]Search in Google Scholar
[Wubishet, J. (2004). Performances for public construction projects in developing countries: federal road & educational building projects in Ethiopia. Trondheim: Norwegian University of Science and Technology, Faculty of Social Sciences and Technology Management, Department of Industrial Economics and Technology Management.]Search in Google Scholar